105312 MRB MANUAL_01152008.pdf

334
Manufacturing Record Book Deionization Package Unit Manufacturing Record Book A-B14-TOL-MEE-7510-0902 MRB Cover Page Project Number 105312 Date: 15-JAN-2008, Rev.: A 309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com MANUFACTURING RECORD BOOK FOR MODEL FD401-4-2 WATERMAKER Tombua Landana Project – CABGOC Block 14 Angola Daewoo Shipbuilding & Marine Engineering Co. Ltd. Potable Water Makers; Chlorine Injection Unit Purchase Order Number 4000310118 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312 Document Number: 52 Client Document Number: A-B14-TOL-MEE-7510-0902 SDRL Code: R04/R05 MRB Manual

description

water maker drawing

Transcript of 105312 MRB MANUAL_01152008.pdf

Manufacturing Record Book Deionization Package Unit

MANUFACTURING RECORD BOOK FOR MODEL FD401-4-2 WATERMAKER

Tombua Landana Project CABGOC Block 14 Angola Daewoo Shipbuilding & Marine Engineering Co. Ltd. Potable Water Makers; Chlorine Injection Unit Purchase Order Number 4000310118 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number: 52 Client Document Number: A-B14-TOL-MEE-7510-0902 SDRL Code: R04/R05 MRB Manual

Manufacturing Record Book A-B14-TOL-MEE-7510-0902 MRB Cover Page Project Number 105312 Date: 15-JAN-2008, Rev.: A

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Manufacturing Record Book Deionization Package Unit

Project: Contractor: PO#: Desc.:

Tombua Landana Cabgoc Block 14 Angola DSME 400031018 Potable Watermakers with Turbine Wash Water Polisher

INDEXItem01 02 05A 05B 06A 06B 07A 07B 08 09 10 11 12 13 14 15 16 17 18 19 20 21A 21B 22 23 24 25 26 27 28 29

Section DescriptionSupplier Document Schedule (SDS) Fabrication Production Schedule General Arrangement Drawing Water makers 105312-01 General Arrangement Drawing Chlorine Inj. Unit 10531202 P&ID Water makers (Pg 1/2, 2/2) 105312-21-1/2 P&ID Chlorine Injection Unit (Pg 1/1) 105312-22 Schematic Diagrams Water makers 105312-11 Schematic Diagrams Chlorine Injection Unit 105312-12 Utilities Schedule Weight Data Sheets Equipment Data Sheets Noise Level Data Sheets Schedule Elec. Equipment in Hazardous Area Detailed Description of Operation Instrument Index Instrument Data Sheets (Format INTools) Cause & Effect Chart PLC Logic Diagram Bill of Materials Limited to Parts Designation Table in IOM Cross Sect/Exploded View Drawing (Pump Only) Catalog Data (Major Components & Instrument) Electrical Panel Layout Drawing Water makers 105312-10 Electrical Panel Layout Drawing Chlorine Inj. Unit 105312-13 Termination Diagram REFER TO SDRL C03 Motor Performance Curves Installation Procedures Preservation Procedures Handling and Shipping Procedures Pre-Commissioning/Commissioning Procedures (Included in IOM SDRL R02/03) Quality Management System Certification (ISO 9001 Certificate) Inspection & Test Plan309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Section01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Manufacturing Record Book A-B14-TOL-MEE-7510-0902 MRB Index Project Number 106372 Date: 15-JAN-08, Rev.: A Page 1 of 2

Manufacturing Record Book Deionization Package Unit

Manufacturing Record Book Model FD401-4-2 Watermaker

INDEX CONTINUED30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 53 Pressure Test Procedures INCLUDED IN SDRL H05 Inspection & Test Procedure (Including FAT) Lube Oil & Operating Fluids Schedule Priced Recommended Start Up/Commissioning Spares Priced Recommended Two Year Operating Spares Factory Acceptance Test Report Weighing Report Dimensional Report Material Test Certs. (MTRs Frame & Membrane Housing) Welder Performance Qualification Certificates NDE Records/Reports Routine Test Certificates Electrical Machinery (Motors) Painting/Insulation Inspection Report Dimensional Reports Certificate of Compliance Release Note(s) Material Safety Data Sheets (MSDS) WPS/WPQRs Non Destructive Exam Procedures Surface Preparation & Painting Procedures Dispatch Dossier IOM Manual (CTreat Standard) ISSUED AS SEPARATE VOLUME Instrument Calibration or Set Point Cert. (AI, PSL, PSV, PI only) 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54

Manufacturing Record Book A-B14-TOL-MEE-7510-0902 MRB Index Project Number 106372 Date: 15-JAN-08, Rev.: A Page 2 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 01 CABGOC Document Number: A-B14-TOL-MEE-7510-0008 SDRL Code: A01 Document Schedule (SDS)

0 ARev No

12/14/06 10/05/06

Revised Per Comments For Information

SLY SLY

RT RT

-

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 01 Document Schedule (SDS) Project Number 105312 Date: 14-Dec-06 Rev.: 0 Page 1 of 3

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Document RegisterProject: Buyer: Buyer's P.O. No.: Project No.: Equipment Desc.: Tag No.: PO Pkg No: TOMBUA LANDANA PROJECT - CABGOC BLOCK 14 ANGOLA DSME 400031018 105312 POTABLE WATERMAKERS W/ TURBINE WASH WATER POLISHER ME-7510/7511; ZZZ-6700 ME-220 Document No.: Rev: CODE 1: CODE 2: CODE 3: CODE 4: CODE 5: C'treat Document No. Client Document No. A-B14-TOL-MEE-7510-0008 First Submittal Due (weeks ARO) 2 First Submittal Due (date) 27-Sep-06 01 0 Date: 15-Jan-08

ACCEPTED ACCEPTED AS NOTED. PROCEED WITH WORK, INCORPORATE COMMENTS, AND RESUBMIT NOT ACCEPTED. WORK MAY NOT PROCEED. REVISE AND RESUBMIT. RECEIPT NOTED. NO SIGNATURE REQUIRED. CERTIFIED (AS BUILT DRAWINGS) Doc Returned Date 31-Oct-06 28-Dec-06 7-Dec-06 16-Jan-07 Approval Status 2 1 2 4For Construction

ITEM

Ref. #

SDRL CODE

Document Title Supplier Document Schedule (SDS)

Date Submitted 5-Oct-06 15-Dec-06

Rev. No. A 0 A B 0 0 0 0 0 0 A A 0 1 A 0 1 A B 0 1 2 A B 0 1

Re-Submittal Due (date)

1

A01

2

A02

Fabrication Production Schedule

A-B14-TOL-MEE-7510-0010

2

27-Sep-06

9-Oct-06 14-Dec-06 7-Feb-07

28-Dec-06

3

A03

Progress Reports (Due every 4 Wks)

A-B14-TOL-MEE-7510-0002

4

11-Oct-06

10-Jan-07 31-Jan-07 16-Feb-07 28-Feb-07 16-Mar-07

26-Feb-07

4

4 5A

A05 B01

Table of Contents (all manuals) General Arrangement Drawing - Watermakers 105312-01

A-B14-TOL-MEE-7510-0003 D-B14-TOL-MEE-7510-0011

12 3

6-Dec-06 4-Oct-06

19-Sep-07 4-Oct-06 12/14/2006 12/18/06 15-Jan-08

9-Nov-06 10-Jan-07

2 1

30-Nov-06

5B

B01

General Arrangement Drawing - Chlorine Inj. Unit 105312-02

D-B14-TOL-ZZZ-6700-0012

3

4-Oct-06

4-Oct-06 18-Dec-06 7-May-07

9-Nov-06 10-Jan-07 22-May-07 9-Nov-06 28-Dec-06 7-Mar-07 22-May-07

2 1 1 2 2 2 1

30-Nov-06

FINAL AS-BUILT

6A

C01

P&ID - Potable Watermakers (Pg 1/2, 2/2)

105312-21-1 / 2

D-B14-TOL-MEE-7510-0013

3

4-Oct-06

4-Oct-06 11-Dec-06 12-Feb-07 9-May-07 15-Jan-08

30-Nov-06 18-Jan-07 30-Mar-07FINAL AS-BUILT

6B

C01

P&ID - Chlorine Injection Unit (Pg 1/1)

105312-22

D-B14-TOL-MEE-7510-0014

3

4-Oct-06

4-Oct-06 11-Dec-06 12-Feb-07 9-May-07

9-Nov-06 29-Dec-06 7-Mar-07 22-May-07

2 2 2 2

30-Nov-06 18-Jan-07 30-Mar-07FINAL AS-BUILT 13-JUN-07

T- Prior to Completion/Inspection/Tesing in weeks. T+ Post Completion/Inspection/Testing in weeks. D- Prior to Dispatch in weeks.

1 of 4

G:\Netshare2\Ctreat\Projects\2 - Active Projects\105312 ChevronTexaco Tombua Landana - KBR\Vendor Data\01 - Document Register - R0_01152008.xls

Document RegisterProject: Buyer: Buyer's P.O. No.: Project No.: Equipment Desc.: Tag No.: PO Pkg No: TOMBUA LANDANA PROJECT - CABGOC BLOCK 14 ANGOLA DSME 400031018 105312 POTABLE WATERMAKERS W/ TURBINE WASH WATER POLISHER ME-7510/7511; ZZZ-6700 ME-220 Document No.: Rev: CODE 1: CODE 2: CODE 3: CODE 4: CODE 5: C'treat Document No. Client Document No. First Submittal Due (weeks ARO) First Submittal Due (date) 01 0 Date: 15-Jan-08

ACCEPTED ACCEPTED AS NOTED. PROCEED WITH WORK, INCORPORATE COMMENTS, AND RESUBMIT NOT ACCEPTED. WORK MAY NOT PROCEED. REVISE AND RESUBMIT. RECEIPT NOTED. NO SIGNATURE REQUIRED. CERTIFIED (AS BUILT DRAWINGS) Doc Returned Date 7-Jun-06 5-Dec-06 5-Feb-07 7-Mar-07 18-Sep-07 5-Dec-06 5-Feb-07 18-Sep-07 Approval Status 1 3 2 2 1 2 1 1 27-Dec-06 26-Feb-07 30-Mar-07FINAL AS-BUILT

ITEM

Ref. #

SDRL CODE

Document Title

Date Submitted

Rev. No.

