11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project •...

23
20-11-2015 1 Claus Iversen 2008 – til i dag, Construction Manager, D&R and Marine Works, Femern A/S 2005 – 2008 Construction Manager, Bosphorus, Istanbul, The Marmaray Project, Immersed Tunnel 1995 – 2001 Contract Director, D&R Øresundskonsortiet, DK 1975 – 1995, Danish Hydraulic Institute Marine Works CIV 2 10. september 2015

Transcript of 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project •...

Page 1: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

1

Claus Iversen

2008 – til i dag, Construction Manager, D&R and Marine Works, Femern A/S

2005 – 2008 Construction Manager, Bosphorus, Istanbul, The Marmaray Project, Immersed Tunnel

1995 – 2001 Contract Director, D&RØresundskonsortiet, DK

1975 – 1995, Danish Hydraulic InstituteMarine Works

CIV 210. september 2015

Page 2: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

2

CIV

CIV

Page 3: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

3

Øresund tunnelfabrikNordhavn, København

10. september 20155

10. september 2015CIV

Page 4: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

4

10. september 2015CIV

The Marmaray Project

• Total length of CR-Project app. 77 km:– At grade, European side 19.6 km – At grade, Asian side 43.4 km– Bored tunnels 12.2 km– Immersed tube tunnel 1.4 km

10. september 2015CIV 8From Halkali to Gebze

Page 5: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

5

The Background (1860)

10. september 2015CIV 9

Gravet ned i havbunden

10. september 2015CIV 10

Page 6: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

6

Dredging Works

CIV 11

Contaminated soil: 120.000 m3 Clean soil: 1.000.000 m3

Stone backfill: 130.000 m3 Soil backfill: 800.000 m3

Immersed Tunnel Yard

10. september 2015CIV 12

Page 7: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

7

Tuzla Construction Yard

10. september 2015CIV 13

Page 8: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

8

Page 9: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

9

10. september 2015CIV 17

Page 10: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

10

Elements, today, E4 – E1

10. september 2015CIV 20

Page 11: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

11

Bosphorus, Marine Works

10. september 2015CIV 22

Page 12: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

12

Page 13: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

13

Nedsænket på et tunnelfundament

10. september 2015CIV 25

Tunnelfundament

CIV10. september 2015

26

Page 14: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

14

Bosphorus, Marine Works

10. september 2015CIV 27

Page 15: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

15

Immersion Barge

10. september 2015CIV 29

CIV 30

Preparing element for immersion

10. september 2015

Page 16: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

16

Sænkning af elementer

CIV10. september 2015

31

Monteringsudstyr oven på elementerne

CIV 3210. september 2015

Page 17: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

17

Sammenkobling mellem tunnelelement ogsænkepram

CIV10. september 2015

33

Indvendigt udstyr i elementerne

CIV10. september 2015

34

Page 18: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

18

Inside Element 7, today

10. september 2015CIV 35

Tunnelelement klart til nedsænkning

CIV10. september 2015

36

Page 19: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

19

CIV

Wirer så tykke som håndled

Udstyr i kontrolrummet

CIV 3810. september 2015

Page 20: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

20

10. september 2015CIV

Tunnelportal og ramper

40

Page 21: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

21

10. september 2015CIV 41

10. september 2015CIV 42

Page 22: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

22

10. september 2015CIV 43

Page 23: 11-Dansk Betondag CIV 2015. 11. 21. · 20-11-2015 4 CIV 10. september 2015 The Marmaray Project • Total length of CR-Project app. 77 km: – At grade, European side 19.6 km –

20-11-2015

23