11 Wcdma Rnp&Rno Conspectus

download 11 Wcdma Rnp&Rno Conspectus

of 45

Transcript of 11 Wcdma Rnp&Rno Conspectus

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    1/45

    WCDMA RNP&RNO

    Conspectus

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    2/45

    Main Topics WCDMA RNP Principles and

    Procedures

    WCDMA RNO Principles andProcedures

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    3/45

    WCDMA RNP Overview

    WCDMA Radio Network Dimensioning

    WCDMA Nominal Planning

    WCDMA Final Design

    WCDMA RNP Principles and Procedures

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    4/45

    RNP Definition

    According to deployment and evolution requirements, aswell as cost-effectiveness consideration, generate the

    amount of Network Elements (NE), NE configuration, and

    Transmission design between different NE.

    Network Planning Scope Core networkfocus on CN element dimension

    and configuration.

    Radio networkfocus on RAN

    element dimension and configuration

    Transmission network

    focus on link dimension and

    configuration between network elements.

    RNSRNC

    RNSRNC

    Core Network

    Node B Node B Node B Node B

    Iu Iu

    IurIub IubIub Iub

    Definition & Scope

    WCDMA k l i

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    5/45

    WCDMA network planning

    solution WCDMA Radio network planning

    (NodeB/RNC)

    WCDMA Transmission network planning

    (Iu/Iur/Iub) WCDMA Core network planning (CS/PS

    domain)

    WCDMA RNP tools development

    U-NetHuawei

    Network KPI

    Pilot pollution

    Soft-handover ratio and probability

    Access probability of

    different services

    Best Server Distribution

    CE dimension

    Estimation result

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    6/45

    Objectives of network planning

    The RF Design of wireless system revolves four

    main principles. These principles are Coverage,

    Capacity, Quality and Cost. And further, adapt to

    the future network development and expansion.

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    7/45

    WCDMA RNP procedure

    overview

    Capacity

    Quality Coverage

    Interference

    Final design

    preparation

    Dimensioning Nominal Planning

    Site survey

    Deployment

    Detailed planning

    Preliminary design

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    8/45

    WCDMA RNP Overview

    WCDMA Radio Network Dimensioning

    WCDMA Preliminary Design

    WCDMA Cell Planning

    CONTENTS

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    9/45

    Input & Output

    Coveragerelated

    Coverage area

    Coverage

    probability

    Capacity related Traffic model

    Service model

    User density

    Quality related QoS

    requirements

    GoS

    requirements

    Demodulationthreshold

    System

    dimensioning Number of sites

    Systemconfiguration Sector structure

    Number of

    carriers

    Cost on networkconstruction

    Site cost

    Equipment cost

    Input Output

    Coverage design

    Capacity design

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    10/45

    WCDMA RNP Overview

    WCDMA Radio Network Dimensioning

    WCDMA Nominal Planning

    WCDMA Final Design

    CONTENTS

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    11/45

    Nominal Planning

    Based on the result of network dimension,

    preliminary design present Information oftheoretical sites including following :

    Site coordinates.

    Engineering parameters such as Antenna height,azimuths and tilts.

    Radio parameters such as scrambling code ,transmit

    power of different channels, etc.

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    12/45

    chart

    Radio

    Network

    Dimensioning

    Dimensioning

    Report

    Contract

    Initial sites

    choosing

    System

    simulation

    Target

    Size

    Phase No.

    Available sites

    information

    Site adjustment?

    Y

    N

    Bidding

    Document

    Sites importingPropagation

    model

    Nominal planning report

    (Including: search ring and

    Theoretical site specification)

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    13/45

    About simulation Unlike GSM network, in CDMA coverage and capacity are too

    inter-related to be predicted accurately, so we introduced Monte

    Carlo simulation to evaluate the performance of a radio network.

    EcEc/Iopilot pollution distribution

    Soft (softer) handover area analysis UE transmit power

    Eb/No, access successful rate of each service

    WCDMA simulation

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    14/45

    Simulation output

    Simulation output Pilot coverage (Ec, Ec/Io) in the

    target areas

    Best server plot

    Coverage probability distribution

    of each service Access failure distribution and

    statistic of each service

    Continuous coverage areas ofeach service

    Cell load distribution of downlinkand uplink

    Pilot pollution distribution

    Soft handover areas statistic ofeach service

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    15/45

    Preliminary design output

    Project background introduction

    Target areas information such as population, district division etc.

    Radio network solution: sites distribution plot, sites list etc.

    Performance summary based on the simulation result.

    Annex: simulation output

    In preliminary design stage, we choose initial sites, do network performance

    simulation, conduct adjustment according to the simulation result, until

    finally we get all performance requirements fulfilled, then we can output the

    with

    following contents:

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    16/45

    WCDMA RNP Overview

    WCDMA Radio Network Dimensioning

    WCDMA Nominal Planning

    WCDMA Final Design

    CONTENTS

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    17/45

    -chart

    Site list

    Radio network

    preliminary plan

    report

    New site or not2G site or not

    Output SearchRings

    Identifytheoreticalsite

    Confirm site

    conditions

    or not

    Site survey report

    Meet site

    requirements

    or not

    Yes

    Site survey

    No

    Yes

    Yes

    No

    Yes

    No

    No

    Noise test Noise test report

    Based on the preliminary design report,

    we conduct more detailed cell planning.

