13 Oct 2010 29 th ALICE RRB J. Schukraft 29 th ALICE RRB Collaboration News Detector Status Physics...
-
Upload
opal-chase -
Category
Documents
-
view
215 -
download
0
Transcript of 13 Oct 2010 29 th ALICE RRB J. Schukraft 29 th ALICE RRB Collaboration News Detector Status Physics...
13 Oct 2010 29th ALICE RRB J. Schukraft
2929thth ALICE RRB ALICE RRB2929thth ALICE RRB ALICE RRB
Collaboration News
Detector Status
Physics Results
CERN-RRB-2010-073
13/10/2010 29th RRB J. Schukraft2
Collaboration News Collaboration News New Institutes
Comsats (Pakistan) : ‘associate members status’, Physics, Computing
Applying (decision in November) Gahauti Univ (Assam) & Bose Institute (Kolkata) Physics, Upgrades KISTI (Korea) : ‘associate members status’ Computing
Ongoing Discussions Pinstech (Pakistan) : ‘associate members status’, Physics, Computing
small computing cluster now up & running
Egypt (initially via JINR), Lebanon (small group, associated via other ALICE institutes),
13/10/2010 29th RRB J. Schukraft3
Collaboration NewsCollaboration News Appointments (tbc by CB in November)
Run Coordinator 2011: P. Martinengo (CERN)
Editorial Board Chair: H. Oeschler (TU Darmstadt)
Conference Committee Chair: E. Vercellin (Torino)
Elections: Spokesperson & CB-chair Spokesperson: P. Giubellino (Torino), starting 1.1.2011 for 3 year term
CB chair : P. Braun-Munzinger (GSI), starting 1.1.2011 for 3 year term 2 deputies each for SP and CB chair to be nominated in November
13/10/2010 29th RRB J. Schukraft4
Funding..Funding.. UK funding : no news
STFC review end 2009: ALICE support guaranteed only until the end of the current grant (mid 2011) new grant application being prepared, prospects uncertain…
CIEMAT (Spain) new director of CIEMAT intended to withdraw from ALICE in 2010 now: reduced but continued participation in 2011
continue ongoing involvement in physics (several PhD students) & computing USC (Santiago de Compostela) seeks independent funding starting 2012
13/10/2010 29th RRB J. Schukraft5
‘‘Upgrades’Upgrades’ EMCAL extension (‘DCAL’) (~ 40% of emcal)
approved in August 2010 US DOE, Japan, China, France construction to be completed for installation in 2012
ALICE Upgrade planning several options are under study
improved vertex dets, forward calo, PID, .. adjusting to new LHC shutdown schedule
concrete plans require first HI data upgrades to be presented & discussed in 2011
13/10/2010 29th RRB J. Schukraft6
ALICE StatusComplete: ITS, TPC, TOF, HMPID,FMD, T0, V0, ZDC, Muon arm, Acorde PMD , PHOS(3/5), DAQ
Partial installation: 7/18 TRD 4/10 EMCAL
~ 60% HLT for pp
100% HLT for Pb-Pb(+1200 CPU cores installed)
ALICE Detector Configuration 2010
All systems
up & running & taking data
13/10/2010 29th RRB J. Schukraft7
ALICE Status
0
1
2345
6
7
9
8
1112 13 14
15
17
0
12
3
4
1610
2x2x
2x
2x
2x
Installation WS Installation WS 2010/112010/11
9 week WS : very busy schedule ! install 6 EMCAL & 3 TRD modules
continuous 2 shift operation contingency: reduced scope
very sign. physics gain ! x 2 for TRD J/ jets in emcal
10/18 TRD 10/10 EMCAL
13/10/2010 29th RRB J. Schukraft8
Commissioning/CalibrationCommissioning/Calibration PHOS/EMCAL
no test beam calibration => pp data final calibration needs full 2010 stat.