Re-Submittal Due (date)

20-Jun-07 7A C03 Schematic Diagrams - Watermaker 105312-11 D-B14-TOL-MEE-7510-0016 6 25-Oct-06 3-Nov-06 12-Jan-07 12-Feb-07 28-Aug-07 7B C03 Schematic Diagrams - Chlorine Injection Unit 105312-12 D-B14-TOL-ZZZ-6700-0015 6 25-Oct-06 3-Nov-06 15-Jan-07 28-Aug-07 15-Jan-08 8 C04 Utilities Schedule A-B14-TOL-MEE-7510-0200 3 4-Oct-06 4-Oct-06 14-Dec-06 9 C05 Weight Data Sheets A-B14-TOL-MEE-7510-0100 3 4-Oct-06 4-Oct-06 18-Dec-06 10 C06 Equipment Data Sheets A-B14-TOL-MEE-7510-0101 4 11-Oct-06 24-Oct-06 19-Dec-06 12-Feb-07 7-May-07 20-Jun-07 11 C07 Noise Level Data Sheets A-B14-TOL-MEE-7510-0102 4 11-Oct-06 24-Oct-06 19-Dec-06 12 13 C08 C09 Schedule Elec. Equipment in Hazardous Area Detailed Description of Operation A-B14-TOL-MEE-7510-0021 A-B14-TOL-MEE-7510-0022 10 10 22-Nov-06 22-Nov-06 20-Feb-07 12-Feb-07 7-May-07 14 C14 Instrument Index A-B14-TOL-MEE-7510-0103 4 11-Oct-06 12-Feb-07 7-May-07 20-Jun-07 15 16 C15 C16 Instrument Data Sheets (Format INTools) Cause & Effect Chart A-B14-TOL-MEE-7510-0105 B-B14-TOL-MEE-7510-0500 8 8 8-Nov-06 8-Nov-06 12-Mar-07 20-Feb-07 24-Aug-07 17 C17 PLC Logic Diagram A-B14-TOL-MEE-7510-0023 T+2 24-Aug-07

2 A B 0 1 A 0 0 1 A 0 A 0 A B 0 1 2 A 0 A A 0 A 0 1 A A 0 0

27-Dec-06

9-Nov-06 28-Dec-06 9-Nov-06 10-Jan-07 10-Nov-06 10-Jan-07 7-Mar-07 22-May-07 6-Jul-07 10-Nov-06 10-Jan-07 9-Mar-07 7-Mar-09 22-May-07 7-Mar-07 22-May-07 6-Jul-07

2 1 2 1 2 2 2 2 1 2 1 1 2 1 2 2 1

30-Nov-06

30-Nov-06

1-Dec-06 31-Jan-07 30-Mar-07 13-Jun-07

1-Dec-06

30-Mar-07

30-Mar-07 13-Jun-07

9-Mar-07

2

4-Apr-07

T- Prior to Completion/Inspection/Tesing in weeks. T+ Post Completion/Inspection/Testing in weeks. D- Prior to Dispatch in weeks.

2 of 4

G:\Netshare2\Ctreat\Projects\2 - Active Projects\105312 ChevronTexaco Tombua Landana - KBR\Vendor Data\01 - Document Register - R0_01152008.xls

Document RegisterProject: Buyer: Buyer's P.O. No.: Project No.: Equipment Desc.: Tag No.: PO Pkg No: TOMBUA LANDANA PROJECT - CABGOC BLOCK 14 ANGOLA DSME 400031018 105312 POTABLE WATERMAKERS W/ TURBINE WASH WATER POLISHER ME-7510/7511; ZZZ-6700 ME-220 Document No.: Rev: CODE 1: CODE 2: CODE 3: CODE 4: CODE 5: C'treat Document No. Client Document No. A-B14-TOL-MEE-7510-0104 A-B14-TOL-MEE-7510-0012 A-B14-TOL-MEE-7510-0004 First Submittal Due (weeks ARO) T+2 12 8 6-Dec-06 8-Nov-06 First Submittal Due (date) 01 0 Date: 15-Jan-08

ACCEPTED ACCEPTED AS NOTED. PROCEED WITH WORK, INCORPORATE COMMENTS, AND RESUBMIT NOT ACCEPTED. WORK MAY NOT PROCEED. REVISE AND RESUBMIT. RECEIPT NOTED. NO SIGNATURE REQUIRED. CERTIFIED (AS BUILT DRAWINGS) Doc Returned Date Approval Status Re-Submittal Due (date)

ITEM

Ref. #

SDRL CODE

Document Title Bill of Materials- Limited to Parts Designation Table in IOM Cross Sect/Expl View Dwg (Pump only) Catalog Data (major components & instrument)

Date Submitted 19-Sep-07 12-Feb-07 19-Dec-06 12-Feb-07

Rev. No. A A A 0 A A

18 19 20

C20 D01 D07

7-Mar-07 10-Jan-07 7-Mar-07 18-Sep-07 18-Sep-07

1 2 4 1 1 31-Jan-07

21A 21B 22 23 24

E02 E02 E03 F28 G01

Elec. Panel Layout Drawing - Watermakers Elec. Panel Layout Drawing - Chlorine Inj. Unit Termination Diagram Motor Performance Curves Installation Procedures

105312-10 105312-13

D-B14-TOL-MEE-7510-0017 D-B14-TOL-ZZZ-6700-0018 Refer to SDRL C03 A-B14-TOL-MEE-7510-0501 A-B14-TOL-MEE-7510-0600

Per C'treat email 12/8/06 Per C'treat email 12/8/06 10 12 12

5-Jan-07 5-Jan-07 22-Nov-06 6-Dec-06 6-Dec-06

28-Aug-07 28-Aug-07

7-Feb-07 12-Feb-07 20-Jun-07

A A 0 A 0 A 0 A A A B 0

20-Feb-07 21-Feb-07 9-Jul-07 26-Feb-07 9-Jul-07 21-Feb-07 9-Jul-07 21-Feb-07

4 2 1 2 1 2 1 4 14-Mar-07 19-Mar-07 14-Mar-07

25

G02

Preservation Procedures

A-B14-TOL-MEE-7510-0601

12

6-Dec-06

7-Feb-07 20-Jun-07

26

G03

Handling & Shipping Procedures

A-B14-TOL-MEE-7510-0602

12

6-Dec-06

12-Feb-07 20-Jun-07

27 28 29

G04 H01 H03

Pre-Commissioning/Commissioning Procedures (Inlcuded in IOM- SDRL R02/03) Quality Management System Certification/ (ISO 9001 Certificate) Inspection & Test Plan

A-B14-TOL-MEE-7510-0603 A-B14-TOL-MEE-7510-0800 A-B14-TOL-MEE-7510-0801

12 10 3

6-Dec-06 22-Nov-06 4-Oct-06

12-Feb-07 21-Nov-06 4-Oct-06 18-Dec-06 7-May-07

19-Apr-07 31-May-07

2 1

10-May-07

30 31

H04 H05

Pressure Test Procedures Inspection & Test Procedure (including FAT)

Included in SDRL H05 A-B14-TOL-MEE-7510-0605

3 8

4-Oct-06 8-Nov-06 5-Oct-06 14-Dec-06 7-Feb-07 20-Jun-07 A 0 1 2 A A 19-Oct-06 2-Jan-07 26-Feb-07 9-Jul-07 21-Feb-07 21-Feb-07 2 2 2 1 4 4 21-Jan-07 19-Mar-07

32 33

J01 J02

Lube Oil & Operating Fluids Schedule Priced Recommended Start Up/Commissioning Spares

A-B14-TOL-MEE-7510-0201 B-B14-TOL-MEE-7510-0700

12 8

6-Dec-06 8-Nov-06

12-Feb-07 13-Feb-07

T- Prior to Completion/Inspection/Tesing in weeks. T+ Post Completion/Inspection/Testing in weeks. D- Prior to Dispatch in weeks.

