13. SAFETY AND HEALTH PROGRAM

Transcript of 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE...

Page 1: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

13. SAF

ET

Y A

ND

HE

ALT

H

PR

OG

RA

M

Page 2: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

13. Safety and Health ProgramThe first and most basic safety principle at Sellen is that all injuries are preventable. We believe that management and our employees share in the responsibility and accountability for preventing injuries. One of management’s fundamental responsibilities is to lead the safety effort by establishing safety goals, demanding accountability, and providing the resources to make the safety program work.

CONFIDENTIAL RECORD

Page 3: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

13 | SAFETY & HEALTH PROGRAM

166 Sellen & ZGF Design-Build Team CONFIDENTIAL RECORD

Sellen’s Safety ApproachSafety is a core value at Sellen. We’ve worked hard to establish a culture of safety excellence among our employees and subcontractors. Sellen has a detailed Accident Prevention Program with the goal of creating a safe and healthy work environment that promotes safe productivity and is proactive in anticipating and avoiding risk. This safety program is updated continuously with lessons learned from the field and is the basis for our site-specific plans.

Development of our project-specific safety plan begins in preconstruction during our pull planning scheduling sessions. These sessions include every participant involved with specific construction activities, allowing us to integrate safety into the scheduling and sequencing of every activity. It

Company Standard Safety and Health ProgramPer Addendum 6, dated Jan. 22, 2014, we have included a complete copy of Sellen’s company standard Safety and Health Program on a separate CD with our proposal submittal. We use our standard safety program as a starting point to create a site-specific safety plan, which we will begin for the 1063 Block Replacement following our selection. The site-specific safety program will address all applicable federal, state and local safety and health requirements.

Section AttachmentsBeginning on page 171, we have also included the Table of Contents for Sellen’s Safety and Health Program, to give you an idea of what our company policy entails.

also provides the superintendent and foremen with an opportunity to promote our culture of safety excellence among the craftspeople doing the work. We will involve representatives from the DES and user groups, if appropriate, in our safety planning so we understand how to provide you with maximum safety and efficiency.

Safety PartnershipsSellen has a partnership with labor and industries through quarterly, voluntary Department of Safety and Health (DOSH) inspections. These consultation inspections evaluate our safety efforts and help improve our program. This also promotes increased awareness of the importance of safety to our jobsite teams.

Managing Subcontractor SafetySellen’s volume of work provides us with extensive knowledge of individual subcontractor safety programs and performance, but we do not rely on this information alone. Safety language is included in subcontracts and with our invitation to bid; subcontractors must meet project-specific requirements for safety as part of the prequalification and bidding process. Before mobilizing on site, each subcontractor meets with the Sellen team to discuss the site-specific safety plan. Subcontractors must also submit a site-specific safety plan and copies of material safety data sheets for products used on the project.

At Sellen we believe that protecting our employees is essential to facilitating a successful company. Safety excellence is achieved only through the combined effort of the entire organization.

Page 4: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

SAFETY & HEALTH PROGRAM | 13

CONFIDENTIAL RECORD Sellen & ZGF Design-Build Team 167

Safety TrendingWe monitor trending information on nearly all of our safety reporting, including near misses, safety inspections, DOSH inspections, corporate safety reviews and subcontractor safety performance. By monitoring the trends in our safety performance, we are able to discern areas that have excelled or may need improvement. Sellen’s Safety Action Committee develop initiatives that respond to our trending information.

Drug and Alcohol TestingSellen prohibits alcoholic beverages, intoxicants, narcotics, and drug paraphernalia on our jobsites. Drug testing is mandatory. Anyone who reports for work under the influence of any drug that could adversely affect their work ability or the safety of others will be dismissed.

Additionally, we regularly record our subcontractors’ safety performance and monitor the information for trends. By identifying certain trends by subcontractor or scope of work, we are able proactively mitigate any areas that may be a concern or learn from our subcontractors in areas they have excelled.

