TAMU - PemexOffshore Drilling
Lesson 12
- Special Problems
- Rigs
-
8/9/2019 12. Special Problems
2/42
2
Lesson 12 - Special Problems
Special Problems
Navigation
Workboats
Tides
Miscellaneous API RP 2P- Spread Mooring
Rigs, Arctic Drilling, etc.
-
8/9/2019 12. Special Problems
3/42
3
Figure 9.1. Navigation using circular grid
Navigation
Measured
distanceKnown
distance
Measured
distance
M
A B
Need two or more fixed radio stations - electromagnetic signals. CircularNavigation System. Short range.
Quite accurate. Stations A & B can be on shore or on platforms. A third station may be needed...
-
8/9/2019 12. Special Problems
4/42
4
Fig. 9-2. A
hyperbolic gridformed by
taking the
difference in
distance to thefixed stations A
and B.
Stations A & B are contacted simultaneously. Difference in arrival times locates you on a hyperbola.
A third station is needed to specify where on the hyperbola. Not very accurate. A & B are slave stations.
0
-
8/9/2019 12. Special Problems
5/42
5
Figure 9.4 - Relative geometry of shipboard
user and satellite
Time T3
Computer
Receiver
Time T2Satellite Orbit
Time T1
On the first pass, position to ~ 1/10 mile. After several passes ~ 100 ft. 9 EA 2-minute messages
are available on each pass. Utilizes Doppler frequency shift.
-
8/9/2019 12. Special Problems
6/42
6
Drillship
R.F. Bauer
Global MarineWD = 2000'
-
8/9/2019 12. Special Problems
7/42
7
Comparison of Vessel Characteristics
Property Workboat Drilling Vessel
Primary In Transit Moored
location
Location Maneuver or Moored
during or go to
Storm harbor
Vessel Generally bad, Must
motion but of minor be low
concern
-
8/9/2019 12. Special Problems
8/42
8
Comparison of Vessel Characteristics
Property Workboat Drilling Vessel
Load Load and unload For drilling
arrangement part of cargo, then operation
ballast to safe trim efficiency
Loading and Easy to load and Relatively little
unloading discharge full cargo cargo change
Maneuver- Very important Relatively
ability unimportant
Propulsion/ 2 to 4 hp/ton Less than
displacement 1 hp/ton
load line limit
-
8/9/2019 12. Special Problems
9/42
9
9 3:
N N
85
( ) 66 85
( ) 69 86
8 6 844
85 83
3 969 3 5
3 88 6 4
9 6 5
N( )
4 @ 63
4 @ 53
699
N :
-
8/9/2019 12. Special Problems
10/42
10
Table 9-3: Characteristics of Offshore Vessels:Load Line Data
Ship No. 1 Ship No. 2
Draft H 1410 156
Length water lineLWL
166 185
Displacement, LT 1,767 2,050
The workboat is the workhorse of the offshore industry. One per ship? Less? Up to 3!
-
8/9/2019 12. Special Problems
11/42
11
1
1 1 1 1
1 7
7
1 1 1
7
1 7 1
-
8/9/2019 12. Special Problems
12/42
12
Drill Water Fuel Tanks
Pneumatic Tanks
Engine
Room
Fresh Water
The workboat brings supplies for drilling a well. Places anchors. Most tanks are below deck.
-
8/9/2019 12. Special Problems
13/42
13
Maximum Storm Condition orth Sea
With 496 ft leg
Water depth 31 ft
Max wave height 85 ft
Corresponding wave
period
14 sec
Max wind velocity 89 kts
Air gap 65 ft
Current 1 6 kts
Penetration 1 ft
*Cantilever extended 55 ft alt; Full dynamicanalysis
Jack-up
Rig
-
8/9/2019 12. Special Problems
14/42
14
Dimensions and Capacities
Jacking SystemNumber 3 X 12 pinions
Size 1,000 kips (446 T) per pinion continuous jacking
Size 1,600 kips (726) per pinion maximum holdingJacking speed 1.55 ft/min.
Rack Chock System
6 racks per leg for 3 legsDesign Friede & Goldman
39,000 kips capacity--- hydraulic
-
8/9/2019 12. Special Problems
15/42
15
Figure 9.8 - Idealized oscillations of tides
Neap Tide
Once or twice per day
Mean
Water
Level
Spring tide
14-19 Days
Tide = sea level oscillations of approximately daily or twice per day. Affect KB height above ML.
