CIGRE Tutorial & Colloquium on SMART GRID Mysore, Karnataka, India on 13-15 November, 2013
Under CIGRE Study Committee D2INFORMATION SYSTEMS AND TELECOMMUNICATION
“D2-01_30” “Alarms rationalization in Mexico
power units”
Octavio Gomez and Eric ZabreInstituto de Investigaciones Electricas
Cuernavaca, Morelos, Mexico
D2-01_30
![Page 2: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/2.jpg)
13-15 November, 2013 D2-01_30
CONTENTS:
INTRODUCTION TO ALARM MANAGEMENT IN CONTROL ROOMS.
ALARM RATIONALIZATION FOR PLANT OPERATION.
IMPLEMENTATION OF RATIONALIZED ALARMS.
RESULTS OF APPLY THE ALARM MANAGEMENT IN THE CONTROL ROOMS.
CONCLUSIONS.
![Page 3: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/3.jpg)
13-15 November, 2013 D2-01_30
INTRODUCTION TO ALARM MANAGEMENT IN CONTROL ROOMS:
With each change in the mode of operation of the power unit, the system generates more useless alarms to the operator.
At some power unit in Mexico at 11:00 pm… From control center… -Peak hour is over, please low charge….. The unit is generating 300 mw, and then… low until 180 mw… The monitor of operator receives to alarms flood (300 to 400 alarms/minute).
at 11:30 pm… From control center… -Please up charge because the power central next is shut-down…..!!! The unit is generating 180 mw, and then… up until 300 mw… The monitor of operator receives to alarms flood (300 to 400 alarms/minute)
Operator’s exclamation…I need a better alarms management!!
![Page 4: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/4.jpg)
13-15 November, 2013 D2-01_30
0
100
200
300
400
500
600
HORA
14/1
2/20
12 1
1:00
14/1
2/20
12 2
3:00
15/1
2/20
12 1
1:00
15/1
2/20
12 2
3:00
16/1
2/20
12 1
1:00
16/1
2/20
12 2
3:00
17/1
2/20
12 1
1:00
17/1
2/20
12 2
3:00
18/1
2/20
12 1
1:00
18/1
2/20
12 2
3:00
19/1
2/20
12 1
2:00
20/1
2/20
12 0
0:00
20/1
2/20
12 1
2:00
ALARMAS
Generation of alarms during the operation of the power unit as demand
change.
OVERLOADED
STABLE
INTRODUCTION TO ALARM MANAGEMENT IN CONTROL ROOMS :
![Page 5: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/5.jpg)
13-15 November, 2013 D2-01_30
INTRODUCTION TO ALARM MANAGEMENT IN CONTROL ROOMS :
PHILOSOPHY
AUDIT
RATIONALIZATION
IDENTIFCATION
DESIGN
IMPLEMENTATION
MAINTENANCE
OPERATION
MANANGEMENT OF CHANGE
MONITORING & ASSESSMENT
A
We adopted the Alarm Management Cycle from ANSI/ISA 18.2
J
I
H
G
E
F
D
C
B
![Page 6: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/6.jpg)
13-15 November, 2013 D2-01_30
INTRODUCTION TO ALARM MANAGEMENT IN CONTROL ROOMS :
Diagnosis and determination of “performance level” of alarms systems:Survey to power unit operator
Utility of alarms during normal operation?Utility of alarms during upset?Utility of alarms during shut-down?
EEMUA 191 "Alarm Systems: A Guide to Design, Management and Procurement“ edition 2, - 2007.
AndANSI/ISA-18.2-2009. “Management of Alarm Systems for the Process Industries”.
International Society of Automation. USA 2009.
The methodology to alarms management is based on:
The answer always is the same: low utility.
![Page 7: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/7.jpg)
13-15 November, 2013 D2-01_30
INTRODUCTION TO ALARM MANAGEMENT IN CONTROL ROOMS :
Others issues for diagnosis and determination of “performance level” of alarms systems:
number of alarms in database?rate of alarms during a shift?rate of alarms during an upset?rate of alarms during a shut-down?