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    18/45

    For each theoretical site, a physical site will be acquired

    in this phase through following steps:

    Define search areas

    Site ranking

    Identify candidate sites

    Site acquisition

    Site Survey

    A suitable physical site

    Give adequate radio coverage.

    Have connectivity into the transmission network.

    Be aesthetically and politically acceptable to the local community.

    Have power nearby, good access and a co-operative owner.

    A3rd

    D1st

    C2ndB - Unsuitable

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    19/45

    Site Survey report The surveyor will prepare a report listing

    the options, and following items willincluded in the report:

    Accurate grid reference.

    Accurate height of structures or available antennawindows.

    Photographs of the site.

    360 panoramic photos from site or if obstructed

    from nearby location/structure.

    From site survey report, RNP engineers can derive

    appropriate site location, antenna type,height, azimuth, down tilt, etc.

    er ca on y sys em

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    20/45

    er ca on y sys emsimulation

    It is an iterative

    process to verifythe final design

    until all the

    requirements are

    fulfilled Coverage prediction

    RNP

    Planningresults

    Are

    Requirement

    s Fulfilled?

    Traffic distribution System simulation

    WCDMA RNP t t

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    21/45

    WCDMA RNP output

    LAC, RAC, SAC Plan

    Neighbor relation plan (intra-frequency, inter-

    frequency, and inter-system)

    Frequency plan

    Scrambling code plan

    Power allocation for each channel

    Handover parameters

    Access control parameters

    Other radio parameters

    After performance verification by simulation, we produce with more detailed contents. In order to guide the project

    implementation, the report should also include following items

    C

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    22/45

    WCDMA RNP summary

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    23/45

    Main Topics WCDMA RNP Principles and

    Procedures

    WCDMA RNO Principles andProcedures

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    24/45

    WCDMA RNO Principles and

    Procedures Brief Introduction

    Single Site Verification

    Radio Frequency Optimization Parameters Optimization

    Regular Testing & KPI Analysis

    e wor p m za on

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    25/45

    To enhance networkperformance

    --- e.g.

    coverage/accessibility/mobility

    To resolve specific issues

    --- e.g. interference/coverage To improve subscribers

    QoE

    --- e.g. service quality/drop

    e wor p m za onTarget

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    26/45

    Construction phaseTroubleshooting

    Booming phasePotential Seeking

    Mature phaseBalancing

    Time

    Subs.Number

    RF plan review

    Single site verification

    Pre-launch optimization

    KPI analysis ComplaintsDT & CQT

    Customized and

    differentiated

    services

    Billing strategies

    Drop call

    Congestion

    Poor quality

    Access failure

    RF adjustment

    Para. adjustment

    Maintenance and upgrade

    Network expansion

    .

    Investment

    Return

    Commerciallaunch

    Optimization throughout Life Cycle

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    27/45

    Network Optimization Phases

    RF optimization

    Y

    N

    N

    Y

    Single site verification

    80 sites in the

    cluster ready?

    Service test and

    parameter optimization

    Routine drive test andstats. analysis

    Acceptance criteriasatisfied?

    New site integrated

    Optimization

    preparation

    Acceptance

    w z

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    28/45

    w zPhasesSingle site verification

    To verify the functionality of new

    sites

    --- e.g. site installation, basic

    functions of the cell

    RF optimization To control interference & pilot

    pollution

    To optimize coverage & 3G

    neighbor lists

    Services test & para.optimization To assess network performance

    To optimize network parametersRegular route testing &

    stats. analysis To monitor & evaluate network

    performance

    To identify & solve new networkissues

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    29/45

    Brief Introduction

    Single Site Verification

    Radio Frequency Optimization Parameters Optimization

    Regular Testing & KPI Analysis

    WCDMA RNO Principles and

    Procedures

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    30/45

    Site Verification TargetTo verify cell coverage

    CPICH RSCP

    To investigate

    interference

    NodeB RTWP & CPICH Ec/Io

    To verify site

    installation

    e.g. PA/antenna/feeders issues

    Example: Site Verification

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    31/45

    An example Check list

    Example: Site Verification

    Checklist

    Single Site Verification Checklist

    Site expanded from:

    Site migrated from RNC:

    New site Expansion

    Site Connected to RNC:

    Idle mode

    Note: If the item is OK, mark the "" before it by "" otherwise, mark the"" by "". If the item is not check, mark the "" before it by "/".