3 of 4

G:\Netshare2\Ctreat\Projects\2 - Active Projects\105312 ChevronTexaco Tombua Landana - KBR\Vendor Data\01 - Document Register - R0_01152008.xls

Document RegisterProject: Buyer: Buyer's P.O. No.: Project No.: Equipment Desc.: Tag No.: PO Pkg No: TOMBUA LANDANA PROJECT - CABGOC BLOCK 14 ANGOLA DSME 400031018 105312 POTABLE WATERMAKERS W/ TURBINE WASH WATER POLISHER ME-7510/7511; ZZZ-6700 ME-220 Document No.: Rev: CODE 1: CODE 2: CODE 3: CODE 4: CODE 5: C'treat Document No. Client Document No. B-B14-TOL-MEE-7510-0701 A-B14-TOL-MEE-7510-0802 A-B14-TOL-MEE-7510-0803 A-B14-TOL-MEE-7510-0804 A-B14-TOL-MEE-7510-0805 A-B14-TOL-MEE-7510-0806 A-B14-TOL-MEE-7510-0807 A-B14-TOL-MEE-7510-0813 A-B14-TOL-MEE-7510-0808 Refer to SDRL K06 A-B14-TOL-MEE-7510-0809 A-B14-TOL-MEE-7510-0810 A-B14-TOL-MEE-7510-0811 A-B14-TOL-MEE-7510-0812 First Submittal Due (weeks ARO) 8 T+2 T+2 T+2 D+2 T+2 T+2 T+2 D-1 T+2 D D D 4 11-Oct-06 15-Jan-08 15-Jan-08 15-Jan-08 9-Oct-06 14-Dec-06 48 P02 0 0 0 A 0 A 0 A 0 0 0 A 1 A 31-May-07 4 7-Dec-06 16-Jan-07 7-Dec-06 16-Jan-07 7-Dec-06 16-Jan-07 26-Feb-07 2 1 2 1 2 2 1 28-Dec-06 6-Feb-07 28-Dec-06 28-Dec-06 First Submittal Due (date) 8-Nov-06 01 0 Date: 15-Jan-08

ACCEPTED ACCEPTED AS NOTED. PROCEED WITH WORK, INCORPORATE COMMENTS, AND RESUBMIT NOT ACCEPTED. WORK MAY NOT PROCEED. REVISE AND RESUBMIT. RECEIPT NOTED. NO SIGNATURE REQUIRED. CERTIFIED (AS BUILT DRAWINGS) Doc Returned Date 21-Feb-07 Approval Status 4 Re-Submittal Due (date)

ITEM

Ref. #

SDRL CODE

Document Title

Date Submitted

Rev. No.

34 35 36 37 38 39 40 41 42 43 44 45 46 47

J03 K02 K05 K06 L01 L02 L05 L10 L12 L13 N06 N07 N10 P01

Priced Recommended Two Year Operating Spares Factory Acceptance Test Report Weighing Report Dimensional Report Material Test Certs. (MTRs - Frame & membrane housing) Welder Performance Qualification Certs. NDE Records/Reports Routine Test Cert. - Elec. Machinery (Motors) Painting/Insulation Inspection Report Dimensional Reports Certificate of Compliance Release Note(s)

13-Feb-07 30-Mar-07 15-Jan-08 15-Jan-08 24-Aug-07 14-Dec-06 24-Aug-07 24-Aug-07 24-Aug-07

A A 0 0 0 A 0 A 0

16-Jan-07

1

Material Safety Data Sheets (MSDS) WPS/WPQR's Non Destructive Exam Procedures

A-B14-TOL-MEE-7510-0607

4

11-Oct-06

9-Oct-06 14-Dec-06

49

P04

Surface Preparation & Painting Procedures

A-B14-TOL-MEE-7510-0608

4

11-Oct-06

9-Oct-06 14-Dec-06 7-Feb-07

50 51 52 53

R01

Dispatch Dossier

A-B14-TOL-MEE-7510-0900 A-B14-TOL-MEE-7510-0901 A-B14-TOL-MEE-7510-0902 A-B14-TOL-MEE-7510-0814

D D+4 D+4 T+1

15-Jan-08 19-Sep-07 15-Jan-08 30-Apr-07

R02/ R03 IOM Manual (C'treat Standard)

Manufacturing Records Book (MRB) R04/R05 (C'treat Std.)N02

Instrument Calibration or Set Point Cert. (AI, PSL, PSV, PI only)

Notes: 1. Doc No./item 53 added per PIM agreement on 12/11/06

T- Prior to Completion/Inspection/Tesing in weeks. T+ Post Completion/Inspection/Testing in weeks. D- Prior to Dispatch in weeks.

4 of 4

G:\Netshare2\Ctreat\Projects\2 - Active Projects\105312 ChevronTexaco Tombua Landana - KBR\Vendor Data\01 - Document Register - R0_01152008.xls

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No: 4000310118 Equipment Tag No: ME-7510/7511; ZZZ-6700 PO Pkg No: ME-220 C'treat Project Number 105312

Document Number 02 CABGOC Document No: A-B14-TOL-MEE-7510-0010 SDRL Code: A02 Fabrication Production Schedule

0 B ARev No

2/7/07 12/14/06 10/09/06

For Construction Revise cover page per comments For Information

RT RT RT

GS

GS

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 02 Fabrication Production Schedule Project Number 105312 Date: 7-Feb-07 Rev.: 0 Page 1 of 3

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC - Tombua Landana Contract No. 4000310118 Project No. 105312 - Watermaker and Chlorine Injection Unit Production Schedule Activity Name Start Date Finish Date Aug '06 27 3 Sept '06 10 17 24 1 8 Oct '06 15 22 29 5 Nov '06 12 19 26 3 Dec '06 10

1 ENGINEERING 2 3 4 5 6 PROCUREMENT 7 8 9Frame Fabrication Frame Painting Motors 10/25/06 11/29/06 11/30/06 12/11/06 11/1/06 12/26/06 11/1/06 11/1/06 11/15/06 11/1/06 11/1/06 12/6/06 12/6/06 12/6/06 12/1/06 12/6/06 Prepare Drawings/Data Vendor Data Approval Resolve Comments 9/20/06 11/22/06 10/4/06 12/6/06 10/18/06 11/15/06

10 Pumps 11 Tanks 12Piping

13 Instruments 14 Electrical 15 16 ASSEMBLY 17 Set Equipment 18 Piping 19 Wire Control Box 20 21 22 TESTING 23 Check-Out 24 25 26 SHIPPING PREP. 27 Drain and Package 28 29 30 DELIVERYStorage Factory Test (FAT) Instrument/Electrical

12/12/06 12/15/06 1/3/07 1/26/07

1/5/07 1/19/07 1/31/07 2/9/07

2/12/07 2/16/07

2/15/07 2/16/07

2/19/07 2/21/07

2/21/07TBD

TBD

BY 9/30/07

27

3

10

17

24

1

8

15

22

29

5

12

19

26

3

10

CABGOC DOC NO: A-B14-TOL-MEE-7510-0010, REV. 0

Page 2 of 3

CABGOC - Tombua Landana Contract No. 4000310118 Project No. 105312 - Watermaker and Chlorine Injection Unit Production Schedule Activity Name Start Date Finish Date Dec '06 17 24 31 7 Jan '07 14 21 28 4 Feb '07 11 18 25

1 ENGINEERING 2 3 4 5 6 PROCUREMENT 7 8 9Frame Fabrication Frame Painting Motors 10/25/06 11/29/06 11/30/06 12/11/06 11/1/06 12/26/06 11/1/06 11/1/06 11/15/06 11/1/06 11/1/06 12/6/06 12/6/06 12/6/06 12/1/06 12/6/06 Prepare Drawings/Data Vendor Data Approval Resolve Comments 9/20/06 11/22/06 10/4/06 12/6/06 10/18/06 11/15/06

10 Pumps 11 Tanks 12Piping

13 Instruments 14 Electrical 15 16 ASSEMBLY 17 Set Equipment 18 Piping 19 Wire Control Box 20 21 22 TESTING 23 Check-Out 24 25 26 SHIPPING PREP. 27 Drain and Package 28 29 30 DELIVERYStorage Factory Test (FAT) Instrument/Electrical

12/12/06 12/15/06 1/3/07 1/26/07

1/5/07 1/19/07 1/31/07 2/9/07

2/12/07 2/16/07

2/15/07 2/16/07

2/19/07 2/21/07

2/21/07TBD

TBD

BY 9/30/07

17CABGOC DOC NO.: A-B14-TOL-MEE-7510-0010, REV. 0

24

31

7

14

21

28

4

11

18

25

Page 3 of 3

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 05A CABGOC Document Number: D-B14-TOL-MEE-7510-0011 SDRL Code: B01 General Arrangement Drawing Watermakers

1 0 ARev No

01/15/08 12/14/06 10/04/06

AS-BUILT Revised per Comments For Information

SLY SLY SLY

RT RT -

RT RT RT

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 05A General Arrangement - Watermaker Project Number 105312 Date: 15-JAN-08 Rev.: 1 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 05B CABGOC Document Number: D-B14-TOL-MEE-6700-0012 SDRL Code: B01 General Arrangement Drawing Chlorine Injection Unit

1 0 ARev No

05/07/07 12/18/06 10/04/06

Final-as-Built Revised per Comments For Information

SLY SLY SLY

RT RT -

RT RT RT

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 05B General Arrangement Chlorine Injection Unit Project Number 105312 Date: 07-May-07 Rev.: 1 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 06A CABGOC Document Number: D-B14-TOL-MEE-7510-0013 SDRL Code: C01 P&ID Watermaker (Pg 1/2, 2/2)

2 1 0 B ARev No

01/15/08 05/09/07 02/12/07 12/11/06 10/04/06

For your Information Final-as-Built Revised per Comments Revised per Comments For Information

SLY SLY SLY SLY SLY

RT RT RT RT -

RT RT RT RT RT

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 06A P & ID Watermaker (Pg1/2, 2/2) Project Number 105312 Date: 15-JAN-08 Rev.: 2 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 06B CABGOC Document Number: D-B14-TOL-MEE-7510-0014 SDRL Code: C01 P&ID Chlorine Injection Unit (Pg 1/1)

2 1 0 B ARev No

06/20/07 05/09/07 02/12/07 12/11/06 10/04/06

For your Information Final-as-Built Revised per Comments Revised per Comments For Information

SLY SLY SLY SLY SLY

RT RT RT RT -

RT RT RT RT RT

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 06B P&ID Chlorine Injection Unit (Pg 1/1) Project Number 105312 Date: 20-JUNE-07 Rev.: 2 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 07A CABGOC Document Number: D-B14-TOL-MEE-7510-0016 SDRL Code: C03 Schematic Diagrams Watermaker