Diagnosis: all systems were “OVERLOADED”
![Page 8: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/8.jpg)
13-15 November, 2013 D2-01_30
PERFORMANCE LEVELSEEMUA 191 PREDICTIVE
ROBUST
PREDICTIVESALARMS
STABLE
ADVANCED SOLUTIONS
REACTIVE
ALARM RATIONALIZATION
OVERLOADED
SEPARATE ALARMS OF
EVENTS
![Page 9: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/9.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
Formation of the group responsible for alarms management
Develop alarm philosophy.
Set targets of the rationalization
Gathering data:Historical record,
Database andP&ID’sSetting for each alarm:
TAG, message, set-point,priority,operator action,possible causes and consequences
Separate alarms and events
Master of events
Master of alarms
![Page 10: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/10.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
Formation of the group responsible for alarms management
The Superintendent of Central becomes aware current status of alarm system
The Superintendent of Central designates staff to alarm management.
Chief operating Chief C&I Chief Electrical Facilitator
![Page 11: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/11.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION :
Develop alarm philosophy.
To define responsibilities and functions of each of the participants.
To define basis for design of alarms. To define alarms priority classes. To define criteria for the display alarms in the
operator’s screen. To define the method for monitoring the performance
of alarm system. To define the method of alarm system maintenance. To define tests to alarms. To define structure of alarm system documentation. To define guidelines for implementation of
rationalized alarms. Operator training for new philosofy alarms.
![Page 12: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/12.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
Set targets of the rationalization.
To define the target level of alarm system performance.“STABLE” is the target level.
What kind type of alarms will be rationalized?
Only process alarms?System diagnostic alarms?
Maintenance alarms?
How many alarms are rationalized by day?
PREDICTIVE
ROBUST
PREDICTIVE ALARMS
STABLE AVANCED SOLUTIONS
REACTIVE
ALARM RATIONALIZ
ATION
OVERLADED
SEPARATE ALARMS OF
EVENTS
![Page 13: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/13.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
Gathering data: Historical record, Database and P&ID’s
With historical records, we can identify: Useful alarms. Useless alarms. Nuisance alarms. Frequent alarms. Alarm rate in normal operation. Alarm rate prior to upset. Alarm rate in to upset. Alarm rate after upset.
From the database we can know:Number of alarms configurated in
the DCS, andAlarm type.
From the P&ID´s we can know the process and instrumentation.
20-04-11 02:23:58:189 U4_AETI1676 MET COJ 4 BAA C FALLA Error en el canal20-04-11 02:23:58:179 U4_AETI1670 ENT LUB A ENF BAA C FALLA Error en el canal20-04-11 02:23:33:478 U4_AETI1671 SAL LUB DE ENF BAA C FALLA Error en el canal20-04-11 02:23:32:471 U4_AETI1677 MET COJ 3 BAA C FALLA Error en el canal20-04-11 02:23:30:441 U4_AETI1672 COJ 6 MET AL BAA C FALLA Error en el canal20-04-11 02:23:18:323 U4_AETI1671 SAL LUB DE ENF BAA C FALLA Error en el canal20-04-11 02:23:18:323 U4_AETI1670 ENT LUB A ENF BAA C FALLA Error en el canal20-04-11 02:23:18:323 U4_AETI1672 COJ 6 MET AL BAA C FALLA Error en el canal20-04-11 02:23:18:323 U4_AETI1674 COJ 6 EMPUJE BAA C FALLA Error en el canal20-04-11 02:23:18:323 U4_AETI1675 COJ 5 ACEITE BAA C FALLA Error en el canal
![Page 14: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/14.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
Separate alarms and events(alarm identification)
Events and alarms are presented together in the same display ( list form).
Events: pump turned on,Valve opened, ..and so on.
