Page 2: 132kv substation inplant training seminar

CONTENTS Single line diagram Lighting arresters Coupling capacitor Wave trap Current transformer Potential transformer Circuit breaker transformerControl roomBattery roomEarthing importance Miscellaneous

Page 3: 132kv substation inplant training seminar

Single Line Diagram-132/33/11kv Sub-station PGI

Page 4: 132kv substation inplant training seminar

132kv incoming lines through Lightning Arrestor & is 132kv incoming lines through Lightning Arrestor & is connected to the Gantry through insulated discs.connected to the Gantry through insulated discs.

Disc insulators

Lightning Arrestor

Incomer gantryLightning

Arrestors

Bus bar for all 3 incomer & 1 outgoing line

Page 5: 132kv substation inplant training seminar

It is connected between the line and earth so diverts the incoming high voltage wave to earth.

Lightning arresters act as safety valves designed to discharge electric surges resulting from lightning strokes, switching or other disturbance .

LIGHTNING ARRESTERS

Page 6: 132kv substation inplant training seminar

The communication device used for the communication over the power lines is a MODEM, commonly known as Power Line MODEM (PLM).

It works as both transmitter and receiver, i.e., it transmits and receives data over the power lines

Page 7: 132kv substation inplant training seminar

Coupling CapacitorThe modulated carrier is let into power line through coupling capacitor specially designed to with stand line voltage under all-weather condition. The upper end of the coupling capacitor is connected directly to the line and the lower end is connected to the ground through a carrier frequency chock coil or drain coil. Thus coupling capacitor forms the link between the PLCC equipment and power line. The coupling capacitor used in UPSEB is 2200pf capacitance

Page 8: 132kv substation inplant training seminar

Wave Trap or Line TrapWave trap is connected in series with power line between the point of connection of coupling capacitor and S/S. Wave trap offers negligible impedance to HF carrier. Wave trap stands electromechanically and thermally for short circuit current in the event of fault on the line. On the basis of blocking frequency bank, the wave trap can be following type:All waveSingle FrequencyDouble Frequency’Broad Band

Page 9: 132kv substation inplant training seminar

CURRENT TRANSFORMERA current transformer (CT) is used for measurement of alternating electric currents. When current in a circuit is too high to apply directly to measuring instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments. A current transformer isolates the measuring instruments from what may be very high voltage in the monitored circuit.

Page 10: 132kv substation inplant training seminar

The line ,through the isolators is distributed The line ,through the isolators is distributed in the s/s through Main bus.in the s/s through Main bus.

Main Bus bar

132kv Bay

Page 11: 132kv substation inplant training seminar

POTENTIAL OR VOLTAGE TRANSFORMERVoltage transformers (VT) (also called potential transformers (PT)) are a parallel connected type of instrument transformer, used for metering and protection in high-voltage circuits or phasor phase shift isolation. They are designed to present negligible load to the supply being measured and to have an accurate voltage ratio to enable accurate metering. A potential transformer may have several secondary windings on the same core as a primary winding, for use in different metering or protection circuits

Page 12: 132kv substation inplant training seminar

CIRCUIT BREAKER CIRCUIT BREAKER

Page 13: 132kv substation inplant training seminar

TransformerTransformer

Page 14: 132kv substation inplant training seminar
Page 15: 132kv substation inplant training seminar
Page 16: 132kv substation inplant training seminar

Control roomControl roomThe control room is nerve center of a power station .

The various controls performed from here are voltage adjustment, load control, emergency tripping of turbines etc.

Page 17: 132kv substation inplant training seminar

Control roomControl room

Page 18: 132kv substation inplant training seminar

EarthingEarthing

Page 19: 132kv substation inplant training seminar

MISCELLANEOUSMISCELLANEOUS

Page 20: 132kv substation inplant training seminar

NCT (Neutralising Current Transformer)

RVT (Resistive Voltage Transformer)

Capacitor Cells