1 0 B ARev No

08/28/07 02/12/07 01/12/07 11/03/06

Certified-As-Built For Construction Revised per Comments For Information

SLY SLY SLY SLY

RT RT RT -

RT RT RT RT

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 07A Schematic Diagrams - Watermaker Project Number 105312 Date: 28-AUG-07 Rev.: 1 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 400310118 PO Pkg. No.: ME220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 07B CABGOC Document Number: D-B14-TOL-ZZZ-6700-0015 SDRL Code: C03 Schematic Diagrams Chlorine Injection Unit

1 0 0 ARev No

01/15/08 08/28/07 01/05/07 11/03/06

For Information Certified-As-Built For Construction For Information

SLY SLY SLY SLY

RT RT RT -

RT RT RT RT

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 07A Schematic Diagrams Chlorine Injection Unit Project Number 105312 Date: 15-JAN-08 Rev.: 1 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

BILL OF MATERIALSITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 DESCRIPTION BOX, ELEC 12X12X6 SSTL BREATHER/DRAIN 1/2" NPT FUSE, 1 AMP ATMR-CL1/DIV2 HOLDER, FUSE - CL1/DIV2 HUB, ELECTRICAL 1/2" NPT INDICATOR, GREEN LED 120VAC PANEL, ELEC BOX 12X12 SS RELAY, 1PDT, 5A, 24VDC, ULTRA THIN RELAY, 4PDT 120 V SEALD SW, 2 POS W/CONTACTS SOCKET, RELAY REF R0040 TERMINAL, GROUND TERMINAL, SINGLE BEIGE TERMINAL, END BRACKET VARISTOR, METAL OXIDE FITTING, .5" PVC STR MA MANUFACTURER HOFFMAN CORUSE HINDS FERRAZ SH FERRAZ SH CORUSE HINDS ALLEN-BRADLEY HOFFMAN ALLEN BRADLEY SQUARE D ALLEN BRADLEY SQUARE D WIEDMULLER WIEDMULLER WIEDMULLER NEWARK CORUSE HINDS QTY 1 1 1 1 2 1 1 1 1 1 1 4 10 4 1 1 P/N: B0068 B0291 F0355 H0110 H0137 I0040 P0092 R0146 R0040 S0080 S0196 T0274 T0230 T0231 V0308 F1001

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order Number: 4000310118 PO Pkg No: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 08 CABGOC Document No: A-B14-TOL-MEE-7510-0200 SDRL Code: C04 Utilities Schedule

0 ARev No

12/14/06 10/04/06

Revise per Comments For Information

RT RT

-

-

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 08 Utilities Schedule Project Number 105312 Date: 14-Dec-06 Rev.: 0 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Utility Consumption List (Each FD401-4-2 Watermaker ME-7510/7511):Electrical Power Control Power Heater Power Compressed Air Seawater Temperature Salinity Flow Pressure : 480V/3Ph/60Hz (High-Pressure Pump Motor 60hp (45 kw), Boost Pump Motor 3 hp (2.2 kw), and 2nd Pass Charge Pump Motor 3 hp (2.2 kw)) : 120V/ 1ph / 60 Hz (5A max.) (Rev.0) : 120V/1Ph/60Hz (Motor Heater for High-Pressure Pump -120W) : 80 - 863 kPag (80 125 psig), approx. 3 scfm. : 12.8 - 35C (55 -95 F) : 35,000 ppm TDS, nominal : 9.3 m/hr (41 USgpm) : 345 kPag (50 psig) available

Utility Consumption List (For Chlorine Injection Unit ZZZ-6700)Control Power & Power to Pump : 120 V/ 1 ph/ 60 Hz (1A max.) (Chemical Injection Pump 44W per mfr. spec.)

Manufacturing Record Book 08 Utilities Schedule Project Number 105312 Date: 14-Dec-06 Rev.: 0 Page 2 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 9 CABGOC Document No: A-B14-TOL-MEE-7510-0100 SDRL Code: C05 Weight /Center of Gravity Data Sheet

0 ARev No

12/18/06 10/04/06

Revise per Comments For Information

RT RT

-

-

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 09 - WCoG Project Number 105312 Date: 18-Dec-06 Rev.: 0 Page 1 of 3

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Project No. Item No. Revision By Unit

6305 ME-7510/7511 0 RT ME-220 1 of 2 Date: Appr'd: 12/18/2006

Tombua Landana Project - CABGOC BLK 14 ANGOLA

WEIGHT / CENTER OF GRAVITY DATA SHEETClient: Service: CABGOC ALL 2 Plant: Site: Mfr. Model No.: FD401-4-2 Manufacturer: C'TREAT OFFSHORE

P.O. No. Inquiry No. Sheet Doc No. TL Drilling and Production Platform Offshore Angola, Block 14

A-B14-TOL-MEE-7510-0100

Number of Units: Service: ALL

POTABLE WATER MAKERS WITH TURBINE WASH WATER POLISHER

TYPE WEIGHT DATA (LB) DRY LIFT OPERATING TEST A XPump / Motor

WEIGHT DATA (LB) ESTIMATED % CONTINGENCY WEIGHT ALLOWANCE 7,000 7,000 10,000 10,000 5% 5% 5% 5%

REMARKS

WEIGHT STATUSESTIMATE VENDOR INFO. CERTIFIED WEIGHED INFO. A= B= C=

130" 84" 91" 58" 52" 17" 69" 47" 24"

C OF G

X (DRY)= Y (DRY)= Z (DRY)= X (OP)=

B Y

PLAN

Y (OP)= Z (OP)=

C OF G C Z ELEVATIONNOTE: 1.) ALL DIMENSIONS IN FEET, INCHES. 2.) SKETCH IN SOME IDENTIFYING ITEMS ABOVE TO HELP ORIENT THE X & Y DIMENSIONS

SUPPORT STEEL

Z

WEIGHT CHECK LIST ITEM FACTORY SKID/ STEEL WORK FIRE PROOFING THERMAL INSULATION FACTORY/ SKID INSTRUMENTS FACTORY / SKID ELECTRICS FACTORY / SKID PIPEWORK PLATFORMS / LADDERS ITEM CALCULATED CRANE LOAD INDICATOR CERTIFIED TRUCK SCALE LOAD CELLS Date 10/4/06 Issued for Information 12/18/06 Revised per Comments APPLICABLEYES YES YES YES YES YES YES NO NO NO NO NO NO NO

INCLUDED IN WEIGHT DATAYES YES YES YES YES YES YES NO NO NO NO NO NO NO

IF NOT INCLUDED AND APPLICABLE ESTIMATED WEIGHT

FINAL WEIGHT DATA METHOD WEIGHTYES YES YES YES NO NO NO NO

COMMENTS

LBS LBS LBS LBS

No. A 0

Revision

By RT RT

App. RT -

Page 2 of 3

Project No. Item No. Revision By Unit

6305 ZZZ-6700 0 RT ME-220 2 of 2 Date: Appr'd: 12/18/2006

Tombua Landana Project - CABGOC BLK 14 ANGOLA

WEIGHT / CENTER OF GRAVITY DATA SHEETClient: Service: CABGOC ALL 1 Plant: Site: Mfr. Model No.: N/A Manufacturer: C'TREAT OFFSHORE

P.O. No. Inquiry No. Sheet Doc No. TL Drilling and Production Platform Offshore Angola, Block 14

A-B14-TOL-MEE-7510-0100

Number of Units: Service: ALL

CHLORINE INJECTION UNIT

TYPE WEIGHT DATA (LB) DRY LIFT OPERATING TEST A X

WEIGHT DATA (LB) ESTIMATED % CONTINGENCY WEIGHT ALLOWANCE 380 380 500 500 n/a n/a 5% 5%

REMARKS

WEIGHT STATUSESTIMATE VENDOR INFO. CERTIFIED WEIGHED INFO. A= B= C=

36" 14" 68" 19" 7.5" 12" 21" 9" 16.5"

C OF G BPump

ABJ-1010 Cl2 Storage Tk.

X (DRY)= Y (DRY)= Z (DRY)= X (OP)=

Y

PLAN

Y (OP)= Z (OP)=

C OF G C Z ELEVATIONNOTE: 1.) ALL DIMENSIONS IN FEET, INCHES. 2.) SKETCH IN SOME IDENTIFYING ITEMS ABOVE TO HELP ORIENT THE X & Y DIMENSIONS

SUPPORT STEEL

Z

WEIGHT CHECK LIST ITEM FACTORY SKID/ STEEL WORK FIRE PROOFING THERMAL INSULATION FACTORY/ SKID INSTRUMENTS FACTORY / SKID ELECTRICS FACTORY / SKID PIPEWORK PLATFORMS / LADDERS ITEM CALCULATED CRANE LOAD INDICATOR CERTIFIED TRUCK SCALE LOAD CELLS Date 12/18/06 Issued for Information APPLICABLEYES YES YES YES YES YES YES NO NO NO NO NO NO NO

INCLUDED IN WEIGHT DATAYES YES YES YES YES YES YES NO NO NO NO NO NO NO

IF NOT INCLUDED AND APPLICABLE ESTIMATED WEIGHT

FINAL WEIGHT DATA METHOD WEIGHTYES YES YES YES NO NO NO NO

COMMENTS

LBS LBS LBS LBS

No. 0

Revision

By RT

App. RT

Page 3 of 3

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No.: 4000310118 PO Pkg No: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Item Number 10 CABGOC Document No.:A-B14-TOL-MEE-7510-0101 SDRL Code: C06 Equipment Data Sheets Rev. 2(pg 4/16)

