CORESO

General presentation

François BOULET, CEO

Page 2: 14. françois boulet   coreso

Why a regional coordination?

06/12/2011 - IA Day 2

Market development

Flexibility - Intraday

Large scale renewable

generation

High variability –

geographical concentration

Development of the

european grid and of cross-

border capacities

AC & DC

Growing influence of distant electrical

systems on local flows

More uncertainties

Increased stress for operations

Need for a coordinated management

of flows at international level to

guaranty security of supply

Page 3: 14. françois boulet   coreso

� Independent company (SA) with its own employees

� Created december 2008 in Brussels

� Operational since 16th February 2009

� Round the clock operations since 29th June 2009

� 5 shareholders today (Elia, National Grid, RTE, Terna, 50HzT.)

and open to new partners

Coreso: a centralized vision of the coordination

between TSOs

06/12/2011 - IA Day 3

Page 4: 14. françois boulet   coreso

� 19 Security and Coordination Engineers� Coming from parent TSOs’ staff

� Will go back to the TSOs after their job in Coreso

� Training received within the shareholders + internal training inCoreso (minimum 4 months of initial training)

� Regular exchanges with TSOs’ operators

� Shift organisation (24/7)� Morning: 1 SCE

� Afternoon: 3 SCE

� Night: 2 SCE

� COO: Olivier Bronckart

� CEO: François Boulet

� All administrative tasks are contracted with Elia

Employees of Coreso

06/12/2011 - IA Day 4

Page 5: 14. françois boulet   coreso

Coreso: a service provider to TSOs

06/12/2011 - IA Day 5

Page 6: 14. françois boulet   coreso

� Interest Area : the grid of its participating TSOs impacted by cross-border flows

� Preventive security analysis on a larger area including neighbouring grids

� Observability of the full Continental Europe grid, thanks to the data exchanged between TSOs

Coreso’s area of activities

06/12/2011 - IA Day 6

Page 7: 14. françois boulet   coreso

� Each TSO delivers a base case including their best estimate

for the next day for their network, about the:� Topology

� Load

� Generation pattern

� Wind generation

� Outage program

� Exchange programs

… for several timestamps (up to 24)

� Every 15min some TSOs produce a snapshots for close to

realtime analysis

Data used: DACF files / snapshots

06/12/2011 - IA Day 7

BE

FR

NL

These data are merged by Coreso to build a

consistent continental merged file, used to

perform security assessment.

Page 8: 14. françois boulet   coreso

Tools of Coreso operators

06/12/2011 - IA Day 8

Page 9: 14. françois boulet   coreso

� Perfect knowledge of

operation rules but only

on its own territory

� Study for peak time

� Influence of consumption or

generation patterns

� 1 to 3 in-depth analyses

� Full description of national

grid but only limited vision

of neighbouring grids

� Knowledge of operation rules of several TSOs and ability to speak to each using its own technical culture

� 24 hours vision

� Influence of exchanges

� 6 to 12 in-depth analyses

� Full continental grid description but simplified and limited to EHV

06/12/2011 - IA Day

TSOs TSOs Coreso Coreso

9

Complementary operational visions

Page 10: 14. françois boulet   coreso

N-1 Avelin – Lonny

=> 130% Avelgem-Mercator

N-1 Mastaing-Avelgem

=> 90% 1’ Avelin-Lonny

=> NOT ACCEPTABLE

Need of cross -border

preventive actions:

2 nodes topology in Lonny in

order to balance Avelin-Lonny

and Lonny-Vesle flows

Special topology in Zandvliet in

order to isolate BE-NL tie-lines

on 400kV transformer

Change tap position of Van Eyck

transfomer (from 18 to 16) in

order to reduce N-S flows

Stressed situation foreseen in day-ahead

06/12/2011 - IA Day 10

Page 11: 14. françois boulet   coreso

� Increased coordination of the following means to control the

power flows:

� Topology actions

� HVDC links

� Phase Shifter Transformers

� Develop intraday processes and tools

� New service to support TSOs in case of potential large

disturbance

� Improve tools and services to better integrate Renewable

Energy Sources

� Participate in relevant research programs (Twenties, iTesla)

Next steps

06/12/2011 - IA Day 11

Page 12: 14. françois boulet   coreso

?See our Web site: www.coreso.eu