Safety Program EnforcementSuperintendent Lauren Barnwell will conduct weekly inspections with the Sellen safety director. Any unsafe acts or conditions will be noted and corrected immediately. Every employee is responsible for the implementation of safety procedures and empowered to stop any construction activity immediately if it’s a potential safety hazard. Our jobsite motto is, “If you see something, say something.”

Daily Huddle / Task Planner The superintendent meets daily with the foremen for each trade to review safety items specific to that day, especially upcoming activities that require special safety coordination among trades.

“Tool Box” MeetingsAt this weekly meeting, we cover general and task-specific safety procedures, an overview of that week’s activities, any recent accidents or issues, and coordination items. All subcontractors are required to hold their own weekly meetings or participate in ours.

Pre-Task PlanningBefore each construction activity, subcontractors and Sellen crews develop a pre-task planner for that activity, effectively ensuring that every activity has a specific safety plan in place. Items noted in the pre-task planner include potential hazards, precautions, proper tool use methods and personal protective equipment.

Our program also includes:•Drug-free workplace/drug and

alcohol testing•Emergency response plan•Regular inspections•Protective equipment•Reporting unsafe conditions/

discipline•Accident investigation

procedures•Confined space entry program•Electrical protection program•Fall protection program•Fire prevention and safety•Lock-out/tag-out program•Respiratory protection program

Key Safety Elements:

Federal Center South, Sellen | ZGF Design-Build Team (Pursuing LEED Gold)

Page 5: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

13 | SAFETY & HEALTH PROGRAM

168 Sellen & ZGF Design-Build Team CONFIDENTIAL RECORD

1063 Preliminary Site Logistics PlanEarly in the design phase, Sellen will meet with the DES, the City of Olympia and the other team members to begin developing a comprehensive site logistics plan that ensures pedestrian safety and allows the team to mitigate impacts to the ongoing activities surrounding the Capitol Campus. Sr. Superintendent Lauren Barnwell has already begun developing a preliminary site logistics plan, which we have attached on the following page.

Factors that are considered in developing our detailed on-site logistics plan include off-site parking for construction workers, flexible locations for material and office staging, site ingress and egress routes, fencing and directional signage, traffic flaggers, regular informational meetings for the public, faculty and staff.

1063 Proposed Trucking RoutesWe have also included our proposed trucking routes for the 1063 Block Replacement. The proposed trucking route, shown to the right, takes the trucks clockwise around the building and allows uploading and deliveries to occur on Union Street. This approach avoids disruption to the high-trafficked Capitol Way.

Page 6: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

SAFETY & HEALTH PROGRAM | 13

CONFIDENTIAL RECORD Sellen & ZGF Design-Build Team 169

T

P

P

W

P

P

P

P

P

P

T

P

PP

T

P

P

CO

CO

P

200

201

204

205

209

97.01

96.99

79.00

79.30

94.10

94.35

76

74

76

78

78

78

80

82

82

84

86

86

84

82

80

80

78

78

80

82

84

82

80

78

84

86

86

88

88

90

92

9294

94

94

94

96

92

92

90

90

88

88

10'

10'