2 1 0 B ARev No

6/19/07 5/3/07 2/9/07 12/19/06 10/24/06

Revise per Comment Final Revise per comments For Construction -Revise per comments Issued For Review

RT RT RT RT RT

-

_ DM -

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 10 Equipment DS Project Number 105312 Date: 19-Jun-07 Rev.:2 Page 1 of 16

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Project Location: CABGOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Equipment Tag No: ABJ-1010 Service: Potable Water Chlorine Storage Tank1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Supplier to provide s A GENERAL Manufacturer: PENTAIR Type of Fluid: Water with 3ppm Chlorine Weight/Unit: 20 LBS Flow Rate: A Flow Design Basis: Molecular Weight: 18 Specific Gravity: 1.03 Viscosity: 0.9 cP Operating Pressure: atm PSIG Temperature: Amb F Contaminants: Characteristics: Suspended Solids: Solid By Weight: % DESCRIPTION Top Openning Level gauge Conn (2x) / pump suction PW Inlet

Total Qty: 1 Sheet 1 of 2 D/S No.: A-B14-TOL-MEE-7510-0101NOZZLE SCHEDULE MARK SIZE n/a 2.5-#8 n/a 1/2" n/a 1/2" RATING - FACE #8 Thread FNPT FNPT

Material: Polyglass (Fiberglass) Insulation-Paint: n/a Design Conditions: Design Pressure: 150 PSIG Corrosion Allowance: n/a In

Temperature: 120 F SKETCH

2.5-#8 Openning w/ cap

X3/8NPT PW Inlet

Visible Length

24

NPT Level Gauge Conn. 10

39.5 44

GENERAL NOTES AND COMMENTS No. A Date 10/23/06

B

Supplier shall determine the flow required to maintain a normal chlorine level of 1.5 ppm and a maximum chlorine level of 3 ppm at outlet of the two Potable Water Maker package, each producing 13805 gallons per day of water. Tank shall be sized based on 7 days of continuous consumption.

REVISION BLOCK Revision Description Ctreat Issued for Review

ketch and dimensions of the Org'd RT Rvw'd Apv'd

B 0 1 2

12/19/06 2/9/07 5/3/07 6/19/07

For construction- Revise per comments Revise per comments Final Resubmit for Record

RT RT RT RT

-

GS -

Pg 2 of 16

Project Location: Project Number: Equipment Tag No: Service:1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

CABGOC Tombua Landana Project, Angola Block 14 6501 PBE-8620 Potable Water Chlorine Injection Pump

Total Qty: 1 Sheet 2 of 2 D/S No.: A-B14-TOL-MEE-7510-0101

GENERAL Service: Chlorination unit Specific Gravity: 1.03 At Pumping Temp: Amb F Fluid Handled: Chlorinated Water Corrosion Due To: Vapor Pressure: 0.43 PSIA Viscosity: 0.9 Centipoises (at Pumping Temperature) Type: Plunger Diaphragm Direct Acting Suction from: TANK NPSH at Pump: 34.5 ft Total Capacity: Max: (A) 3 GPD Min: Normal: (A) 1 GPD Suction Pressure: Max: (B) 3 ft Min: 6 in Normal: 2 FT Discharge Pressure: Max: 45 PSIG Min: Normal: Material, Liquid End: PVDF Capacity Control: Manual Auto; Running Stopped; Pneumatic Elect. Hydraulic; Local Remote by Speed Stroke Length Capacity Indicator: Yes No Guards: Coupling Crank Furnished by: Base Plate to be Furnished by Vendor Air Pressure Available: Purge: PSIG Control: PSIG Other Features: Steam Jacketed Stroke Counter Relief Valve Spare Packing Suction Strainer Solenoid Operated Clutch Timer and Multiport Valve Packing, Flush with Vendor: CTreat MFR: LMI Model, Size, and Fig No.: E711 Type Pump: Plunger Diaphragm Direct Acting Metering Heads: Simplex Duplex Triplex Speed Reducer: Integral Separate MFR: LMI Model: Ratio: Class: Plunger Size: N/A Max Stroke: In BHP Reqd: Max Working Press: 150 PSIG Limited by: With Max Driver: PSIG Coupling: N/A Manufacturer: Type: PERFORMANCE DATA NPSHr at Pump (Water): Ft Total Capacity: Max: 60 GPD Min: 0.3 GPD Quoted: 0.04 GPH Strokes Per Minute Each Head: Max: Min: Quoted: Suction Pressure: Max: 3 FT Min: 0.5 FT Discharge Pressure: Max: 150 PSIG Min: PSIG Test Required: Hydrostatic Performance Certified Witnessed Not Witnessed CONSTRUCTION MATERIALS - ASTM Liquid End Matl: PVC Gaskets: Plunger Matl: N/A Max Temp: F Diaphragm: FLUOROFLIM Max Temp: 122 F Packing: Max Temp: F Frame: Cross Head: Valves: CERAMICBALL Seats: TEFLON Body: Caps: Gland: Lantern Ring: CONNECTIONS 1/4 in Suction Size: Type: MNPT Rating: Facing: 1/4 in Discharge Size: Type: MNPT Rating: Facing: Flush: Size: Type: Rating: Facing: Purge: Size: Type: Rating: Facing: with Air Gas LIQUID ENDS Valves Replaceable: Yes No; With Without Removing Piping Built-In Relief Valves: Yes No Valves: Suction: No.: 1 Type: FOOT Area Each: In2 Discharge: No.: 1 Type: BALL CHECK Area Each: In2 Plunger Support: Cross Head Packing Packing Lube: Cross Head Lube: Special Seals: DRIVER Furnished by: CTreat Mounted by: CTreat Driver Type: ELECTROMAGNETIC, Size: HP, Speed: RPM MFR: LMI Frame No.: N/A Electric Motor: 44 watt Volt 120 Ph 1 Hz 60 Class: I Group: D Division: 2 Enclosure: EXPLOSION PROOF Bearing Type: N/A Lube: N/A Air Required: N/A SCFM at PSIG Steam Jacket Stroke Counter Relief Valve Strainer Spare Packing Timer 8 Multiport Valve Speed Indicator Net Weight Complete Unit: 41 Lb Less Driver: Lb GENERAL NOTES AND COMMENTS REVISION BLOCK No. Date Revision Description Org'd Rvw'd Apv'd A Supplier shall determine the flow required to maintain a normal chlorine level of 1.5 ppm and a maximum chlorine level of 3 ppm at outlet of the two Potable Water Maker packages, each producing 13805 gallons per day of water. B 12/19/06 Revised per comments B Supplier shall determine the suction pressure based on the Chlorine Storage Tank site RT and location. For Construction 0 2/9/07 C Tubing materials to be corrosion resistant Polyethylene. (PE) RT Final 1 5/3/07 RT 2 6/19/07 Resubmit for Record RT -

Pg 3 of 16

CENTRIFUGAL PUMP DATA SHEETProject Location: Project Number: Equipment Tag No.: Service:1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50A B C D E F

CABGOC Tombua Landana Project, Angola Block 14 6501 PBE-8845/8846 In Service: Spare: Potable Water Maker High Pressure Pump

Total Qty: 1/ pkg Sheet 1 of 1 D/S No.: A-B14-TOL-MEE-7510-0101

OPERATING CONDITIONS (D) Duty: Continuous Intermittent Standby Series Stand Alone Corr/Abrasion due to: Liquid Pumped: Seawater Pumping Temperature: 90 F Viscosity: SSU cP Vapor Pressure: PSIA NPSHA (Top of Foundation): 102 Ft Suction Pressure: PSIG Normal: 50 Rated: 50 Discharge Pressure: PSIG Normal: 986 Rated: 986 Differential Pressure: PSID Normal: 936 Rated: 936 Flow @ Pumping Temp: GPM Normal: 40 Rated: 40 Specific Gravity @ P.T.: 1.03 Hydraulic Horsepower: 52 Hp VERTICAL PUMP DATA Pit or Sump Depth: Ft Minimum Submergence: Ft CONSTRUCTION Type: Horizontal Vertical In-Line Self-Priming Sump Vertical Turbine Submerged Mechanical Seal Packing Type: NOZZLE DESCRIPTION Suction: 2 In ANSI Class RF RTJ FF THD Discharge: 1.5 In ANSI Class RF RTJ FF THD GEARBOX OR DRIVE MECHANISM (note 2) Type: Direct Belt External Gear Supplied by: Ctreat Mounted by: Ctreat Specification No.: GS 4.06 PRIMARY DRIVER Type: Electric Motor Gas Turbine Gas Engine Diesel Engine Supplied by: Vendor Mounted by: Vendor Power: 60 HP Volts 460 pH 3 Hz 60 Enclosure: TEFC Rated Speed: 3,600 RPM Specification No.: G.S.12.03A AUXILIARY PIPING N/A Cooling Fluid: Water Water-Glycol Supply Temp: F, Pressure: PSIG Piping Material: Carbon Steel : Stainless Tubing : Pipe Cooling Water: Seal Flush Plan: Auxiliary Seal Plan: PACKAGING Skid: MFR Std Common Base Plate Spec No.: Painting: Unpainted Prime Only : Finish Painted : MFR Std Custom - Spec No.: GS 2.02 Lifting Lugs: : Yes No Sling & Spreader Yes No Export Crating: Yes No Spec No.: GS 0.03 TESTING See TIR for package Description Witnessed Unwitnessed Hydrostatic: NPSHr Mech. Run with Dismantling after: Run Performance: Single Point Driver used in Performance Test: Actual MFR Test Block GENERAL NOTES AND COMMENTS1. Please refer to motor data sheets for FLC and RLC information. 2. Pumps includes gear box with 4.14 : 1 gear ratio.