Alarm: “an audible or visible means of indicating to the operator an equipment or process malfunction or abnormal condition”. (EEMUA 191)
“an audible and/or visible means of indicating to the operator an equipment malfunction, process deviation, or abnormal condition requiring a response”. (ANSI/ISA 18.2)
![Page 15: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/15.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
With master of alarms:
Write a new alarm message: easily understood by the operator.
Define setting alarm: based on the process dynamics.“Chattering alarm require a careful study”
Define priority: Based on available time to attend the alarm and the severity of the consequences.
ALARM PRIORITY
CRITICAL ALARM HIGH
PRE-CRITICAL WARNING MEDIUM
PLANT TOLERANCE LOW
![Page 16: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/16.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
With master of alarms:
Operator actions
Write the operator actions on the process:
To open valve LV 1305To turned off pump P 1305And check indicators.And check equipment.And other actions such as
calling plant engineers.
![Page 17: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/17.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
With master of alarms and P&ID´s:
Identify possibles causes of the alarm:
What happened downstream of the alarm?What happened upstream of the alarm?
What was the first change in the process?What changed surroundings of the process?
Some valve stuck.Some valve that is opened without the ordered by the operator or from DCS.Any pump that provided more flow.A pump turned off without operator
intervention.and so…
![Page 18: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/18.jpg)
13-15 November, 2013 D2-01_30
ALARM RATIONALIZATION FOR PLANT OPERATION:
With master of alarms and P&ID´s:
Identify possibles consequences of the alarm not resolved
opportunely:
Plant trip.Unit trip.
Equipment damage.Loss of process fluids.
Damage to the environment.Injury to staff.
![Page 19: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/19.jpg)
13-15 November, 2013 D2-01_30
IMPLEMENTATION OF RATIONALIZED ALARMS:
With new database of alarmS rationalized:
Configuring DCSCreating new displays in
the DCSTraining operators
Testing alarms
![Page 20: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/20.jpg)
13-15 November, 2013 D2-01_30
RESULTS OF APPLY THE ALARM MANAGEMENT IN THE CONTROL ROOMS:
DCS GT'u IC'u CC'pack STEAM'u HYDRO'uAlarms Before
Rationalization/UAlarms After
Rationalization/UMARK V/SIEMENS 4 880 190ABB/METSO 2 3,400 610OVATION/SIEMENS/METSO
10 3,450 650
DELTA V/ SIEMENS/OVATION/ABB 800XA
25 4,540 1,170
SIEMENS 77 4,750 490
TOTAL 4 2 10 25 77 17,020 3,110
GENERATION POWER UNITS WITH ALARM SYSTEMS RATIONALIZED
![Page 21: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/21.jpg)
13-15 November, 2013 D2-01_30
RESULTS OF APPLY THE ALARM MANAGEMENT IN THE CONTROL ROOMS:
DCS GT'u IC'u CC'pack STEAM'u HYDRO'uSIEMENS 1
ABB/METSO 2OVATION/SIEMENS 4
DELTA V/ SIEMENS/ABB 800XA
14
SIEMENS 69
TOTAL 1 2 4 14 69
IMPLANTED UNITS RATIONALIZED ALARMS
PERFORMANCE LEVEL BEFORE THE RATIONALIZATION:
“OVERLOADED”
PERFORMANCE LEVEL AFTER THE
RATIONALIZATION: “STABLE”
