13
Just-In-Time Production
• Management philosophy• Pull system though the plant
WHAT IT IS
• Employee participation• Industrial engineering/basics• Continuing improvement• Total quality control• Small lot sizes
WHAT IT REQUIRES
• Attacks waste• Exposes problems and bottlenecks• Achieves streamlined production
WHAT IT DOES
• Stable environment
WHAT IT ASSUMES
![Page 2: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/2.jpg)
11
Minimizing Waste: JIT Production
Produce...
...what is needed...
...when it’s needed...
...NOTHING MORE!
![Page 3: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/3.jpg)
6
Waste--Operations
(1) Waste from overproduction
(2) Waste of waiting time
(3) Transportation waste
(4) Inventory waste
(5) Processing waste
(6) Waste of motion
(7) Waste from product defects
![Page 4: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/4.jpg)
15
Minimizing Waste: Kanban Production Control Systems
A
B
Machine Center Assembly Line
Storage
ProductionKanban
WithdrawalKanban
![Page 5: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/5.jpg)
27
JIT Requirements: Work with Vendors
Reduce lead times
Frequent deliveries
Project usage requirements
Quality expectations
![Page 6: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/6.jpg)
28
JIT Requirements: Reduce Inventory More
Stores
Transit
Carousels
Conveyors
![Page 7: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/7.jpg)
29
JIT Requirements: Improve Product Design
Standard product configuration
Standardize and reduce number of parts
Process design with product design
Quality expectations
![Page 8: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/8.jpg)
9
Partnership Relationship
Continuing relationship involving
– a commitment over an extended time period,
– an exchange of information, and
– an acknowledgement of the risks & rewards of the relationship.
![Page 9: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/9.jpg)
11
JIT Purchasing--Requirements
Reduced lot sizes
Frequent and reliable delivery schedules
Reduced and highly reliable lead times
Consistently high quality levels for purchased materials
![Page 10: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/10.jpg)
12
JIT Purchasing--Suppliers
Fewer, nearby suppliers
Repeat business
Support suppliers’ competitiveness
Clusters of remote suppliers
Limit competitive bidding to new parts
Resist vertical integration
Encourage suppliers to implement JIT purchasing
![Page 11: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/11.jpg)
13
JIT Purchasing--Quantities
Steady output rate (a desirable prerequisite)
Frequent deliveries in small lot quantities
Long-term contract agreements with minimal release paperwork
Deliver quantities variable from release to release but fixed for whole contract term
![Page 12: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/12.jpg)
14
JIT Purchasing--Quantities (Ctd)
Little or no permissible overage or underage of receipts
Suppliers encouraged to package in exact quantities
Suppliers encouraged to reduce their production lot sizes (or store unreleased material)
![Page 13: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/13.jpg)
15
JIT Purchasing--Quality
Minimal product specifications imposed on supplier
Help suppliers to meet quality requirements
Close relationships between buyers' and suppliers' quality assurance people
Suppliers encouraged to use process control charts instead of lot sampling inspection
![Page 14: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/14.jpg)
16
JIT Purchasing--Shipping
Scheduling of inbound freight
Gain control by use of – company-owned or contract shipping– contract warehousing– trailers for freight consolidation/storage
![Page 15: 13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.](https://reader036.fdocuments.net/reader036/viewer/2022082611/56649eff5503460f94c154b0/html5/thumbnails/15.jpg)
17
JIT Purchasing--Benefits
Consistent quality
Savings on resources
Lower costs
Special attention
Saving on tooling
Loyalty associated with long-term relationships with suppliers