12. Special Problems

download 12. Special Problems

of 42

Transcript of 12. Special Problems

  • 8/9/2019 12. Special Problems

    1/42

    1

    TAMU - PemexOffshore Drilling

    Lesson 12

    - Special Problems

    - Rigs

  • 8/9/2019 12. Special Problems

    2/42

    2

    Lesson 12 - Special Problems

    Special Problems

    Navigation

    Workboats

    Tides

    Miscellaneous API RP 2P- Spread Mooring

    Rigs, Arctic Drilling, etc.

  • 8/9/2019 12. Special Problems

    3/42

    3

    Figure 9.1. Navigation using circular grid

    Navigation

    Measured

    distanceKnown

    distance

    Measured

    distance

    M

    A B

    Need two or more fixed radio stations - electromagnetic signals. CircularNavigation System. Short range.

    Quite accurate. Stations A & B can be on shore or on platforms. A third station may be needed...

  • 8/9/2019 12. Special Problems

    4/42

    4

    Fig. 9-2. A

    hyperbolic gridformed by

    taking the

    difference in

    distance to thefixed stations A

    and B.

    Stations A & B are contacted simultaneously. Difference in arrival times locates you on a hyperbola.

    A third station is needed to specify where on the hyperbola. Not very accurate. A & B are slave stations.

    0

  • 8/9/2019 12. Special Problems

    5/42

    5

    Figure 9.4 - Relative geometry of shipboard

    user and satellite

    Time T3

    Computer

    Receiver

    Time T2Satellite Orbit

    Time T1

    On the first pass, position to ~ 1/10 mile. After several passes ~ 100 ft. 9 EA 2-minute messages

    are available on each pass. Utilizes Doppler frequency shift.

  • 8/9/2019 12. Special Problems

    6/42

    6

    Drillship

    R.F. Bauer

    Global MarineWD = 2000'

  • 8/9/2019 12. Special Problems

    7/42

    7

    Comparison of Vessel Characteristics

    Property Workboat Drilling Vessel

    Primary In Transit Moored

    location

    Location Maneuver or Moored

    during or go to

    Storm harbor

    Vessel Generally bad, Must

    motion but of minor be low

    concern

  • 8/9/2019 12. Special Problems

    8/42

    8

    Comparison of Vessel Characteristics

    Property Workboat Drilling Vessel

    Load Load and unload For drilling

    arrangement part of cargo, then operation

    ballast to safe trim efficiency

    Loading and Easy to load and Relatively little

    unloading discharge full cargo cargo change

    Maneuver- Very important Relatively

    ability unimportant

    Propulsion/ 2 to 4 hp/ton Less than

    displacement 1 hp/ton

    load line limit

  • 8/9/2019 12. Special Problems

    9/42

    9

    9 3:

    N N

    85

    ( ) 66 85

    ( ) 69 86

    8 6 844

    85 83

    3 969 3 5

    3 88 6 4

    9 6 5

    N( )

    4 @ 63

    4 @ 53

    699

    N :

  • 8/9/2019 12. Special Problems

    10/42

    10

    Table 9-3: Characteristics of Offshore Vessels:Load Line Data

    Ship No. 1 Ship No. 2

    Draft H 1410 156

    Length water lineLWL

    166 185

    Displacement, LT 1,767 2,050

    The workboat is the workhorse of the offshore industry. One per ship? Less? Up to 3!

  • 8/9/2019 12. Special Problems

    11/42

    11

    1

    1 1 1 1

    1 7

    7

    1 1 1

    7

    1 7 1

  • 8/9/2019 12. Special Problems

    12/42

    12

    Drill Water Fuel Tanks

    Pneumatic Tanks

    Engine

    Room

    Fresh Water

    The workboat brings supplies for drilling a well. Places anchors. Most tanks are below deck.

  • 8/9/2019 12. Special Problems

    13/42

    13

    Maximum Storm Condition orth Sea

    With 496 ft leg

    Water depth 31 ft

    Max wave height 85 ft

    Corresponding wave

    period

    14 sec

    Max wind velocity 89 kts

    Air gap 65 ft

    Current 1 6 kts

    Penetration 1 ft

    *Cantilever extended 55 ft alt; Full dynamicanalysis

    Jack-up

    Rig

  • 8/9/2019 12. Special Problems

    14/42

    14

    Dimensions and Capacities

    Jacking SystemNumber 3 X 12 pinions

    Size 1,000 kips (446 T) per pinion continuous jacking

    Size 1,600 kips (726) per pinion maximum holdingJacking speed 1.55 ft/min.

    Rack Chock System

    6 racks per leg for 3 legsDesign Friede & Goldman

    39,000 kips capacity--- hydraulic

  • 8/9/2019 12. Special Problems

    15/42

    15

    Figure 9.8 - Idealized oscillations of tides

    Neap Tide

    Once or twice per day

    Mean

    Water

    Level

    Spring tide

    14-19 Days

    Tide = sea level oscillations of approximately daily or twice per day. Affect KB height above ML.