![Page 22: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/22.jpg)
13-15 November, 2013 D2-01_30
Operator alarm display before
alarm rationalization
![Page 23: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/23.jpg)
13-15 November, 2013 D2-01_30
Operator alarm display before alarm rationalization
![Page 24: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/24.jpg)
13-15 November, 2013 D2-01_30
Operator alarm display after alarm rationalization
0
50
100
150
200
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
196
174185
206
![Page 25: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/25.jpg)
13-15 November, 2013 D2-01_30
RESULTS OF APPLY THE ALARM MANAGEMENT IN THE CONTROL ROOMS:
BOMBAS DE ALTA TEMP
BOMBAS DE BAJA TEMP
AEREOENFRIADOR
ES
BOMBAS CONDENSADOS
COMPRESORES INSTRUMENTOS
COMPRESORES SERVICIOS
COMPRESORES ARRANQUE
NIVELES ANORMAL TQ´S
COMBUSTIBLES
TEMP ANORMAL TQ´S COMBUSTIBLES
NIVELES ANORMAL TQ´S ACEITES
LODOS
DISPARO DISPARO DISPARO DISPARO BAJA PRESION BAJA PRESION BAJA PRESIONN. DERRAME / BAJO
NIVELBAJA / ALTA
N. DERRAME / BAJO NIVEL
GENERADOR PRINCIPAL
AGUA DE ENFRIAMIENTO DE
MOTORMETAL CAMISA
FUEGO CAMARA DE BARRIDO
BOMBAS ALFA LUBRICADOR
CIRCUITO AIRE GASES MOTOR
CIRCUITO ACEITE DE MOTOR
BOMBAS PPAL ACEITE CIR
BOMBAS MODULO COMB
MODULO COMBUSTIBLE
RED. CARGAREQUIERE
AUMENTO ACEITERED. CARGA DISPARO RED. CARGA RED. CARGA DISPARO DISPARO BAJA PRESION
VENTILADORES CASA MAQUINAS
VENTILADORES AUXILIARES
TURBO CARGADOR
DETECTORES NIEBLA MODULO ALFA
LUBRICADOR
PROTECCIONES DEL MOTOR PPAL
CALDERA AUXILIAR
CALDERA DE RECUPERACION
BOMBAS CALDERA RECUPERACION
NIVELES CALDERIN / DESGASIFICADOR
DISPARO DISPARO DISPARO DISPARO DISPARO CIERRE VANOS DISPARON. DERRAME / BAJO
NIVEL
BOTON PARO EMERGENCIA
OPERADO TURBINA VAPOR
SISTEMA VACIO TURBINA
AEREOCONDENSADORES
FRECUENCIA DEL SISTEMA
OPERACIÓN DE PROTECCIONES TR
PPAL
OPERACIÓN DE PROTECCIONES TR
´S AUX.
OPERACIÓN DE PROTECCIONES
GENERADOR
INTERRUTORES ACOMETIDAS BOM1
AER1
INTERRUTORES ACOMETIDAS BOM2
AER2
DISPARO DISPARO BAJO VACIO DISPARO ALTA / BAJA ABIERTO 92020 ABIERTO ACOM ABIERTO 52G ABIERTO ABIRTO
INTERRUTOR ACOMETIDA CCM
SE Y SA
GENERADOR DIESEL CARGADORES DE
BATERIASINVERSOR
OPERACIÓN AUXILIARES 86
ULTIMA ALARMA
REVISION
ABIERTO INDISPONIBLE ACCIONES
HIST EVENTOS TAG DESCRIPCION ALARMA REVISION ACCION
New operator alarm display.
![Page 26: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/26.jpg)
13-15 November, 2013 D2-01_30
Operator alarm display after alarm
rationalization.Critical alarms
![Page 27: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/27.jpg)
13-15 November, 2013 D2-01_30
Operator alarm display after to the
rationalization.Pre-critical alarms
![Page 28: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/28.jpg)
13-15 November, 2013 D2-01_30
The “alarm book” as an
aid to the operator.
![Page 29: 13-15 November, 2013](https://reader036.fdocuments.net/reader036/viewer/2022070415/56814f36550346895dbcd3d0/html5/thumbnails/29.jpg)
13-15 November, 2013 D2-01_30
The performance level of alarm system in generating units should be STABLE to avoid:
Plant trip.Unit trip.
Equipment damage.Loss of process fluids.
Damage to the environment.Injury to staff
The operator display should be changed to operator have more
process information.
CONCLUSIONS: