140° 107° 138° 125° 146° 123°UP Mirror Kiosk
Transcript of 140° 107° 138° 125° 146° 123°UP Mirror Kiosk
Fire Evacuation Key
Occupany level within area
0
Protected areas: walls, floors, ceilings and doors to achieve 30minute fire resistant
construction.
Protected areas: walls, floors, ceilings and doors to achieve 60 minute fire resistant
construction.
Sprinklers
System design and installed in compliance with BS EN 12845:2015 & LPC Technical Bulletins
Fire Alarm
Fire Alarm designed and installed to BS 5839. Smoke & heat detection / emergency lighting by specialist.
Please refer to M&E engineer's drawings / specifications.
Escape Lighting
Emergency escape lighted designed and installed in accordance with BS 5266: Part 1. Please refer to M&E
Engineer's drawings for final layout and specification.
Smoke Extract
Smoke Extract System to be designed and installed in accordance with BS 7346: Part 8. Please refer to M&E
Engineer's drawings for final layout and specification.
Existing wall to achieve min 60 minute fire rating (suitability of wall to be confirmed on site
by Pure Gym Main Contractor
1050 min
Minimum Clear Widths
Fire Escape Route
30
Exit No.
New wall to achieve min of 60min fire rating
Fire Escape Route - change of direction
Server
Combined Store
Positions of
access points
to unit below
Mirrors Mirrors Mirrors Mirrors Mirrors
Positions of
access points
to unit below
Mirro
rs
DIS
AB
LE
D R
EF
UG
E
DISABLED REFUGE
Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors Mirrors
Mirro
rs
Mirro
rs
Mirro
rs
Mirro
rs
Mirro
rs
Mirro
rs
Redundant
2.2 sqftEquip_Staff_Locker
3.2 sqftEquip_Coat_Rail 2.9 sqftCoat_Rail
2.2 sqftEquip_Staff_Locker
2.2 sqftEquip_Staff_Locker
2.2 sqftEquip_Staff_Locker
K
i
o
s
k
Equip_Night-Lockers24.2 sqft
Entrance
Lobby FF
Co
mm
s
60
0 x 80
0
DDA Pass Door
DDA Ref
door &
Fire Exit
Spare
Store 1
(Ex Office)
Flex
Cardio
Studio
Aerobics
Store Room
Mirro
rs
Mirro
rs
Mirro
rs
Mirrors Mirrors Mirrors
Mirro
rs
Mirro
rs
Mirro
rs
Mirro
rs
Mirro
rs
Raised
Dais
Spin
Studio
Mirrors MirrorsMirrors
Free Weights
Gym Floor
Functional
Belfast
Sink
Vend
ing
Male Change
(Redundant)
Accs
WC/SH
WF
Sunbed
UP
PT Assessment
Area
Mirror
DOWN
DISABLED REFUGE
Plant
Room FF
UP
Break
Room
Locker
Room
Cleaners
Room 1
14 sqftBreakfast_Bar
EQUIP_NAME
COLOUREQUIP_NAMETOTAL_AREA
UP
Female
Change
EQUIP_NAME
CH 1CH 2
COLOUR
EQUIP_NAMETOTAL_AREA
CH
1
CH
2
EQUIP_NAME
UP
Male
change
Cle
an
ers
ro
om
2
TOTAL_AREAEQUIP_NAME
Mirro
rs
UP
3
2
12.7m
17.4m
14.7m
45
25
30
2
4
1
20
20
2
1
2
1
2
5
°
41.1m
Total
14
6
°
14
0
°
1
2
3
°
28.9m
Total
54.0m
Total
13.5m
55.8m
Total
41.7m
Total
53.4m
Total
47.1m
Total
60.7m
Total
45.1m
Total
57.7m
Total
1100mm min
existin
g c
ha
nn
el
25
35
25
10
023
IA-ALL-SD
Fire Exit
Fire
Exit
Fire
Exit
1252
1726
1252
Existing fire door fire resistance
to be confirmed. FD30 required.
Existing fire door fire resistance
to be confirmed. FD30 required.
Existing fire door
fire resistance
to be confirmed.
FD30 required.
Existing fire door fire resistance
to be confirmed. FD60 required.
Existing corridor is considered a protected route
Existing corridor is considered a
protected route as indicated.
Exact build up of construction
and fire resistance to be
confirmed by contractor.
Existing corridor is considered a
protected route as indicated.
Exact build up of construction
and fire resistance to be
confirmed by contractor.
Voids and existing retained
M&E and ducting to be
checked for correct
dampening and fire
stopping.
Voids and existing retained
M&E and ducting to be
checked for correct
dampening and fire
stopping.
Voids and existing retained
M&E and ducting to be
checked for correct
dampening and fire
stopping.
Voids and existing
retained M&E and
ducting to be
checked for correct
dampening and fire
stopping.
Fire escape No.3 only serves existing redundant
male changing room Fire integrity to be confirmed
and void detection to be retained/maintained for
future use.
1
0
7
°
1
3
8
°
32.5m
Total
Air g
ap
Air g
ap
PG
Sc
ob
ie
M
M4
Air g
ap
Lu
co
za
de
Sc
ob
ie
M
M4
Lu
co
za
de
Be
v M
ed
ia
Air g
ap
PG
Sc
ob
ie
M
M4
002
IA-SBF-SD
002
IA-SBF-SD
015
IA-ALL-SD
015
IA-ALL-SD
021
IA-RDS-SD
021
IA-RDS-SD
13.9m
17.0m
Flex
1200
X X
B
C
D
G
K
K
10
24
2627
30
29
31
32
34
37
38
39
43
44
45
42
49
28
X
H
51
X X X XXXXXX
A
X
43
28
25
I
43
43
43
5252
I
I
E
28
23
22
28
41
41
25
41 41 41 41
G
X
12
E E E
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
180
0
120
0120
0120
0120
0120
0120
0120
0120
0120
0
5
6
8
11
12
14
15
16
1721
3
9
7
11
1
18
19
41 41 41 41 41
41 41 41 41 41
41 41 41 41 41
41 41 41 41 41
41 41 41 41 41
20
180
0180
0180
0
50
50
*
*
28
28
28
28
28
23
1200
22
28
1200
22
28
38
X X X XXXXX X
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
2M Run
off
1
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
XX
180
0180
0180
0
1200 1200 120012001200
53
A A A A A A A A A A A A A A A A A A A
B
C C C C
D
I
33
28
4
Safe
Filin
g
Ca
bin
et
DIGI
DIGI
GANTNER
DOOR_INT-Custom
DOOR_INT-Custom
Electrical Room
LIFT
RW
P
SV
P
Electrics
Plant
Room GF
Entrance
Lobby GF
Existing fire door fire resistance
to be confirmed. FD60 required.
Pure Gym Ltd
Town Centre House
The Merrion Centre
Leeds
LS2 8LY
t: 0113 285 8787
w: www.puregym.com
PROJECT TITLE DRAWING TITLE
DATE SCALEDRAWN / CHECKED JOB No DRAWING No
Rev
Rev Date Description Drawn/ Checked
DRAWING PURPOSE
CONSTRUCTION
Aylesbury Shopping Park
Unit 10C, Cambridge Cl, Aylesbury, HP20 1DG
Fire Evacuation Plan
Ground & First Floor Plans
02.09.19SS/EK 1/200 @ A1 IA-LBF-045 003 - FEP
A
Proposed Ground Floor Plan
Proposed First Floor Plan
NOTE:
· Proposals must comply with all acoustic, fire &
building regulation requirements
· No dimensions are to be scaled from this drawing.
The contractor is responsible for checking all
dimensions on site
Drawings to be read in conjunction with Aylesbury site
notes.
Drawings were not surveyed by Pure Gym but supplied
via landlord and not checked.
Dimensions will require verification on site.
A 15.10.19 Doors added to changing rooms. Rooms defined inline with BOLT. Second
entrance pod provision removed. Lockers moved. Flex area increased. Rasied
areas removed in changing rooms.
EK/PG