11 a Type of Well Completions
-
Upload
heris-sitompul -
Category
Documents
-
view
257 -
download
9
Transcript of 11 a Type of Well Completions
-
7/31/2019 11 a Type of Well Completions
1/14
Copyright 2007, , All rights reserved
WELL COMPLETION
-
7/31/2019 11 a Type of Well Completions
2/14
Copyright 2007, , All rights reserved
SINGLE COMPLETION WITH CEMENTED AND PERFORATEDCASING
PerforatedInterval
ProductionCasing
SurfaceCasing
Packer
RESERVOIR
Tubing
-
7/31/2019 11 a Type of Well Completions
3/14
Copyright 2007, , All rights reserved
COMPLETION WITH CEMENTED AND PERFORATEDCASING
Advantage:
Selective production Zonal Isolation Water/Gas Shut -off
Disadvantage:
Extra cost (casing and cement, perforation) Formation Damage
Application: Consolidated formation. Multi reservoirs with different pressures.
When dual Completions are required
-
7/31/2019 11 a Type of Well Completions
4/14
Copyright 2007, , All rights reserved
OPEN HOLECOMPLETION
RESERVOIR
ProductionCasing
SurfaceCasing
Packer
Tubing
-
7/31/2019 11 a Type of Well Completions
5/14
Copyright 2007, , All rights reserved
OPEN HOLECOMPLETION
Advantage: Simple Saving in cost and time
Disadvantage: No selective control Difficult to isolate water or gas Breakthrough Cross flow can not be controlled Not suitable for unstable Formation
Application: Low cost/multi well developments Deep consolidated wells. Naturally Fractured reservoirs.
-
7/31/2019 11 a Type of Well Completions
6/14
-
7/31/2019 11 a Type of Well Completions
7/14Copyright 2007, , All rights reserved
OPEN HOLE COMPLETION WITHSLOTTED, PERFORATED OR SCREEN
LINER
Advantage: Simple Cheeper than cemented casing Sand control
Disadvantage:
No selective control Difficult to isolate water or gas Breakthrough Cross flow can not be controlled
Not suitable for unstable Formation
Application:
Sandy wells (stable formation) Horizontal wells completion.
-
7/31/2019 11 a Type of Well Completions
8/14Copyright 2007, , All rights reserved
OPEN HOLE GRAVEL PACK COMPLETION
RESERVOIR
PACKER
LINER HANGER
SURFACECASING
TUBING
PRODUCTIONCASING
SLOTTED,PERFORATED ORSCREEN LINERGRAVEL PACK
-
7/31/2019 11 a Type of Well Completions
9/14Copyright 2007, , All rights reserved
OPEN HOLE GRAVEL PACK COMPLETIONWITH UNDERREAMED HOLE
RESERVOIR
Tubing
Production Casing
Packer
Slotted, Perforatedor Screen Liner
Liner Hanger
Gravel
Underreamed hole
-
7/31/2019 11 a Type of Well Completions
10/14Copyright 2007, , All rights reserved
INSIDE CASING GRAVEL PACK COMPLETION
RESERVOIR
Tubing
Production Casing
Packer
Slotted, Perforatedor Screen Liner
Liner Hanger
Gravel
Perforations
-
7/31/2019 11 a Type of Well Completions
11/14Copyright 2007, , All rights reserved
FRAC AND PACK COMPLETION
RESERVOIR
Tubing
Production Casing
Packer
Slotted, Perforatedor Screen Liner
Liner Hanger
Gravel
Perforations
Hydraulic Fracture
-
7/31/2019 11 a Type of Well Completions
12/14Copyright 2007, , All rights reserved
UNDERREAMED CASING GRAVEL PACKCOMPLETION
RESERVOIR
Tubing
Production Casing
Packer
Slotted, Perforatedor Screen Liner
Gravel
Underreamed Casing/Hole
-
7/31/2019 11 a Type of Well Completions
13/14Copyright 2007, , All rights reserved
SELECTIVE COMPLETION
ZONE 3
ZONE 2
ZONE 1
SLIDING SLEEVES
-
7/31/2019 11 a Type of Well Completions
14/14Copyright 2007 All rights reserved
Producing a Zone between Packers
Top Packer
Bottom PackerPerforatedInterval
Sliding Sleeve
OPEN CLOSED
Anim. 1Anim 2
http://localhost/var/www/apps/conversion/current/tmp/scratch4479/Model%20L%20Packer.exehttp://localhost/var/www/apps/conversion/current/tmp/scratch4479/HYDRO%206_v2.exehttp://localhost/var/www/apps/conversion/current/tmp/scratch4479/HYDRO%206_v2.exehttp://localhost/var/www/apps/conversion/current/tmp/scratch4479/Model%20L%20Packer.exe