X-WALK

STOPBAR

X-WALK

X-WALK

X-WALK

S TOP

BA R

STOPBAR

STOP

BAR

X-WALK

X-WALK

STOP BAR

X-WALK

X-WALK

X-WALK

X-WALK

STOP

BAR

STOPBAR

STOP

BAR

STOPBAR

STOPBAR

STOP

BAR

X-WALK

X-WALK

P

LIEBHERR 154EC-H 6180' HOOK RADIUS121' HEIGHT UNDER HOOK

CREW SHACKS& STAGING AREA

SITE ENTRANCE

UNION AVENUE

CAP

ITO

L W

AY

11TH AVENUE

CO

LUM

BIA

STR

EET

ALLEY

CONTRACTORPARKING

COORDINATED WITHOWNER

N

PROTECT EXISTINGTREE TO BE SAVED

TOWER CRANE SWING WILLNOT INTERFERE WITHEXISTING HERITAGE TREES

GC OFFICES

CO

VER

ED W

ALKW

AY

ALIMAK SINGLECAR MANLIFT

LANE CLOSURE DURING THE DAY

COBBLE ENTRY RAMP

FUTURE BUILDING FOOTPRINT

STAGING AND LAYDOWN

CONSTRUCTION FENCING

DEWATERING TANKS

KEY

PARKING

TRUCK ROUTING

PEDESTRIAN PATHWAY

CLOSED SIDEWALK

COVERED WALKWAY

925 Fourth AvenueSuite 2400Seattle, WA 90104T 206 623 9414F 206 623 7828www.zgf.com

227 Westlake Avenue NorthSeattle, WA 98109

Drawing No.

Date:

Job No:

Checked By:

Drawn By:

Drawing Title

Revisions

Consultants

MECHANICAL ENGINEER & PLUMBING

WSP Group600 University St., Suite 500Seattle, Wa 98101T 206-342-9900

ELECTRICAL ENGINEER

Gerber Engineering307 3rd Ave South, Suite 510Seattle, Wa 98104T 206-405-3510

STRUCTURAL & CIVIL

kpff1601 5th Ave, Suite 1600Seattle, Wa 98101T 206-622-5822

LANDSCAPE ARCHITECT

Site Workshop222 Etruria St., Suite 200Seattle, Wa 98109T 206-285-3026

2/16

/201

4 11

:12:

26 P

M

02.10.2014

22070.mrk

SEL-0.01

1063 BLOCKREPLACEMENT

K. Brewer

G. Condit

Site Logistics Plan

1063 BlockWashington State Capital CampusOlympia, Washington

Project Status

1/16" = 1'-0"1 Site

Preliminary Site Logistics Plan Proposed Trucking Route

N

Page 7: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

SAFETY & HEALTH PROGRAM | 13

CONFIDENTIAL RECORD Sellen & ZGF Design-Build Team 171

ACCIDENT PREVENTION PROGRAM

TABLE OF CONTENTS COMPANY SAFETY POLICY ......................................................................................... 1 PURPOSE OF THE ACCIDENT PREVENTION PROGRAM .......................................... 2 PERSONAL PROTECTIVE EQUIPMENT ....................................................................... 4 ACCIDENT REPORTING PROCEDURES ...................................................................... 9 TIME LOSS AND LIGHT DUTY..................................................................................... 10 ACCIDENT REPORTING CHECKLIST ......................................................................... 11 INCIDENT REPORTING FORM .................................................................................... 12 ACCIDENT INVESTIGATION ....................................................................................... 16 DISCIPLINE FOR NON-COMPLIANCE ........................................................................ 17 FIRST-AID FACILITIES ................................................................................................. 18 JOBSITE POSTING REQUIREMENTS ......................................................................... 19 JOBSITE SAFETY SIGNAGE ....................................................................................... 20 SAFETY TRAINING PROGRAM ................................................................................... 23 SITE SPECIFIC ORIENTATION TALKING POINTS ..................................................... 25 STRETCH AND FLEX ................................................................................................... 30 RECORD-KEEPING REQUIREMENTS ........................................................................ 32 JOBSITE PAPERWORK REQUIREMENTS .................................................................. 33 REPORTING UNSAFE CONDITIONS & PRACTICES .................................................. 35 SAFETY & HEALTH COMMITTEE ................................................................................ 36 SELLEN DAILY PLANNER ........................................................................................... 37 DAILY PLANNER ......................................................................................................... 38 SAFETY INSPECTION PROCEDURES ........................................................................ 39 SAFETY INSPECTION CHECKLIST ............................................................................. 40 HAZARD OBSERVATION LOG .................................................................................... 43 DANGER / CAUTION TAPE & TEMPORARY BARRICADES POLICY ......................... 45 GUARDRAIL REMOVAL PERMIT ................................................................................. 48 SUBCONTRACTOR PRE-CONSTRUCTION MEETING ............................................... 50 WEEKLY SAFETY MEETINGS ..................................................................................... 51 WEEKLY MEETING FORM ........................................................................................... 52 PROCEDURE FOR JOBSITE VISITORS ...................................................................... 53 RELEASE, HOLD HARMLESS, AND INDEMNITY ....................................................... 54 2012 SAFETY RECOGNITION PROGRAM FOR FIELD PERSONNEL ........................ 55 ELECTRICAL PROTECTION PROGRAM ..................................................................... 57 HAZARD COMMUNICATION PROGRAM .................................................................... 59 HEARING CONSERVATION PROGRAM ..................................................................... 61 HEAT STRESS ............................................................................................................. 63 CONFINED SPACE ENTRY PROGRAM ...................................................................... 66 CONFINED SPACE ENTRY PERMIT ........................................................................... 69 FALL PROTECTION PROGRAM .................................................................................. 70