DATA TO BE COMPLETED BY VENDOR Manufacturer: ITT - Ctreat Vendor: ITT - Ctreat Offshore Model: Series 20 Curve No: P2GJQ No. Stages: one PERFORMANCE DATA Rated Speed: 14,707 RPM (note 2) Rated Speed: RPM Rated Point Efficiency: 42 % Rated Point Efficiency: Rated Impeller: Rated Head: 2126 Ft; Max (Shut-off) Head: 2218 Ft Stage Horsepower: 60 HP (Each) NPSHr: 8.5 FT Min Submergence: Ft Min. PUMP AUXILIARY PIPING N/A Auxiliary: GPM, Total: GPM Auxiliary Seal Flush Fluid: Max. Allowable Cooling Water Supply Press: PSIG CONSTRUCTION Type: End Suction Centrifugal Rotation Viewed from Coupling End: CW CCW Pump will pass In In In Diameter Sphere Discharge Case: Fabricated Cast Case - Mounting: Centerline Foot Bracket - Split: Axial Radial Volute: Single Double Diffuser - Connections Vent Gauge Drain Vibration Probes - Maximum Allowable Press: 1,500 PSIG Impeller - Design Diameter: 4.615 In, Max: 4.860 In, Minimum 4.372 In - Mounting: Between Bearings Overhung Bearings -Type: Radial Thrust - Lubrication: Ring Oil Flood Mist Flinger Pressure Packing MFR/Type: / Size/No. Rings: Mech. Seal MFR/Type: J. Crane / Ctreat API Class Code: BSPFM Column Pipe: Flanged Threaded Length: Ft Line Shaft: Open Enclosed Bearings: Bowl Line Shaft Sight Flow Indicator Bearing Lubrication: Water Oil Grease Pump Thrust: Case/Bowls Impeller Shaft Column Throat Bushing Wear Rings Lb; Up Down CONSTRUCTION MATERIALS Sleeve 316 SSTL Internals 316 SSTL Float and Rod AISI 8620 N/A Shaft Bearings N/A Pipe (Cooling) N/A Tube (Cooling)

316 SSTL N/A N/A N/A N/A N/A

Description Skid/Other Primary Driver Grbox/Couplngs Pump TotalNo. A B 0 1 2 Date 10/18/06 12/19/06 2/9/07 5/3/07 6/19/07

Dry/Lift 1060 150 75 1285

WEIGHTS (Lb) Operating

Flooded

Notes/Comments

REVISION BLOCKRevision Description Ctreat Issue Revise per comments For Construction Final Add note 2 Org'd RT RT RT RT RT Rvw'd Appvd -

Pg 4 of 16

CENTRIFUGAL PUMP DATA SHEETProject Location: Project Number: Equipment Tag No.: Service:1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50A B C D E F

CABGOC Tombua Landana Project, Angola Block 14 6501 PBE-8855/8856 In Service: Spare: Potable Water Maker Booster Pump

Total Qty: 1/ pkg Sheet 1 of 1 D/S No.: A-B14-TOL-MEE-7510-0101

OPERATING CONDITIONS (D) Duty: Continuous Intermittent Standby Series Stand Alone Corr/Abrasion due to: Liquid Pumped: Seawater Pumping Temperature: 90 F Viscosity: SSU cP Vapor Pressure: PSIA NPSHA (Top of Foundation): 100 Ft Suction Pressure: PSIG Normal: 50 Rated: 50 Discharge Pressure: PSIG Normal: 130 Rated: 130 Differential Pressure: PSID Normal: 70 Rated: 70 Flow @ Pumping Temp: GPM Normal: 41 Rated: 41 Specific Gravity @ P.T.: 1.03 Hydraulic Horsepower: 2.77 Hp VERTICAL PUMP DATA N/A Pit or Sump Depth: Ft Minimum Submergence: Ft CONSTRUCTION Type: Horizontal Vertical In-Line Self-Priming Sump Vertical Turbine Submerged Mechanical Seal Packing Type: NOZZLE DESCRIPTION Suction: 2 In ANSI Class 300 RF RTJ FF THD Discharge: 2 In ANSI Class 300 RF RTJ FF THD GEARBOX OR DRIVE MECHANISM Type: Direct Belt External Gear Supplied by: Mounted by: Specification No.: GS 4.06 PRIMARY DRIVER Type: Electric Motor Gas Turbine Gas Engine Diesel Engine Supplied by: Vendor Mounted by: Vendor Power: 3 HP Volts 460 pH 3 Hz 60 Enclosure: TEFC Rated Speed: 3,600 RPM Specification No.: G.S.12.03A AUXILIARY PIPING N/A Cooling Fluid: Water Water-Glycol Supply Temp: F, Pressure: PSIG Piping Material: Carbon Steel : Stainless Tubing : Pipe Cooling Water: Seal Flush Plan: Auxiliary Seal Plan: PACKAGING Skid: MFR Std Common Base Plate Spec No.: Painting: Unpainted Prime Only : Finish Painted : MFR Std Custom - Spec No.: GS 2.02 Lifting Lugs: : Yes No Sling & Spreader Yes No Export Crating: Yes No Spec No.: GS 0.03 TESTING See TIR for package Description Witnessed Unwitnessed Hydrostatic: NPSHr Mech. Run with Dismantling after: Run Performance: Single Point Driver used in Performance Test: Actual MFR Test Block GENERAL NOTES AND COMMENTS

DATA TO BE COMPLETED BY VENDOR Manufacturer: ITT - Goulds Vendor: ITT - Ctreat Offshore Model: SSV Curve No: 3SV No. Stages: 3 PERFORMANCE DATA Rated Speed: 3,500 RPM Rated Speed: RPM Rated Point Efficiency: 60 % Rated Point Efficiency: Rated Impeller: Rated Head: 162 Ft; Max (Shut-off) Head: 195 Ft Stage Horsepower: 3.0 HP (Each) NPSHr: 4.61 FT Min Submergence: Ft Min. PUMP AUXILIARY PIPING N/A Auxiliary: GPM, Total: GPM Auxiliary Seal Flush Fluid: Max. Allowable Cooling Water Supply Press: PSIG CONSTRUCTION Type: In-Line Multi-Stage Vertical Rotation Viewed from Coupling End: CW CCW Pump will pass In In In Diameter Sphere Discharge Case: Fabricated Cast Case - Mounting: Centerline Foot Bracket - Split: Axial Radial Volute: Single Double Diffuser - Connections Vent Gauge Drain Vibration Probes - Maximum Allowable Press: PSIG 360 Impeller - Design Diameter: In, Max: In, Minimum In - Mounting: Between Bearings Overhung Bearings -Type: Radial Thrust - Lubrication: Ring Oil Flood Mist Flinger Pressure Packing MFR/Type: / Size/No. Rings: Mech. Seal MFR/Type: Goulds API Class Code: Column Pipe: Flanged Threaded Length: Ft Line Shaft: Open Enclosed Bearings: Bowl Line Shaft Sight Flow Indicator Bearing Lubrication: Water Oil Grease Pump Thrust: Case/Bowls Impeller Shaft Column Throat Bushing Wear Rings Lb; Up Down CONSTRUCTION MATERIALS Sleeve 316 SSTL Internals 316 SSTL Float and Rod 316 SSTL N/A Shaft Bearings N/A Pipe (Cooling) N/A Tube (Cooling)

TC 316 SSTL N/A N/A N/A N/A

Description Primary Primary Driver Grbox/Couplngs Skid/Other TotalNo. A B 0 1 2 Date 10/18/06 12/19/06 2/9/07 5/3/07 6/19/07

Dry/Lift 35 76

WEIGHTS (Lb) Operating

Flooded

Notes/Comments

111 REVISION BLOCKRevision Description Ctreat Issued for Review Revise per Comments For Construction Final Resubmit for record Org'd RT RT RT RT RT Rvw'd Appvd -

Pg 5 of 16

CENTRIFUGAL PUMP DATA SHEETProject Location: Project Number: Equipment Tag No.: Service:1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50A B C D E F

CABGOC Tombua Landana Project, Angola Block 14 6501 PBE- 8850/8851 In Service: Spare 2nd Pass Charge Pump

Total Qty: 1/ pkg Sheet 1 of 1 D/S No.: A-B14-TOL-MEE-7510-0101

OPERATING CONDITIONS (D) Duty: Continuous Intermittent Standby Series Stand Alone Corr/Abrasion due to: Liquid Pumped: Fresh Water Pumping Temperature: 90 F Viscosity: SSU cP Vapor Pressure: PSIA NPSHA (Top of Foundation): 93 Ft Suction Pressure: PSIG Normal: 15 Rated: 15 Discharge Pressure: PSIG Normal: 279 Rated: 279 Differential Pressure: PSID Normal: 264 Rated: 264 Flow @ Pumping Temp: GPM Normal: 4.5 Rated: 4.5 Specific Gravity @ P.T.: 1.0 Hydraulic Horsepower: 1.85 Hp VERTICAL PUMP DATA N/A Pit or Sump Depth: Ft Minimum Submergence: Ft CONSTRUCTION Type: Horizontal Vertical In-Line Self-Priming Sump Vertical Turbine Submerged Mechanical Seal Packing Type: NOZZLE DESCRIPTION Suction: 1.25 In ANSI Class RF VIC FF THD Discharge: 1.25 In ANSI Class RF VIC FF THD GEARBOX OR DRIVE MECHANISM Type: Direct Belt External Gear Supplied by: Mounted by: Specification No.: GS 4.06 PRIMARY DRIVER Type: Electric Motor Gas Turbine Gas Engine Diesel Engine Supplied by: GE Mounted by: Ctreat Power: 3 HP Volts 460 pH 3 Hz 60 Enclosure: TEFC Rated Speed: 3,600 RPM Specification No.: G.S.12.03A AUXILIARY PIPING N/A Cooling Fluid: Water Water-Glycol Supply Temp: F, Pressure: PSIG Piping Material: Carbon Steel : Stainless Tubing : Pipe Cooling Water: Seal Flush Plan: Auxiliary Seal Plan: PACKAGING Skid: MFR Std Common Base Plate Spec No.: Painting: Unpainted Prime Only : Finish Painted : MFR Std Custom - Spec No.: GS 2.02 Lifting Lugs: : Yes No Sling & Spreader Yes No Export Crating: Yes No Spec No.: GS 0.03 TESTING See TIR for package Description Witnessed Unwitnessed Hydrostatic: NPSHr Mech. Run with Dismantling after: Run Performance: Single Point Driver used in Performance Test: Actual MFR Test Block GENERAL NOTES AND COMMENTS

