111Portfolio Submission resit.indd
-
Upload
connor-whyatt -
Category
Documents
-
view
82 -
download
0
Transcript of 111Portfolio Submission resit.indd
![Page 1: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/1.jpg)
Digital Media 2BA (Hons) Interior Design
Cambridge School of Art
Module Code: MOD000169
Semester 1
Environment Project
Connor Whyatt
![Page 2: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/2.jpg)
INDEX
Location/ Map page 3
Floor Plans page 4
Section/ Elevation page 5
3 Dimensional View page 6
Perspective View page 7
![Page 3: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/3.jpg)
LOCATION / MAP
Site AnalysisThe site is located North East of Cambridge city centre.The bridge, also known as ‘The Cutter Ferry Bridge’, oneof the main walkways. It gets conjested very easily andquickly if theres a large number of people that cross itdaily.All the Cambridge college and Anglia Ruskin Universi-ty boat houses run across the River Cam and the CutterFerry Bridge is the only walkway for the students. I havedone surveys around the space and a lot of people feelthat students are one of the main causes for its conjes-tion.There are also the problem of the number of cyclists, toomany at ove can casue serious problems for the users.My aim for this project is to have ease of flow for peoplearound the space to help stop the conjestion problems.
![Page 4: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/4.jpg)
FLOOR PLANS
Original Floor Plans
I highlighted the original floor plans of thebridge and placed people to get a sense ofthe scale, all of which were created by usingPhotoshop.
My proposed Floor Planscale 1:100
Rendered FloorPlan
![Page 5: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/5.jpg)
SECTION
My proposal:The main walkway of the bridge will be made of glass, supported by twoconcrete structures. The two ramps will have a concrete walkway. All ofwhich will have a glass banister either side joined with a steel handrail.Wires will be connected from the tip of the concrete structure to the steelhandrail.The stairs wll also be made of concrete,supported by steel structures andglass banisters.
![Page 6: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/6.jpg)
Perspectives
Concept Image
![Page 7: 111Portfolio Submission resit.indd](https://reader035.fdocuments.net/reader035/viewer/2022062600/5888581a1a28ab951c8b702f/html5/thumbnails/7.jpg)
3 Dimensional View of my design