14.1 Risk Identification and Assessment TEMPLATEhumanelement.biz/SEQ System/4. Forms and Work Method...
Transcript of 14.1 Risk Identification and Assessment TEMPLATEhumanelement.biz/SEQ System/4. Forms and Work Method...
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 1 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
FORM 14.1 RISK IDENTIFICATION AND ASSESSMENT TEMPLATE Site: Assessment completed by: Date:
Area Assessed
Describe the specific location of the hazard
What are the Hazards?
Existing Controls What actions are required?
Enter further actions required to remove/manage the risk refer to table 2 below for priority requirements
Risk Rating Refer to table 1
below
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
-
Action Owner: ………………………Due date: / /
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 2 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
Area Assessed Describe the specific location of the hazard
What are the Hazards?
Existing Controls What actions are required?
Enter further actions required to remove/manage the risk refer to table 2 below for priority requirements
Risk Rating Refer to table 1
below
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
Action Owner: ………………………Due date: / /
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 3 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
Table 1 – Risk Assessment Matrix
How likely is it to be that bad? ++
Very likely. Could happen at any
time
+ Likely.
Could happen sometime
- Unlikely.
Could happen but rarely
- - Very unlikely.
Could happen but probably never will
How
sev
ere
coul
d th
e ou
tcom
e be
? DEATH Death, permanently disability or ill health 1 1 2 3
!!! Long term illness or serious injury 1 2 3 4
!! Medical attention & days off work 2 3 4 5
! First aid needed 3 4 5 6
Table 2 – Severity Rating by WHS, Environment and Quality Standards and Associated Action Priority WHS Environmental Quality RISK ACTION PRIORITY
CO
NSE
QU
ENC
E Kill or cause permanent disability or ill health
Critical environmental issue or pollution potential that could threaten the survival of the organization
Critical quality issue. Could threaten the survival of the organisation
1-2 Immediate action required to reduce the risk
!!! Cause long term illness or permanent injury
Long term pollution or significant cost to organisation
Recall or significant cost to organisation 3-4 Action in a timely manner,
WMS to be completed
!! Cause someone to need medical attention and be off work for several days
Transient pollution requiring clean up or cost to organisation
Customer complaint involving non conforming product 5-6 Schedule action to review
and reduce the risk
! Cause someone to need first aid Minor pollution No clean up required Minor non conformance detected
before it reaches the customer ALL RISKS MUST BE ELIMINATED
WHERE POSSIBLE
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 4 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
Signoff of Risk Assessment and Actions Completed by: .…………………………………..… Signature: ...………..............………….... Date: …………… Agreed by Manager: ………………………..…….. Signature: ...….......……………...…....... Date: …………… Comments: * NOTE – this form is to be used to identify risks and provide a preliminary assessment. The Company SEQ System form 19.1 (Corrective Action Report) must be completed for all medium to high risks which are not able to be mitigated immediately.
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 5 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
PROCESS TO BE CARRIED OUT The process of risk ranking any hazard above should be carried out in the following manner: • Ensure that the consultative group has sufficient expertise
and information regarding the hazard. • Identify a realistic scenario and assess the probable severity
or other impact. Table 1 • Assess in consultation with other employees the probability
of the chosen severity occurring. • From Matrix 1 read off the number at the meeting point of
the column & row selected. • The risk rating priority is the Word shown against the number
in Table 1.
This risk ranking will be used to determine the priority given to reducing the hazard and the type of controls applied. Finally we need to decide on the controls or safeguards that we need to apply to the risk. Sometimes this is obvious and sometimes the control is defined in legislation but in other cases we need to apply controls on the basis of the control hierarchy and work our way down until we come across a viable control.
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 6 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
HIERARCHY OF CONTROLS In NSW the legislation requires us to apply the controls in the following hierarchy
• Elimination • Substitution • Mitigation • Isolation • Work organisations • Personal Protective Equipment (PPE)
To simplify this list we normally use the following criteria: Elimination/substitution This relates to removing the risk either by completely eliminating it or substituting another process that reduces the risk. Engineering solution This means that we apply a physical barrier or other engineering solution to the risk. The reliability of this solution is generally good but the cost is sometimes high. Administrative controls These include training, PPE supervision etc. Whilst they are attractive in terms of cost and are often quick to apply the reliability of these controls is generally poor as they rely upon people to ‘do the right thing’. Hazard prompt sheet (over page) The following guidewords are developed to prompt the identification of hazards, and are to be used as guidance only. By no means should this list be considered a definitive and complete set of potential hazards. These should be used in combination with descriptors (prefixes) such as ‘exposure to, loss of control, loss of protection, failure/malfunction/breakdown, etc.’
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 7 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version
14.1 Risk Identification and Assessment TEMPLATE.docx
Doc Name: 14.1 Risk Identification and Assessment TEMPLATE.docx Revision: 1 Updated: 14/04/12 4:36 PM
Review By: 30/6/13 Page 8 of 8
UNCONTROLLED WHEN PRINTED Last Printed: 14/04/12 4:36 PM -‐ for up to date copy refer to the online version