11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

29
gnerat i on Valve Design Discussions November 27"1, 2012 (Redacted Version) © 2012 Babcock & Wilcox mPower, Inc. All Rights Reserved. This document is the property of Babcock & Wilcox mPower, Inc. (B&W mPower) and is "CONFIDENTIALAND PROPRIETARY" to B&W mPower. Recipient and/or its representatives have, by receiving same, agreed to maintain its confidentiality and shall not reproduce, copy, disclose or disseminate the contents, in whole or in part, to any person or entity other than the Recipient and/or Recipient's representatives without the prior written consent of B&W mPower. This is a pre-application document and includes preliminary B&W mPower Reactor design or design supporting information and is subject to further internal review, revision, or verification.

Transcript of 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

Page 1: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

gnerat i on

Valve Design DiscussionsNovember 27"1, 2012

(Redacted Version)

© 2012 Babcock & Wilcox mPower, Inc. All Rights Reserved. This document is the property of Babcock & Wilcox mPower, Inc. (B&W mPower) and is "CONFIDENTIALANDPROPRIETARY" to B&W mPower. Recipient and/or its representatives have, by receiving same, agreed to maintain its confidentiality and shall not reproduce, copy, disclose ordisseminate the contents, in whole or in part, to any person or entity other than the Recipient and/or Recipient's representatives without the prior written consent of B&W mPower.

This is a pre-application document and includes preliminary B&W mPower Reactor design or design supporting information and is subject to further internal review, revision, or verification.

Page 2: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

cg e r• e r ato (1)

Agenda

• Objectives

* Background

* Brief reactor coolant system (RCS) overview

* [ ] Valve (IIV) Benefits• Emergency Core Cooling (ECC) LOCA response* IIV concept and lower vessel flange design

, Conceptual design and analysis

IV testing

IV inspection/monitoring

Operating experience

, IIV maintenance

SIIV qualification* Conclusions" Discussion

0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 2

Page 3: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

niPowerFfObjectives

• Describe IIV conceptual design, locations, andfunctions

* Discuss benefits for IIV use in mPower design

* Solicit feedback on approach for IIV

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 3

Page 4: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e eratio rI

BackgroundCurrent PWR's

, Large quantities of Class 1 piping, fittings and welds, Two reactor coolant pressure boundary (RCPB) isolation valves

mPowerTM Reactor

mPower Benefits, Proven technology - typical Class 1 RCPB componentso Eliminates potential failure of RCPB piping, fittings, welds, Drastically improves safety margins and overall reliability

I v[5, Ag~]

0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCM per Affidavit 4(a)-(d)]

Page 5: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

e3 r1 e (r a t i o 0

RCS Overview[

IC) 2012 Babcock & Wilcox mPower, Inc. All rights reserved.

[CCl per Affidavit 4(a)-(d)] 5

Page 6: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e ri e ratio ro

Benefits of IIVs

* Provide [boundary

• Eliminate

Iof reactor coolant pressure

RCS inventory loss through [ I

° Eliminate concerns [I

* Enable up to[ I

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 6

Page 7: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

cienet aitf(D)

Emergency Core Cooling (ECC)LOCA Response

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 7

Page 8: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e n e rat o n-

moPowILOCA Response Without IIVs

I

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)]-t

8

Page 9: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

n)Ip Ic:r

[

I0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 9

Page 10: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g en e rat ior

mhrkPoRepnHigh Break LOCA Response With IIVs

[

1

I(V 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCl per Affidavit 4(a)-(d)] 10

Page 11: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

Conceptual Design and Analysis(Letdown POVs)

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 11

Page 12: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

cj e n e ration

Letdown IIV

I

0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 12

Page 13: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

nPoww%Cross Section View- Letdown 1IV

]

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 13

Page 14: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

(3e n e rfl: L t 1 0 t -

mPouwrConceptual Design -lIIV

O[ ]o Materials

[

I* Flange Design

[

I

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved.[CCI per Affidavit 4(a)-(d)] 14

Page 15: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

e. en e r at t0I)l

Pressure, Seismic, & Preload Stresses[

]© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 1s

Page 16: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

ce n e rat 0o r't

em, Po&PwePressure, Seismic, & Preload Stresses

]© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 16

Page 17: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

(e n 0 1-() L

Lower Vessel Flange Design

[

]

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 17

Page 18: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

c e n e r oat i U-1

Lower Vessel Flange Design

]

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 18

Page 19: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

(ane r~ i otii()V

IIV Testing and Inspection

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 19

Page 20: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e r-i e rat 1io U1

1IV Testing

I-ý7

Consistent with current practice

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCM per Affidavit 4(a)-(d)] 20

Page 21: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

(4e t () e o t) i

miPoweInspection / Monitoring

]

0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [CCI per Affidavit 4(a)-(d)] 21

Page 22: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e n e ra tio ro

Operating Experience

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 22

Page 23: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

OE and Lessons Learned" Motor operated valves (MOV)

Industry experience and regulatory guidance shall be incorporated intoMOV Program (e.g.)- JOG Program will be incorporated

o Report MPR-2425-A used as a starting point for Class D valves0 Periodic verification based on safety significance classification and functional

margino Extensive qualification testing will be employed to quantify degradation issues

* Other power operated valves (AOV, SOV and HOV)o RIS 2000-03, program attributes will incorporate MOV lessons learned, Performance data information from NUREG/CR-6644

" Check Valves, NUREG/CR-5944 - Characterization of degradation and failures (e.g.)

, Nuclear Industry Check Valve Group (NIC)© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 23

Page 24: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e r e ratio t)

OE and Lessons Learned (cont.)

Flanges and BoltsFlange leakage observed; caused by deterioration of bolt or boltpreload after several operation cycles

- GSI-29

Industry recommendations and guidelines incorporated in boltingintegrity program

- Material selection and testing

- Bolting preload control

- In-service inspection

- Plant operation and maintenance

- Evaluation of structural integrity of bolted joints

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 24

Page 25: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

mnPonwerfi

Maintenance and Qualification

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 25

Page 26: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

IIV Maintenance

e Typical MOV/POV Periodic Maintenance

, Packing replacement/adjustment

, Seal inspection/replacement

, Valve stem inspection

, Lubrication locations

, Bolt torque for bonnet to body joints

k Proper lifting and handling procedure

, Actuator maintenance

In kind Replaceable

0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 26

Page 27: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

q e- r''i e t ci [ i o i i

IIV Qualification

* Comply with

, QME-1 (2007): End of life test, design basis event, production testing

, IEEE-323: Class 1 E equipment (MOV, SOV, Switches) purchasequalified components

, IEEE-382: Actuator qualification done by Actuator vendor

, IEEE-344: Seismic test/analysis methods (shake table testing,analytical methods)

• Create report per QV-7461.1

* Reports for production valve

(qualified valve)

per QV-7463.1

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 27

Page 28: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

g e e ra tio n

Conclusions

* IIV design is an innovative application of provenvalve technology with performance within Codelimits

* IIV Application in the mPower design [I concerns and improves safety with

enhanced post LOCA response for the plant

0 2012 Babcock & Wilcox mPower, Inc. All rights reserved. [M per Affidavit 4(a)-(d)] 28

Page 29: 11/27/2012 - Updated mPower Presentation Slides, "Valve - NRC

Discussion

© 2012 Babcock & Wilcox mPower, Inc. All rights reserved. 29