    HSDPA 10 Normal function to access HSDPA

    Migration Others

    New Site:

    Site Expansion:

    Reminder

    Mapinfo Update

    Data Base Update

    To:

    To RNC:

    Site Name:

    Remarks

    CPICH_RSCP > 75 dBm near site

    Coverage DT 9 Check by DT whether the overall quality of service and cov

    Connected mode

    6

    Mobile originated and terminated calls of VP service

    8 Connection of PS services

    Mobile originated and terminated calls of voice services

    7

    CPICH_EcIo > 8 dB near site

    Site ID:

    No. Activity/Process

    Site Migration

    Others

    3 LAC/RAC data configuration

    1

    4

    2 Scramble configuration

    Frequency configuration

    5

    Remarks (further explanation):

    2-Name/Designation: Signature: Date:

    Reviewed by:

    1-Name/Designation: Signature: Date:

    X

    r nc p es an

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    32/45

    Brief Introduction

    Single Site Verification

    Radio Frequency Optimization Parameters Optimization

    Regular Testing & KPI Analysis

    r nc p es anProcedures

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    33/45

    RF Optimization Target

    To optimize coverage

    To minimize pilot

    pollution

    To optimize celldominance

    To o timize nei hbor cell

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    34/45

    RF Optimization ProcedureDrive test

    Identify RF issues

    Identify candidate

    cells for changes

    Identify nature of

    required changes

    Determine amount

    of changes

    Implement changes

    Repeat drive test

    Finished

    N

    Problem resolved?

    Y

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    35/45

    RF Parameters Optimization

    Engineering parameters

    adjustment To adjust antenna down tilt To adjust antenna azimuth

    To adjust antenna location

    To adjust antenna height

    To replace antenna

    To replace site

    To add new cell

    Radio part parameters

    adjustment To optimize neighbor cell list

    RF related Drop Calls

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    36/45

    RF-related Drop Calls

    Poor coverage

    High interference

    Poor UL coverage

    Poor dominance

    Pilot pollution

    Missing neighbors

    Problems

    Fast change of RF conditions usuallycauses drop calls, e.g. turning a corner.

    Poor RSCP & Ec/Io

    Poor Ec/Io or RTWP

    UE max Tx power

    many SHO events

    many cells present

    Appearance

    WCDMA RNO P i i l d

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    37/45

    Brief Introduction

    Single Site Verification

    Radio Frequency Optimization

    Parameters Optimization

    Regular Testing & KPI Analysis

    WCDMA RNO Principles and

    Procedures

    Para Optimization

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    38/45

    Para. OptimizationTarget

    To reduce access

    failures

    To reduce drop calls

    To enhance service

    quality

    Para. optimization

    is an important step

    after RF optimization

    Service quality and network resourcesutilization

    will be improved after para. optimization

    Parameters to be

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    39/45

    Parameters to beOptimized

    CCCH power allocationpara.

    RL maximum power

    para.

    Cell re-selection para.

    Intra-freq. handover

    para.

    Inter-RAT handover para.

    Power control para.

    Access power para.

    Other related para.

    The influence caused by the cell

    parameters adjustment shouldbe analyzed carefully.

    Seldom adjusted

    An effective way to

    reduce drop calls

    WCDMA RNO Principles and

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    40/45

    Brief Introduction

    Single Site Verification

    Radio Frequency Optimization Parameters Optimization

    Regular Testing & KPI Analysis

    WCDMA RNO Principles and

    Procedures

    Regular Drive Testing Target

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    41/45

    Regular Drive Testing Target

    To get benchmark of the

    performance of the networkand users experience

    To monitor the progress of

    on-going optimisationactivities

    To validate new features of

    the RAN To identify degradation in

    coverage and/or increase in

    interference

    call setup SR,

    call drop rate,PS throughputs

    As a result of increasedtraffic or changes inenvironment

    Routine drive tests should becarried out (e.g. on monthly)

    Routine Stats Analysis

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    42/45

    Routine Stats. Analysis

    Target

    To benchmark networkperformance

    To monitor traffic volumes &

    patterns To assess impact of

    parameter changes

    To identify poorlyperforming cells

    To provide triggers for

    network upgrade decisions

    ro ess ona p m za on

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    43/45

    MSC/SSP/VLR

    HLR/AC

    GMSC/SSP

    PSTNPLMNISDN

    iManagerTM M2000

    GENEXNastar

    GENEXAssistant

    GENEXProbe

    CN

    Node B

    Node B

    Node B

    RNC

    RNC

    Node B

    Node B

    Node BRNS

    RNS

    GENEX Probe

    AGILENT

    QUALCOMM

    HUAWEI RNC

    ro ess ona p m za onTools

    Performance/alarms

    /configurations/

    engineering para.Capture test data

    AnalysisResult

    sharing

    RAN autoconfigurationconsole

    Summary

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    44/45

    Summary

    UMTS NetworkOptimization

    To provide a more competitive

    network for OperatorTo provide better quality of

    experience for Subscribers

    Trade-off between optimized

    coverage, capacity, quality

    Ongoing optimization acrossnetwork life cycle

  • 7/29/2019 11 Wcdma Rnp&Rno Conspectus

    45/45