1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

9
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009

Transcript of 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

Page 1: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

1.3 GHz FNALDressed Cavity

S-1 Global Deliverable to KEK

7 July 2009

Page 2: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

S1-Global Cryomodule

4 KEK cavities

2 DESY, 2 FNAL cavities

Goal: Demonstrate a cryomodule with an average accelerating

gradient of 31.5 MV/m

Fermilab is committed to global international design and collaboration.

Page 3: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

INFN Bladetuner Installation Issues with KEK WPM & Heat Shields

Page 4: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

Motor Interference with Shield andKEK WPM Pipe

Page 5: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

According to INFN, the piezos must be mounted in the horizontal position. In this position, the motor interferes with the KEK WPM pipe.

Page 6: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

Current Dressed Cavity Design

Magnetic shielding not shown

•2 Dressed cavities•HOM couplers, cables, heat sinks•2 He Supply pipe bellows•2 Inter-cavity bellows •Warm and cold couplers•Magnetic shielding as shown•Bladetuner with motor•Seals•Cables•Hardware as shown

Page 7: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

Current Dressed Cavity Design

Magnetic shielding shown

•2 Dressed cavities•HOM couplers, cables, heat sinks•2 He Supply pipe bellows•2 Inter-cavity bellows •Warm and cold couplers•Magnetic shielding as shown•Bladetuner with motor•Seals•Cables•Hardware as shown

Page 8: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

Bladetuner Cables

Page 9: 1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.

Potential Issues• Needle bearings• Main coupler external mounts, hardware,

alignment tooling for installation• Magnetic shielding interface with DESY

cavities• 2-phase He pipe cut-offs and welding the

bellows into the system• Heat-sink straps for coupler shields• Gatevalves / 90 deg valves / blankoffs