Measurements should be normalized to Mean Water Level. Tides vary from
-
8/9/2019 12. Special Problems
16/42
16
Figure 9.9 -
Typical
tide curves
for UnitedStates
ports.
-
8/9/2019 12. Special Problems
17/42
17
Figure 9.9 - Typical tide curves for
United States ports
Boston
New York
-
8/9/2019 12. Special Problems
18/42
18
Figure 9.9 - Typical tide curves for
United States ports.
Hampton Roads
Savannah River Entr.
-
8/9/2019 12. Special Problems
19/42
19
Figure 9.9 - Typical tide curves for
United States ports.
Key West
Pensacola
Galveston
NOTE: Pensacola - almost disappears! Galveston - from 1 to 2 cycles per day!
21
0
Ft
-
8/9/2019 12. Special Problems
20/42
20
API RP 2P
January 1
1984
-
8/9/2019 12. Special Problems
21/42
21
Figure 9 - Basic Catenary Relationships
X1X
222
!!
! ?
-
8/9/2019 12. Special Problems
22/42
22
Figure 10.
Force
Geometry
and Vector
Diagram
-
8/9/2019 12. Special Problems
23/42
23
Fig. 11 - Example Analysis Wind Areas
NOTE: API RP 2P
has differentforce equations
-
8/9/2019 12. Special Problems
24/42
24
Acoustic Position Reference System.
Source: Honeywell
Beacon-
signaltransmission
Wellhead
assembly
Sea bottom
HydrophonesHydrophone signal
Ship position
Wellhead
position
Position Indicating
Display
Vessel
Short base Line phase comparison system
-
8/9/2019 12. Special Problems
25/42
25
Tilt Indicator for Guide Structures
May be mounted on temporary guide base. View with camera. Start hole within 1/2 deg. of vertical.
-
8/9/2019 12. Special Problems
26/42
26
Offshore Drilling Structures
Offshore Drilling Structures
Fixed
Floating
Tension Log
-
8/9/2019 12. Special Problems
27/42
27
Ice Floes in the Beaufort Sea
Can be up to 10 miles * 20 miles * 200 ft
It is a good idea to get out of the way when one of these babies comes along! Glory Hole may be needed
52,800 * 105,600 * 200 * 62.4 * 0.9 = 6.26 E13 lbs } 31 billion tons!
-
8/9/2019 12. Special Problems
28/42
28
Typical Jack-up & Platform layout
Spud Cans
Platform Piles
WL
ML
-
8/9/2019 12. Special Problems
29/42
29
Fixed Jacking System with Leg Locking Device
-
8/9/2019 12. Special Problems
30/42
30
-
8/9/2019 12. Special Problems
31/42
31
NobleDrillings
Cecil
Forbes
A Jack-Up
Rig
-
8/9/2019 12. Special Problems
32/42
32
Shells
Cognac
Conventional
20-well
Platform
Wells are
directionally
drilled
-
8/9/2019 12. Special Problems
33/42
33
Shells
BullwinkleWorlds tallest
offshore
structure
1,353 water
depth
Production
began in 198945,000 b/d
80MM scf/d
-
8/9/2019 12. Special Problems
34/42
34
Small
concrete
monotower
concept
Concrete
Monotower
Concept
GravityStructure
-
8/9/2019 12. Special Problems
35/42
35
Several
guy wiresand clump
weights
support acompliant
platform.
Guy wires
-
8/9/2019 12. Special Problems
36/42
36
A semisubmersible with floats that are located
below the waterline when drilling
Main Deck
Column
-
8/9/2019 12. Special Problems
37/42
37
-
8/9/2019 12. Special Problems
38/42
38
Sonats
George
Washington
A Semi-
Submersible
Rig
-
8/9/2019 12. Special Problems
39/42
39
Zapatas
Trader
A Drillship
-
8/9/2019 12. Special Problems
40/42
40
Joides
Resolution
Ocean DrillingProgram
-
8/9/2019 12. Special Problems
41/42
41
Production
Platform
Steel Tubes
Several
tensioned
tubes hold atension-leg
platform on
station.
-
8/9/2019 12. Special Problems
42/42
42