140° 107° 138° 125° 146° 123°UP Mirror Kiosk

1
Fire Evacuation Key Occupany level within area 0 Protected areas: walls, floors, ceilings and doors to achieve 30minute fire resistant construction. Protected areas: walls, floors, ceilings and doors to achieve 60 minute fire resistant construction. Sprinklers System design and installed in compliance with BS EN 12845:2015 & LPC Technical Bulletins Fire Alarm Fire Alarm designed and installed to BS 5839. Smoke & heat detection / emergency lighting by specialist. Please refer to M&E engineer's drawings / specifications. Escape Lighting Emergency escape lighted designed and installed in accordance with BS 5266: Part 1. Please refer to M&E Engineer's drawings for final layout and specification. Smoke Extract Smoke Extract System to be designed and installed in accordance with BS 7346: Part 8. Please refer to M&E Engineer's drawings for final layout and specifica tion. Existing wall to achieve min 60 minute fire rating (suitability of wall to be confirmed on site by Pure Gym Main Contractor 1050 min Minimum Clear Widths Fire Escape Route 30 Exit No. New wall to achieve min of 60min fire rating Fire Escape Route - change of direction Server Combined Store Positions of access points to unit below Mirrors Mirrors Mirrors Mirrors Mirrors Positions of access points to unit below Mirrors DISABLED REFUGE DISABLED REFUGE Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Redundant Kiosk Entrance Lobby FF Comms 600 x 800 DDA Ref door & Fire Exit Spare Store 1 (Ex Office) Flex Cardio Studio Aerobics Store Room Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Raised Dais Spin Studio Mirrors Mirrors Mirrors Free Weights Gym Floor Functional Belfast Sink Vending Male Change (Redundant) Accs WC/SH WF Sunbed UP PT Assessment Area Mirror DOWN DISABLED REFUGE Plant Room FF UP Break Room Locker Room Cleaners Room 1 UP Female Change CH 1 CH 2 CH 1 CH 2 UP Male change Cleaners room 2 Mirrors UP 3 2 12.7m 17.4m 14.7m 45 25 30 2 4 1 20 20 2 1 2 125° 41.1m Total 146° 140° 123° 28.9m Total 54.0m Total 13.5m 55.8m Total 41.7m Total 53.4m Total 47.1m Total 60.7m Total 45.1m Total 57.7m Total 1100mm min existing channel 25 35 25 10 023 IA-ALL-SD Fire Exit Fire Exit Fire Exit 1252 1726 1252 Existing fire door fire resistance to be confirmed. FD30 required. Existing fire door fire resistance to be confirmed. FD30 required. Existing fire door fire resistance to be confirmed. FD30 required. Existing fire door fire resistance to be confirmed. FD60 required. Existing corridor is considered a protected route Existing corridor is considered a protected route as indicated. Exact build up of construction and fire resistance to be confirmed by contractor. Existing corridor is considered a protected route as indicated. Exact build up of construction and fire resistance to be confirmed by contractor. Voids and existing retained M&E and ducting to be checked for correct dampening and fire stopping. Voids and existing retained M&E and ducting to be checked for correct dampening and fire stopping. Voids and existing retained M&E and ducting to be checked for correct dampening and fire stopping. Voids and existing retained M&E and ducting to be checked for correct dampening and fire stopping. Fire escape No.3 only serves existing redundant male changing room Fire integrity to be confirmed and void detection to be retained/maintained for future use. 107° 138° 32.5m Total Air gap Air gap PG Scobie MM4 Air gap Lucozade Scobie MM4 Lucozade Bev Media Air gap PG Scobie MM4 002 IA-SBF-SD 002 IA-SBF-SD 015 IA-ALL-SD 015 IA-ALL-SD 021 IA-RDS-SD 021 IA-RDS-SD 13.9m 17.0m Flex 1200 X X B C D G K K 10 24 26 27 30 29 31 32 34 37 38 39 43 44 45 42 49 28 X H 51 X X X X X X X X X A X 43 28 25 I 43 43 43 52 52 I I E 28 23 22 28 41 41 25 41 41 41 41 G X 12 E E E 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 1800 1200 1200 1200 1200 1200 1200 1200 1200 1200 5 6 8 11 12 14 15 16 17 21 3 9 7 11 1 18 19 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 20 1800 1800 1800 50 50 * * 28 28 28 28 28 23 1200 22 28 1200 22 28 38 X X X X X X X X X 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 2M Run off 1 H H H H H H H H H H H H H H H H H H H H H H H H X X 1800 1800 1800 1200 1200 1200 1200 1200 53 A A A A A A A A A A A A A A A A A A A B C C C C D I 33 28 4 Safe Filing Cabinet DIGI DIGI GANTNER Electrical Room LIFT RWP SVP Electrics Plant Room GF Entrance Lobby GF Existing fire door fire resistance to be confirmed. FD60 required. Pure Gym Ltd Town Centre House The Merrion Centre Leeds LS2 8LY e: [email protected] t: 0113 285 8787 w: www.puregym.com PROJECT TITLE DRAWING TITLE DATE SCALE DRAWN / CHECKED JOB No DRAWING No Rev Rev Date Description Drawn/ Checked DRAWING PURPOSE CONSTRUCTION Aylesbury Shopping Park Unit 10C, Cambridge Cl, Aylesbury, HP20 1DG Fire Evacuation Plan Ground & First Floor Plans 02.09.19 SS/EK 1/200 @ A1 IA-LBF-045 003 - FEP A Proposed Ground Floor Plan Proposed First Floor Plan NOTE: · Proposals must comply with all acoustic, fire & building regulation requirements · No dimensions are to be scaled from this drawing. The contractor is responsible for checking all dimensions on site Drawings to be read in conjunction with Aylesbury site notes. Drawings were not surveyed by Pure Gym but supplied via landlord and not checked. Dimensions will require verification on site. A 15.10.19 Doors added to changing rooms. Rooms defined inline with BOLT. Second entrance pod provision removed. Lockers moved. Flex area increased. Rasied areas removed in changing rooms. EK/PG

Transcript of 140° 107° 138° 125° 146° 123°UP Mirror Kiosk

Page 1: 140° 107° 138° 125° 146° 123°UP Mirror Kiosk

Fire Evacuation Key

Occupany level within area

0

Protected areas: walls, floors, ceilings and doors to achieve 30minute fire resistant

construction.

Protected areas: walls, floors, ceilings and doors to achieve 60 minute fire resistant

construction.

Sprinklers

System design and installed in compliance with BS EN 12845:2015 & LPC Technical Bulletins

Fire Alarm

Fire Alarm designed and installed to BS 5839. Smoke & heat detection / emergency lighting by specialist.

Please refer to M&E engineer's drawings / specifications.

Escape Lighting

Emergency escape lighted designed and installed in accordance with BS 5266: Part 1. Please refer to M&E

Engineer's drawings for final layout and specification.

Smoke Extract

Smoke Extract System to be designed and installed in accordance with BS 7346: Part 8. Please refer to M&E

Engineer's drawings for final layout and specification.

Existing wall to achieve min 60 minute fire rating (suitability of wall to be confirmed on site

by Pure Gym Main Contractor

1050 min

Minimum Clear Widths

Fire Escape Route

30

Exit No.

New wall to achieve min of 60min fire rating

Fire Escape Route - change of direction

Server

Combined Store

Positions of

access points

to unit below

Mirrors Mirrors Mirrors Mirrors Mirrors

Positions of

access points

to unit below

Mirro

rs

DIS

AB

LE

D R

EF

UG

E

DISABLED REFUGE

Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors

Mirro

rs

Mirro

rs

Mirro

rs

Mirro

rs

Mirro

rs

Mirro

rs

Redundant

2.2 sqftEquip_Staff_Locker

3.2 sqftEquip_Coat_Rail 2.9 sqftCoat_Rail

2.2 sqftEquip_Staff_Locker

2.2 sqftEquip_Staff_Locker

2.2 sqftEquip_Staff_Locker

K

i

o

s

k

Equip_Night-Lockers24.2 sqft

Entrance

Lobby FF

Co

mm

s

60

0 x 80

0

DDA Pass Door

DDA Ref

door &

Fire Exit

Spare

Store 1

(Ex Office)

Flex

Cardio

Studio

Aerobics

Store Room

Mirro

rs

Mirro

rs

Mirro

rs

Mirrors Mirrors Mirrors

Mirro

rs

Mirro

rs

Mirro

rs

Mirro

rs

Mirro

rs

Raised

Dais

Spin

Studio

Mirrors MirrorsMirrors

Free Weights

Gym Floor

Functional

Belfast

Sink

Vend

ing

Male Change

(Redundant)

Accs

WC/SH

WF

Sunbed

UP

PT Assessment

Area

Mirror

DOWN

DISABLED REFUGE

Plant

Room FF

UP

Break

Room

Locker

Room

Cleaners

Room 1

14 sqftBreakfast_Bar

EQUIP_NAME

COLOUREQUIP_NAMETOTAL_AREA

UP

Female

Change

EQUIP_NAME

CH 1CH 2

COLOUR

EQUIP_NAMETOTAL_AREA

CH

1

CH

2

EQUIP_NAME

UP

Male

change

Cle

an

ers

ro

om

2

TOTAL_AREAEQUIP_NAME

Mirro

rs

UP

3

2

12.7m

17.4m

14.7m

45

25

30

2

4

1

20

20

2

1

2

1

2

5

°

41.1m

Total

14

6

°

14

0

°

1

2

3

°

28.9m

Total

54.0m

Total

13.5m

55.8m

Total

41.7m

Total

53.4m

Total

47.1m

Total

60.7m

Total

45.1m

Total

57.7m

Total

1100mm min

existin

g c

ha

nn

el

25

35

25

10

023

IA-ALL-SD

Fire Exit

Fire

Exit

Fire

Exit

1252

1726

1252

Existing fire door fire resistance

to be confirmed. FD30 required.