DATA TO BE COMPLETED BY VENDOR Manufacturer: Grundfos Vendor: ITT- Ctreat Offshore Model: CRN1-21 Curve No: CRN1 No. Stages: 21 PERFORMANCE DATA Rated Speed: 3,450 RPM Rated Speed: RPM Rated Point Efficiency: 38 % Rated Point Efficiency: Rated Impeller: Rated Head: 610 Ft; Max (Shut-off) Head: 620 Ft Stage Horsepower: HP (Each) NPSHr: 12.5 FT Min Submergence: Ft Min. PUMP AUXILIARY PIPING N/A Auxiliary: GPM, Total: GPM Auxiliary Seal Flush Fluid: Max. Allowable Cooling Water Supply Press: PSIG CONSTRUCTION Type: In-Line Multi-Stage Vertical Rotation Viewed from Coupling End: CW CCW Pump will pass In In In Diameter Sphere Discharge Case: Fabricated Cast Case - Mounting: Centerline Foot Bracket - Split: Axial Radial Volute: Single Double Diffuser - Connections Vent Gauge Drain Vibration Probes - Maximum Allowable Press: 360 PSIG Impeller - Design Diameter: In, Max: In, Minimum In - Mounting: Between Bearings Overhung Bearings -Type: Radial Thrust - Lubrication: Ring Oil Flood Mist Flinger Pressure Packing MFR/Type: / Size/No. Rings: Mech. Seal MFR/Type: Grundfos API Class Code: Column Pipe: Flanged Threaded Length: Ft Line Shaft: Open Enclosed Bearings: Bowl Line Shaft Sight Flow Indicator Bearing Lubrication: Water Oil Grease Pump Thrust: Case/Bowls Impeller Shaft Column Throat Bushing Wear Rings Lb; Up Down CONSTRUCTION MATERIALS Sleeve 316 SSTL Internals 316 SSTL Float and Rod 316 SSTL N/A Shaft Bearings N/A Pipe (Cooling) N/A Tube (Cooling)

316 SSTL 316 SSTL N/A N/A N/A N/A

Description Pump Primary Driver Grbox/Couplngs Skid/Other Total (est.)No. A B 0 1 2 Date 10/19/06 12/19/06 2/9/07 5/3/07 6/19/07

Dry/Lift

WEIGHTS (Lb) Operating

Flooded

Notes/Comments

100 REVISION BLOCKRevision Description Ctreat Issued for Review Revise per comments For Construction Final Resubmit for Record Org'd RT RT RT RT RT Rvw'd Appvd -

Pg 6 of 16

LOW VOLTAGE ELECTRIC MOTOR DATA SHEETProject Location: CAGBOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Motor Tag No.: PBE-8845M/ 8846M1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 A B C D E Unit: HIGH PRESSURE PUMP MOTOR Manufacturer: General Electric

Total Qty: 1/ pkg Sheet 1 of 2 D/S No.: A-B14-TOL-MEE-7510-0101

GENERAL Driven Equipment: POTABLE WATER MAKER WITH TURBINE WASH WATER POLISHER (ME-7510/7511) Model Number: ULTRA XSD-841 Equipment Numbers: ME-7510 / 7511 MOTOR DESIGN DATA ACCESSORY EQUIPMENT Applicable Specifications: Per CABGOC G.S. 12.03A Base Plate Soleplate Stator Shift NEMA: Std. MG-1 MFR Std Fans Non-Sparking Fans IEEE Std 841 DC Excitation: KW Req'd: Volts: Site Data: By: Purchaser Manufacturer Area Class.: Hazardous Cl. I Gp. D Div. 2 Non-Haz. Description: Enclosed Collector Rings: Purged: Medium: Explosion-Resistant Nonpurged Forced Ventilation CFM: Bearing Temperature Devices: Location: Description: Alarm Setpoint: C Space Heaters: (Note 1 & 2) Power: 0.12 KW Pressure: PSIG

Altitude: 70 Ft Ambient Temps: Max: 95 F, Min: 55 F Unusual Conditions: Dust Fumes Salt Offshore Marine Environment Drive System: Direct Connected Gear V-Belt Type Motor: Squirrel Cage Induction Nema Design B Synchronous: Power Factor Required: Excitation: Brushless Slip Ring Field Discharge Resistor by Motor Manufacturer Wound Rotor Induction Enclosure: Explosion Proof TEFC TENV TEWAC TEIGF, using Gas Double Wall Carbon Steel Tubes Water Supply: Pressure: PSIG Temperature: F Water Allow. Diff. Press.: PSID Temp Rise: F Water Side Min Corr Allow.: In and Foul Factor: Air Gas Supply Pressure: Weather Protected, Type: Forced Ventilated

Press Drop:

In H2O

Shutdown Setpoint:

C

120 Volts 1 Phase 60 Hertz

Open-Drip Proof Basic Data: Power Supply: 460 Volts 3 Phase 60 Hertz Nameplate HP: 60 Service Factor: 1.15 Nominal Speed: 3600 RPM Fan Insulation: Class F Type: Non-Hygroscopic

Open

Temperature Rise: 90 C Above 40 C By Resistance method Starting: Full Voltage Reduce Voltage % Loaded Unloaded Voltage Dip % Vibration: NEMA Standard Noise: NEMA Standard Per CABGOC Spec GS 15.01 GENERAL NOTES AND COMMENTS 1. Motors 20 HP and larger shall have space heaters. 2. Supplier shall submit this completed Motor Data Sheet. 3. Motors 60 HP and larger shall have a separate terminal box for space heater leads. 4. GE Motors Spec. and Clarifications/Eceptions attached.

Maximum Sheath Temperature: 200 C Winding Temperature Detectors: Thermistors: No./Phase: Type: Positive Temperature Coeff. Negative Temperature Temperature Switch: Yes No Resistance Temperature Detectors: No./Phase: Resistance Mat'l OHMS Selector Switch & Indicator by: Purchaser MFR Max Stator Winding Temperature: C Alarm Setpoint: C Shutdown Setpoint: C Winding Temperature Detector & Space Heater Leads: In Separate Conduit Boxes Motor Arranged for Differential Protection: Self-Balance Primary-Current Method C.T. Description: Extended Leads Length: Ft Surge Capacitors Lightning Arrestors Current Transformer for Ammeter Description: Main Conduit Box Sized for: Main Type: Insulated Non-insulated C.T.s for Diff. Protection Mounted by: Surge Capacitors Mounted by: Lightning Arrestors Mounted by: C.T. for Ammeter Mounted by: Space for Stress Cones Air Filters: MFR: Type: REVISION BLOCK No. Date Revision Description Org'd Rvw'd Apv'd 10/23/06 C'treat issued for review A RT 12/19/06 Revise per comments B RT 2/9/07 0 For Construction RT 5/3/07 1 Final RT 6/19/07 Resubmit for record 2 RT -

Sheet 1of 6

Pg 7 of 16

Project Location: CABGOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Motor Tag No.: PBE-8845M/ 8846M1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 A B C D E MANUFACTURER'S DATA Manufacturer: GE Frame No.: 364 TSD Full Load RPM (Ind.) 3600 Efficiency: Full Load: 95 %, 3/4 Load: 95 % 1/2 Load: 94 % Power. Factor (Ind.) Full Load: 86 3/4 Load: 83 1/2 Load: 75 Current (Rated Volt): Full Load: 68.7 Locked Rotor Amps: 424 Locked Rotor Power Factor: Locked Rotor withstand Time (Cold Start): Torques: Full Load: 88 Ft-Lb Locked Rotor: 145 Ft-Lb Starting (Syn.): Ft-Lb Pull-up (Ind.): Ft-Lb Pull-In (Syn.): Ft-Lb Breakdown (Ind.): 233 Ft-Lb Pull-Out (Syn.): Ft-Lb Open Circuit Time Constant: 1.011 Sec. Symmetrical Contribution to 30 Terminal Fault: At 1/2 Cycles: At 5 Cycles: Reactances: Sub-Transient (X'd): Transient (X'd): Synchronous (X'd): AC Stator Resistance: OHMS @ C Rated KVA: KVA Inrush @ Full Voltage & Locked Rotor (Syn.): Code G KVA @ Full Voltage & 95% Speed: % Max Line Current in Stator on 1st Slip Cyc @ Pull-Out: (Syn): Acceleration Time: 33 Sec Motor Only @ Rated Volt. Acceleration Time: Sec Motor & Load @ 85% Rated Volt. Rotor/Field WK2 @ Motor Shaft: Lb-Ft2 Rotation Facing Coupling End: Maximum Number of Starts per Hour: Field Discharge Resistor: OHMS Rated Excitation Field Voltage: DC Resistance of Excitation Field @ 25C: OHMS Excitation Field AMPS @ Full Load & Rated PF: Excitation Field AMPS: Maximum: Minimum: Excitation Field: Rheostate Fixed Resistor Supplied by: Bearing Type: Ball Lubrication: Grease Lube Oil Flow Rate: GPM Supply Pressure: PSIG Total Shaft End Float: Limit End Float to: Motor Rotor: Solid Split Motor Hub: Solid Split For TEWAC & TEIGF Motors: Cooling Water Req'd: GPM Press Drop: PSID CW Temp Rise: C Air Gas Req'd: SCFM Press Maint. In H2O Curves Required Based on Motor Saturation @ Rated Voltage: Speed vs. Torque (Also @ % Rated Voltage) Speed vs. Power Factor Speed vs. Current GENERAL NOTES AND COMMENTS No. A B 0 1 2 Date10/23/06 12/19/06 2/9/07 5/3/07 6/19/07