TRD commissioning electron ID
pion rejection ok, e-efficiency to be improved
Muon tracking alignment constantly improving
Before After
PHOSE/E ~ 7%
track residualsbending plane
TPC dE/dx
pions
electrons
13/10/2010 29th RRB J. Schukraft9
TPC CalibrationTPC Calibration gain & drift velocity calibration very good
now working on local, static field distortions (mechanical tolerances/deformations) track distortions reduced by factor 4-5 (< 500 m close to Field Cage) required to go to higher momenta
Track DistortionsBefore Corrections
After Corrections
13/10/2010 29th RRB J. Schukraft10
Material BudgetMaterial Budget Improving Detector Simulation
central part (< 450): very precisely measured (< 5%) forward part: improved description in simulation (using design drawings/installation photo’s)
Material in simulation
SSD
SDD
SPD
FMD multiplicityNot fully corrected
13/10/2010 29th RRB J. Schukraft11
Operational IssuesOperational Issues SPD cooling
issue since start-up, 10-20 % of modules insufficient cooling; clogged filters ? lab test set-up to study problem and solutions now operational filters can be accessed only in 2012 long shutdown
TPC chamber HV trips increasing trips of IROCs with increasing beam luminosity (reaching 1/few hours)
mostly not correlated with machine background; charging up of insulating parts ? remedy: increased H2O (200 ppm), adding RC filters to power supply
operating now since several days without new trips; tbc
HMPID radiator leak small leak in radiator vessel found in June flow switched of => reduction of active area by 5% potential causes under study
Pedestal stability Muon chambers/PMD slow drift of (small) parts of the electronics baseline no impact on physics, but increase of event size => frequent calibrations runs remedies under study for shutdown
13/10/2010 29th RRB J. Schukraft12
Physics & Data Physics & Data TakingTakingPhysics with pp
collect ‘comparison data’ for heavy ion program many signals measured ‘relative’ to pprequires ~ 109 MinBias events+few 10 pb-1 rare
focus on MB; reduced L, displaced beamsnow and 2011: increased L for rare processes
comprehensive study of MB@LHCtuning of Monte Carlo (background to BSM)
soft & semi-hard QCDvery complementary to other LHC exptsaddress specific issues of QCD
Heavy Ion run starting November since August (ICHEP) shift effort ‘back’ to HI preparation initial run at low Luminosity ( L < 1/20 design)
event rate ~ 10 – 100 Hz expect ~ 107 MinBias events (1-3 b-1)
13/10/2010 29th RRB J. Schukraft13
Some Performance Some Performance PlotsPlots
J/ → e+e- |y| < 0.9
J/ → , y = 2.5 - 4
→ (PHOS + TPC)
→
- hard to measure J/ with our current low L (also 1st year Pb Lumi will be very low -> priority on MB in pp)
- ‘proof of detector performance’ higher L later this year and next
13/10/2010 29th RRB J. Schukraft14
Charm at 7 TeV Charm at 7 TeV (ICHEP)(ICHEP)
D0→ D0→
D+→
D*→ D Ds
+→ Φπ+→
Impact Parameter Resolution vs pT
80 m @ 1 GeV
13/10/2010 29th RRB J. Schukraft15
(Anti) Nuclei(Anti) Nuclei
Distance of track to collision vertex
TPC dE/dx
7 TeV pp ≈5-6%
13/10/2010 29th RRB J. Schukraft16
Data Taking Data Taking SummarySummary
>750 Million interactions
> 50 MMuon triggers
Integrated data taking efficiency ~ 80%since Sept increasing to > 90%
> 20 Mhigh Multiplicity
Operation:shift crew reduced from > 30 to 6 people
+ ~ 30 ‘on call’ experts (24h 7/7)
13/10/2010 29th RRB J. Schukraft17
17
Offline ProcessingOffline Processing
Raw Data Registration
• Reconstruction quasi on line @ T0• Further passes after calibration (T0/1)• Grid Analysis average of 1150 concurrent jobs ~ 250 regular users
Raw Data Processing1.3K runs 321K files 756 TB
Resource Usage
• 1st half of 2010: excess resources• now exhausting allocated CPU
• 45% (15%) of allocated disk in T1(T0)• HI data still to come..