Page 8: 13.des.wa.gov/sites/default/files/public/documents/About/...TOWER CRANE POLICY ..... 138 CRANE ERECTION/DISMANTLE CHECKLIST ..... 139 CRANE JUMP MOBILE CRANE POLICY ..... 143 AERIAL

13 | SAFETY & HEALTH PROGRAM

172 Sellen & ZGF Design-Build Team CONFIDENTIAL RECORD

FALL PROTECTION WORK PLAN ............................................................................... 75 FALL PROTECTION WORK PLAN ............................................................................... 76 TRAINING FORM SIGN-IN ........................................................................................... 76 BODY HARNESS INSPECTION CHECKLIST .............................................................. 77 LANYARD CHECKLIST ................................................................................................ 79 ROPE-GRABS/SAFETY LINES CHECKLIST................................................................ 81 SELF-RETRACTING LIFELINE DEVICES CHECKLIST ............................................... 83 FIRE PREVENTION & FIRE SAFETY PROGRAM........................................................ 85 HOT WORK PROCESS ................................................................................................ 88 LOCK-OUT / TAG-OUT POLICY ................................................................................... 89 LOCK-OUT / TAG-OUT CHECKLIST ............................................................................ 91 RESPIRATORY PROTECTION PROGRAM ................................................................. 92 RESPIRATOR USE PLAN ............................................................................................ 96 RESPIRATOR FIT TEST CHECKLIST .......................................................................... 97 BLOODBORNE PATHOGENS EXPOSURE CONTROL PLAN ..................................... 98 HEPATITIS B VACCINATION DECLINATION ............................................................ 101 ENVIRONMENTAL POLICY STATEMENT ................................................................. 102 ENVIRONMENTAL CHECKLIST................................................................................. 103 ENVIRONMENTAL SPILL REPORT ........................................................................... 104 FUEL STORAGE ........................................................................................................ 106 ASBESTOS PROGRAM ............................................................................................. 107 LEAD PROGRAM ....................................................................................................... 109 SILICA PROGRAM ..................................................................................................... 111 HEXAVALENT CHROMIUM PROGRAM .................................................................... 113 CONTAMINATED SOIL PROTOCOL .......................................................................... 115 CRANE POLICY ......................................................................................................... 117 SUPERVISOR SITE CHECK LIST (ASME B30.5-2007) ............................................. 125 CRITICAL LIFT PLAN WORKSHEET ......................................................................... 127 SUSPENDED WORK PLATFORM POLICY ................................................................ 130 SUSPENDED WORK PLATFORM PLAN ................................................................... 136 TOWER CRANE POLICY ........................................................................................... 138 CRANE ERECTION/DISMANTLE CHECKLIST .......................................................... 139 CRANE JUMP CHECKLIST ........................................................................................ 141 MOBILE CRANE POLICY ........................................................................................... 143 RIGGING POLICY ...................................................................................................... 144 AERIAL LIFT POLICY ................................................................................................. 146 AERIAL LIFT TRAINING GUIDELINES ....................................................................... 150 AERIAL LIFT EMPLOYEE TRAINING COMPLETION CHECKLIST ............................ 153 FORKLIFT POLICY ..................................................................................................... 154 FORKLIFT TRAINING ................................................................................................. 156 SECURED AND COVERED LOAD IN VEHICLES POLICY ........................................ 157