    Measurements should be normalized to Mean Water Level. Tides vary from

  • 8/9/2019 12. Special Problems

    16/42

    16

    Figure 9.9 -

    Typical

    tide curves

    for UnitedStates

    ports.

  • 8/9/2019 12. Special Problems

    17/42

    17

    Figure 9.9 - Typical tide curves for

    United States ports

    Boston

    New York

  • 8/9/2019 12. Special Problems

    18/42

    18

    Figure 9.9 - Typical tide curves for

    United States ports.

    Hampton Roads

    Savannah River Entr.

  • 8/9/2019 12. Special Problems

    19/42

    19

    Figure 9.9 - Typical tide curves for

    United States ports.

    Key West

    Pensacola

    Galveston

    NOTE: Pensacola - almost disappears! Galveston - from 1 to 2 cycles per day!

    21

    0

    Ft

  • 8/9/2019 12. Special Problems

    20/42

    20

    API RP 2P

    January 1

    1984

  • 8/9/2019 12. Special Problems

    21/42

    21

    Figure 9 - Basic Catenary Relationships

    X1X

    222

    !!

    ! ?

  • 8/9/2019 12. Special Problems

    22/42

    22

    Figure 10.

    Force

    Geometry

    and Vector

    Diagram

  • 8/9/2019 12. Special Problems

    23/42

    23

    Fig. 11 - Example Analysis Wind Areas

    NOTE: API RP 2P

    has differentforce equations

  • 8/9/2019 12. Special Problems

    24/42

    24

    Acoustic Position Reference System.

    Source: Honeywell

    Beacon-

    signaltransmission

    Wellhead

    assembly

    Sea bottom

    HydrophonesHydrophone signal

    Ship position

    Wellhead

    position

    Position Indicating

    Display

    Vessel

    Short base Line phase comparison system

  • 8/9/2019 12. Special Problems

    25/42

    25

    Tilt Indicator for Guide Structures

    May be mounted on temporary guide base. View with camera. Start hole within 1/2 deg. of vertical.

  • 8/9/2019 12. Special Problems

    26/42

    26

    Offshore Drilling Structures

    Offshore Drilling Structures

    Fixed

    Floating

    Tension Log

  • 8/9/2019 12. Special Problems

    27/42

    27

    Ice Floes in the Beaufort Sea

    Can be up to 10 miles * 20 miles * 200 ft

    It is a good idea to get out of the way when one of these babies comes along! Glory Hole may be needed

    52,800 * 105,600 * 200 * 62.4 * 0.9 = 6.26 E13 lbs } 31 billion tons!

  • 8/9/2019 12. Special Problems

    28/42

    28

    Typical Jack-up & Platform layout

    Spud Cans

    Platform Piles

    WL

    ML

  • 8/9/2019 12. Special Problems

    29/42

    29

    Fixed Jacking System with Leg Locking Device

  • 8/9/2019 12. Special Problems

    30/42

    30

  • 8/9/2019 12. Special Problems

    31/42

    31

    NobleDrillings

    Cecil

    Forbes

    A Jack-Up

    Rig

  • 8/9/2019 12. Special Problems

    32/42

    32

    Shells

    Cognac

    Conventional

    20-well

    Platform

    Wells are

    directionally

    drilled

  • 8/9/2019 12. Special Problems

    33/42

    33

    Shells

    BullwinkleWorlds tallest

    offshore

    structure

    1,353 water

    depth

    Production

    began in 198945,000 b/d

    80MM scf/d

  • 8/9/2019 12. Special Problems

    34/42

    34

    Small

    concrete

    monotower

    concept

    Concrete

    Monotower

    Concept

    GravityStructure

  • 8/9/2019 12. Special Problems

    35/42

    35

    Several

    guy wiresand clump

    weights

    support acompliant

    platform.

    Guy wires

  • 8/9/2019 12. Special Problems

    36/42

    36

    A semisubmersible with floats that are located

    below the waterline when drilling

    Main Deck

    Column

  • 8/9/2019 12. Special Problems

    37/42

    37

  • 8/9/2019 12. Special Problems

    38/42

    38

    Sonats

    George

    Washington

    A Semi-

    Submersible

    Rig

  • 8/9/2019 12. Special Problems

    39/42

    39

    Zapatas

    Trader

    A Drillship

  • 8/9/2019 12. Special Problems

    40/42

    40

    Joides

    Resolution

    Ocean DrillingProgram

  • 8/9/2019 12. Special Problems

    41/42

    41

    Production

    Platform

    Steel Tubes

    Several

    tensioned

    tubes hold atension-leg

    platform on

    station.

  • 8/9/2019 12. Special Problems

    42/42

    42