reconstruction: 6% analysis: 13% MC: 81%
13/10/2010 29th RRB J. Schukraft18
ResultResultss
Final Results Nch multiplicity & distributions
900 GeV: EPJC: Vol. 65 (2010) 111900 GeV, 2.36 TeV: EPJC: Vol. 68 (2010) 897 TeV: EPJC: Vol. 68 (2010) 345
pbar/p ratio (900 GeV & 7 TeV) PRL: Vol. 105 (2010) 072002
Momentum distributions(900 GeV) PLB: Vol. 693 (2010) 53
Bose-Einstein correlations (900 GeV) PRD: Vol. 82 (2010) 052001
Ongoing analyses 7 TeV event properties: spectra, HBT, identified particles, strangeness, high multiplicity
Heavy flavour: charm (D0,D+, D*), heavy quarks (c,b) e-
J/e+e-
pQCD: Event topology, 2-particle correlations, jet fragmentation, …
Under Collaboration Review Identified particles (,K,p)
Strangeness (K0,,,,
Global eventproperties
Comparison Data
clarifies QCD issue
13/10/2010 29th RRB J. Schukraft19
Kaon pT distributions
stable & decays
K →
K0S →
Identified ParticlesIdentified Particles
Identified Particle pT
K p
ITS dE/dx
TPC dE/dx TOF
13/10/2010 29th RRB J. Schukraft20
Stable: Stable: , K, p at 900 , K, p at 900 GeVGeV
Prel. Results:
- very large K/ ratio at high pT
- not reproduced by event generators
13/10/2010 29th RRB J. Schukraft21
Decays: KDecays: K00SS at 900 at 900 GeV GeV **
Prel. Results:
- MC well below Data
- more so at high pT
- more so for- ~ ok (at least some MC)
K0S → → p
→ K K→
* 2009 Data (~300 k events)
13/10/2010 29th RRB J. Schukraft22
/K0S Ratio in Au+Au at RHIC
KK00SSRatio 900 Ratio 900
GeVGeV
- very good agreement between STAR (200 GeV) and ALICE (900 GeV)
- very different from CDF (630/1800) and UA1 (630) for pT > 1.5 GeV
- UA1(630) and CDF(630) don’t agree either …to be further investigated (different triggers, acceptance, feed-down correction ?)
large Baryon/Meson ratio:
parton coalescence from QGP ?
|| < 1
|y| < 0.75
13/10/2010 29th RRB J. Schukraft23
J/J/and and CharmCharm
Prel. Results:
- agreement between LHC experiments very good
- energy/pT dependence of cross sections in line with pQCD
J/ →
13/10/2010 29th RRB J. Schukraft24
pQCD: High ppQCD: High pTT Particle Correlations Particle Correlations
Δ
Trigger
AssociatedpTt
Trigger Particle
‘away’ side
‘near’ side
UE
Trigger Particle: highest pT particle in event (pTt)
Associate Particle: all the others (pTa)
25
(w.r.t. Leading Particle) (w.r.t. Leading Particle)
Uncorrected Data
Underlying Event StudiesUnderlying Event Studies
900 GeV 7 TeV
ALICE Work in Progress
Prel. Results:
- data more “spherical” (less 2-jet like) than MC
- more activity between jets (“underlying event”)
13/10/2010 29th RRB J. Schukraft26
More on ‘Event Shapes’More on ‘Event Shapes’ Particle Correlations in 2D
CMS result: unexpected ‘ridge’ in high Mult. ppsomewhat similar phenomenon seen at RHIC in HI collisions
ALICE acceptance smaller: < 2Atlas/ALICE/CMS WG established
to compare results
13/10/2010 29th RRB J. Schukraft27
Heavy Ion Heavy Ion PreparationsPreparations Trigger studies potentially large physics background (QED pair production)
SPD Trigger TOF Trigger
DAQ & data transfer Event size HI >> pp => much larger bandwidth required
specs 1.5 GB/s, reached > 2.5 GB/s 2010: can take full event rate
Physics & software Heavy Ion task force
Detector DAQ> 4 GB/s
DAQ T0 disk> 2.5 GB/s
ICHEP, Paris, July 2010 J. Schukraft28 PLC 20J. Schukraft28Hic sunt Leones !
SummarSummaryy
ALICE is in good shape most detectors perform already at or close to specifications
Concerns: SPD cooling (2012), TPC chamber stability (looks better now) physics is in full production
heavy ions are our ‘core business’, starting in November this year meanwhile study QCD with pp collisions while ‘rediscovering’ the SM, we can clean up some bits here and there…
(p/p, HBT R vs <kT>, /K0, …)
Looking forward to explore the ‘terra incognita’ with HI at LHC
29
We have received very strong supportfrom the FA’s
(and so we did proceed, somewhat slower than originally foreseen)