22 Engineered Systems February 2011 BY AMANDA MCKEW Date: February 2011 Building: Commercial office building Floor: Mechanical penthouse Year installed: 1976 Inspected by: AEM Serial number: 1110101028 Equipment Type: Chilled water pump Manufacturer: X-Y-Z Model: DFDD CHWP Size: 660 gpm Hp: 20 Volts: 460/3/60 EXISTING CONDITIONS AND DEFICIENCIES END OF EQUIPMENT USEFUL SERVICE LIFE (USL) STANDARDS AND CODE ISSUES ENERGY CONSERVATION NOTES PUMP: P1-A TheFacilityFiles Y N NA Y N NA HVAC ELECTRICAL Pump in good condition? Are the motors high efficiency? Is there sufficient head? Is there a localized disconnect? Is pressure testing of pipe distribution complete? Does the unit have VSD fans? Is the pump/piping system leak-free? Pressure differential installed around pump into one gauge? PLUMBING Is the insulation installation complete? Are there localized drains to serve the unit? Equipment and piping labeled with applicable tag and flow arrows? MAINTENANCE Flow sensors installed and monitoring flow? System flow diagram mounted by unit? Temperature sensors installed and functioning? O&M manual secured at unit or on file? Is the piping installed per detail? Work order last completed? Is there access around equipment? Is there a service contract for the pump? Is there any excess vibration at the pump? All ATC devices appear in good condition? Y N NA Y N NA Does unit meet current codes? Does unit/system meet current energy code? Is emergency power a requirement? Y N NA Y N NA End of USL, replace with new VSD high-efficiency pump? Consider thermal ice storage? Can unit/system be retrofitted to meet latest energy code? Consider DDC, optimize control system management. Consider waterside economizer? 1. Can equipment be readily renovated? 4. Are unit controls interactive with building ATC/computer? 2. Unit basically operates 24/7 year-round. 5. Are there energy meters (gpm, etc.)? USL (YRS) USL (YRS) 35 Motor is 35 yrs old 20 Motor USL benchmark is 20 yrs old. 35 Controls are 35 yrs old 16 Controls USL benchmark is 16 yrs old. 35 Unit is 35 yrs old 20 Unit USL benchmark is 16 yrs old. McKew is a senior project engineer with InterPro Solutions. Reach her at [email protected]. CARBON FOOTPRINT Carbon Neutral

Transcript of 1102 the Facility Files

Page 1: 1102 the Facility Files

22 Engineered Systems February 2011

BY AMANDA MCKEW

Date: February 2011Building: Commercial office building Floor: Mechanical penthouseYear installed: 1976Inspected by: AEMSerial number: 1110101028Equipment Type: Chilled water pump Manufacturer: X-Y-ZModel: DFDD CHWPSize: 660 gpmHp: 20Volts: 460/3/60

EXISTING CONDITIONS AND DEFICIENCIES

END OF EQUIPMENT USEFUL SERVICE LIFE (USL)

STANDARDS AND CODE ISSUES

ENERGY CONSERVATION

NOTES

PUMP: P1-A

�TheFacilityFiles

Y N NA Y N NAHVAC ELECTRICAL

❑ ❑ ❑ Pump in good condition? ❑ ❑ ❑ Are the motors high efficiency?

❑ ❑ ❑ Is there sufficient head? ❑ ❑ ❑ Is there a localized disconnect?

❑ ❑ ❑ Is pressure testing of pipe distribution complete? ❑ ❑ ❑ Does the unit have VSD fans?

❑ ❑ ❑ Is the pump/piping system leak-free?

❑ ❑ ❑ Pressure differential installed around pump into one gauge? PLUMBING

❑ ❑ ❑ Is the insulation installation complete? ❑ ❑ ❑ Are there localized drains to serve the unit?

❑ ❑ ❑ Equipment and piping labeled with applicable tag and flow arrows? MAINTENANCE

❑ ❑ ❑ Flow sensors installed and monitoring flow? ❑ ❑ ❑ System flow diagram mounted by unit?

❑ ❑ ❑ Temperature sensors installed and functioning? ❑ ❑ ❑ O&M manual secured at unit or on file?

❑ ❑ ❑ Is the piping installed per detail? ❑ ❑ ❑ Work order last completed?

❑ ❑ ❑ Is there access around equipment? ❑ ❑ ❑ Is there a service contract for the pump?

❑ ❑ ❑ Is there any excess vibration at the pump?

❑ ❑ ❑ All ATC devices appear in good condition?

Y N NA Y N NA❑ ❑ ❑ Does unit meet current codes? ❑ ❑ ❑ Does unit/system meet current energy code?

❑ ❑ ❑ Is emergency power a requirement?

Y N NA Y N NA❑ ❑ ❑ End of USL, replace with new VSD high-efficiency pump? ❑ ❑ ❑ Consider thermal ice storage?

❑ ❑ ❑ Can unit/system be retrofitted to meet latest energy code? ❑ ❑ ❑ Consider DDC, optimize control system management.

❑ ❑ ❑ Consider waterside economizer? ❑ ❑ ❑

1. Can equipment be readily renovated? 4. Are unit controls interactive with building ATC/computer?

2. Unit basically operates 24/7 year-round. 5. Are there energy meters (gpm, etc.)?

USL (YRS) USL (YRS)35 Motor is 35 yrs old 20 Motor USL benchmark is 20 yrs old.

35 Controls are 35 yrs old 16 Controls USL benchmark is 16 yrs old.

35 Unit is 35 yrs old 20 Unit USL benchmark is 16 yrs old.

McKew is a senior project engineer with InterPro Solutions. Reach her at [email protected].