Existing fire door fire resistance

to be confirmed. FD30 required.

Existing fire door

fire resistance

to be confirmed.

FD30 required.

Existing fire door fire resistance

to be confirmed. FD60 required.

Existing corridor is considered a protected route

Existing corridor is considered a

protected route as indicated.

Exact build up of construction

and fire resistance to be

confirmed by contractor.

Existing corridor is considered a

protected route as indicated.

Exact build up of construction

and fire resistance to be

confirmed by contractor.

Voids and existing retained

M&E and ducting to be

checked for correct

dampening and fire

stopping.

Voids and existing retained

M&E and ducting to be

checked for correct

dampening and fire

stopping.

Voids and existing retained

M&E and ducting to be

checked for correct

dampening and fire

stopping.

Voids and existing

retained M&E and

ducting to be

checked for correct

dampening and fire

stopping.

Fire escape No.3 only serves existing redundant

male changing room Fire integrity to be confirmed

and void detection to be retained/maintained for

future use.

1

0

7

°

1

3

8

°

32.5m

Total

Air g

ap

Air g

ap

PG

Sc

ob

ie

M

M4

Air g

ap

Lu

co

za

de

Sc

ob

ie

M

M4

Lu

co

za

de

Be

v M

ed

ia

Air g

ap

PG

Sc

ob

ie

M

M4

002

IA-SBF-SD

002

IA-SBF-SD

015

IA-ALL-SD

015

IA-ALL-SD

021

IA-RDS-SD

021

IA-RDS-SD

13.9m

17.0m

Flex

1200

X X

B

C

D

G

K

K

10

24

2627

30

29

31

32

34

37

38

39

43

44

45

42

49

28

X

H

51

X X X XXXXXX

A

X

43

28

25

I

43

43

43

5252

I

I

E

28

23

22

28

41

41

25

41 41 41 41

G

X

12

E E E

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

180

0

120

0120

0120

0120

0120

0120

0120

0120

0120

0

5

6

8

11

12

14

15

16

1721

3

9

7

11

1

18

19

41 41 41 41 41

41 41 41 41 41

41 41 41 41 41

41 41 41 41 41

41 41 41 41 41

20

180

0180

0180

0

50

50

*

*

28

28

28

28

28

23

1200

22

28

1200

22

28

38

X X X XXXXX X

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

2M Run

off

1

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

XX

180

0180

0180

0

1200 1200 120012001200

53

A A A A A A A A A A A A A A A A A A A

B

C C C C

D

I

33

28

4

Safe

Filin

g

Ca

bin

et

DIGI

DIGI

GANTNER

DOOR_INT-Custom

DOOR_INT-Custom

Electrical Room

LIFT

RW

P

SV

P

Electrics

Plant

Room GF

Entrance

Lobby GF

Existing fire door fire resistance

to be confirmed. FD60 required.

Pure Gym Ltd

Town Centre House

The Merrion Centre

Leeds

LS2 8LY

e: [email protected]

t: 0113 285 8787

w: www.puregym.com

PROJECT TITLE DRAWING TITLE

DATE SCALEDRAWN / CHECKED JOB No DRAWING No

Rev

Rev Date Description Drawn/ Checked

DRAWING PURPOSE

CONSTRUCTION

Aylesbury Shopping Park

Unit 10C, Cambridge Cl, Aylesbury, HP20 1DG

Fire Evacuation Plan

Ground & First Floor Plans

02.09.19SS/EK 1/200 @ A1 IA-LBF-045 003 - FEP

A

Proposed Ground Floor Plan

Proposed First Floor Plan

NOTE:

· Proposals must comply with all acoustic, fire &

building regulation requirements

· No dimensions are to be scaled from this drawing.

The contractor is responsible for checking all

dimensions on site

Drawings to be read in conjunction with Aylesbury site

notes.

Drawings were not surveyed by Pure Gym but supplied

via landlord and not checked.

Dimensions will require verification on site.

A 15.10.19 Doors added to changing rooms. Rooms defined inline with BOLT. Second

entrance pod provision removed. Lockers moved. Flex area increased. Rasied

areas removed in changing rooms.

EK/PG

AutoCAD SHX Text
UP 12
AutoCAD SHX Text
UP 8
AutoCAD SHX Text
TELECOM
AutoCAD SHX Text
SHUTTER
AutoCAD SHX Text
SHUTTER
AutoCAD SHX Text
UP 12
AutoCAD SHX Text
UP 8
AutoCAD SHX Text
1:40 fall
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
G
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
Handrail
AutoCAD SHX Text
SHUTTER
AutoCAD SHX Text
46
AutoCAD SHX Text
46
AutoCAD SHX Text
FROM LINK ROOF
AutoCAD SHX Text
ELECTRIC
AutoCAD SHX Text
(10C)
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B