11kW Grid Tie Solar Plant Simulation report. Heliscope
3
Annual Production Report produced by Nithya Varghese © 2016 Folsom Labs 1/3 March 15, 2016 kWh Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 500 1000 1500 2000 Shading: 6.8% Reflection: 3.2% Soiling: 2.0% Irradiance: 1.0% Temperature : 8.0% Mismatch: 10.3% Wiring: 0.2% Clipping: 0.0% Inverters: 2.8% AC System: 0.0%
-
Upload
nithya-susan-varghese -
Category
Engineering
-
view
227 -
download
3
Transcript of 11kW Grid Tie Solar Plant Simulation report. Heliscope
AnnualProductionReportproducedbyNithyaVarghese
©2016FolsomLabs 1/3 March15,2016
kWh
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0
500
1000
1500
2000
Shading:6.8%
Reflection:3.2%
Soiling:2.0%
Irradiance:1.0%
Temperature :8.0%
Mismatch:10.3%
Wiring:0.2%
Clipping:0.0%
Inverters:2.8%
ACSystem:0.0%
AnnualProductionReportproducedbyNithyaVarghese
©2016FolsomLabs 2/3 March15,2016
AnnualProductionReportproducedbyNithyaVarghese
©2016FolsomLabs 3/3 March15,2016