Total Qty: 1 Sheet 2 of 2 D/S No.: A-B14-TOL-MEE-7510-0101Witness

SHOP INSPECTION AND TESTS Description Required Shop Inspection: Testing Per NEMA: (Routine) MFR Std Shop Tests: Immersion Test: Special Tests: Chevron Spec. GS 12.03B

COUPLING Supplied by: Pump Vendor MFR: Lovejoy Model: Motor Half Mounted By: Motor MFR Purchaser PAINTING Manufacturer's Standard Chevron Spec. GS 2.02 ( per GE Clarifications)

Ctreat

SHIPMENT Domestic Export Export Boxing Outdoor Storage over 3 Months OEM PARTS FOR WATERMAKER (WHICH IS EXPORT PACKED) WEIGHTS Shipping Weight: Max Erection Wt: Description: Height:

Net Weight: 1060 Lb Rotor Weight: Lb Max Maint. Weight: Lb Dimension: Length: Width:

Lb Lb

REVISION BLOCK Revision Description C'treat issued for review Revise per comments For Construction Final Resubmit for record

Org'd RT RT RT RT RT

Rvw'd Apv'd -

Sheet 2of 6

Pg 8 of 16

LOW VOLTAGE ELECTRIC MOTOR DATA SHEETProject Location: CAGBOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Motor Tag No.: PBE-8855M/ 8856M1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 A B C D E F Unit: BOOSTER PUMP MOTOR Manufacturer: General Electric

Total Qty: 1 / pkg Sheet 1 of 2 D/S No.: A-B14-TOL-MEE-7510-0101

GENERAL Driven Equipment: POTABLE WATER MAKER WITH TURBINE WASH WATER POLISHER (ME-7510/7511) Model Number: ULTRA XSD-841 Equipment Numbers: ME-7510/ 7511 MOTOR DESIGN DATA ACCESSORY EQUIPMENT Applicable Specifications: Per CABGOC G.S. 12.03A Base Plate Soleplate Stator Shift NEMA: Std. MG-1 MFR Std Fans Non-Sparking Fans IEEE Std 841 DC Excitation: KW Req'd: Volts: Site Data: By: Purchaser Manufacturer Area Class.: Hazardous Cl. I Gp. D Div. 2 Non-Haz. Description: Enclosed Collector Rings: Purged: Medium: Explosion-Resistant Nonpurged Forced Ventilation CFM: Bearing Temperature Devices: Location: Description: Alarm Setpoint: C Space Heaters: (Note 1 & 2) Power: KW Pressure: PSIG

Altitude: 70 Ft Ambient Temps: Max: 95 F, Min: 55 F Unusual Conditions: Dust Fumes Salt Offshore Marine Environment Drive System: Direct Connected Gear V-Belt Type Motor: Squirrel Cage Induction Nema Design B Synchronous: Power Factor Required: Excitation: Brushless Slip Ring Field Discharge Resistor by Motor Manufacturer Wound Rotor Induction Enclosure: Explosion Proof TEFC TENV TEWAC TEIGF, using Gas Double Wall Carbon Steel Tubes Water Supply: Pressure: PSIG Temperature: F Water Allow. Diff. Press.: PSID Temp Rise: F Water Side Min Corr Allow.: In and Foul Factor: Air Gas Supply Pressure: Weather Protected, Type: Forced Ventilated

Press Drop:

In H2O

Shutdown Setpoint: C - N/A Volts Phase Hertz

Open-Drip Proof Basic Data: Power Supply: 460 Volts 3 Phase 60 Hertz Nameplate HP: 3 Service Factor: 1.15 Nominal Speed: 3600 RPM Fan Insulation: Class F Type: Non-Hygroscopic

Open

Temperature Rise: 90 C Above 40 C By Resistance method Starting: Full Voltage Reduce Voltage % Loaded Unloaded Voltage Dip % Vibration: NEMA Standard Noise: NEMA Standard Per CABGOC Spec GS 15.01 GENERAL NOTES AND COMMENTS 1. Motors 20 HP and larger shall have space heaters. 2. Supplier shall submit this completed Motor Data Sheet. 3. Motors 60 HP and larger shall have a separate terminal box for space heater leads. 4. GE Motors Spec. and Clarifications/Eceptions attached.

Maximum Sheath Temperature: C Winding Temperature Detectors: Thermistors: No./Phase: Type: Positive Temperature Coeff. Negative Temperature Temperature Switch: Yes No Resistance Temperature Detectors: No./Phase: Resistance Mat'l OHMS Selector Switch & Indicator by: Purchaser MFR Max Stator Winding Temperature: C Alarm Setpoint: C Shutdown Setpoint: C Winding Temperature Detector & Space Heater Leads: In Separate Conduit Boxes Motor Arranged for Differential Protection: Self-Balance Primary-Current Method C.T. Description: Extended Leads Length: Ft Surge Capacitors Lightning Arrestors Current Transformer for Ammeter Description: Main Conduit Box Sized for: Main Type: Insulated Non-insulated C.T.s for Diff. Protection Mounted by: Surge Capacitors Mounted by: Lightning Arrestors Mounted by: C.T. for Ammeter Mounted by: Space for Stress Cones Air Filters: MFR: Type: REVISION BLOCK No. Date Revision Description Org'd Rvw'd Apv'd 10/23/06 C'treat issued for review A RT 12/19/06 Revise per comments B RT 2/9/07 0 For Construction RT 5/3/07 1 Final RT 6/19/07 Resubmit for record 2 RT -

Sheet 3of 6

Pg 9 of 16

Project Location: CABGOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Motor Tag No.: PBE-8855M/ 8856M1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 A B C D E F MANUFACTURER'S DATA Manufacturer: GE Frame No.: 182 TC Full Load RPM (Ind.) 3600 Efficiency: Full Load: 88.5 %, 3/4 Load: 88.9 % 1/2 Load: 87.2 % Power. Factor (Ind.) Full Load: 82.5 3/4 Load: 77 1/2 Load: 66.5 Current (Rated Volt): Full Load: 3.8 Locked Rotor Amps: 25.8 Locked Rotor Power Factor: Locked Rotor withstand Time (Cold Start): Torques: Full Load: 4.5 Ft-Lb Locked Rotor: 8.1 Ft-Lb Starting (Syn.): Ft-Lb Pull-up (Ind.): Ft-Lb Pull-In (Syn.): Ft-Lb Breakdown (Ind.): 14 Ft-Lb Pull-Out (Syn.): Ft-Lb Open Circuit Time Constant: 0.370 Sec. Symmetrical Contribution to 30 Terminal Fault: At 1/2 Cycles: At 5 Cycles: Reactances: Sub-Transient (X'd): Transient (X'd): Synchronous (X'd): AC Stator Resistance: OHMS @ C Rated KVA: KVA Inrush @ Full Voltage & Locked Rotor (Syn.): Code G KVA @ Full Voltage & 95% Speed: % Max Line Current in Stator on 1st Slip Cyc @ Pull-Out: (Syn): Acceleration Time: 54 Sec Motor Only @ Rated Volt. Acceleration Time: Sec Motor & Load @ 85% Rated Volt. Rotor/Field WK2 @ Motor Shaft: Lb-Ft2 Rotation Facing Coupling End: Maximum Number of Starts per Hour: Field Discharge Resistor: OHMS Rated Excitation Field Voltage: DC Resistance of Excitation Field @ 25C: OHMS Excitation Field AMPS @ Full Load & Rated PF: Excitation Field AMPS: Maximum: Minimum: Excitation Field: Rheostate Fixed Resistor Supplied by: Bearing Type: Ball Lubrication: Grease Lube Oil Flow Rate: GPM Supply Pressure: PSIG Total Shaft End Float: Limit End Float to: Motor Rotor: Solid Split Motor Hub: Solid Split For TEWAC & TEIGF Motors: Cooling Water Req'd: GPM Press Drop: PSID CW Temp Rise: C Air Gas Req'd: SCFM Press Maint. In H2O Curves Required Based on Motor Saturation @ Rated Voltage: Speed vs. Torque (Also @ % Rated Voltage) Speed vs. Power Factor Speed vs. Current GENERAL NOTES AND COMMENTS No. A B 0 1 2 Date10/23/06 12/19/06 2/9/07 5/3/07 6/19/07

Total Qty: 1 Sheet 2 of 2 D/S No.: A-B14-TOL-MEE-7510-0101Witness

SHOP INSPECTION AND TESTS Description Required Shop Inspection: Testing Per NEMA: (Routine) MFR Std Shop Tests: Immersion Test: Special Tests: Chevron Spec. GS 12.03B

COUPLING Supplied by: Pump Vendor MFR: ITT - Goulds Model: Motor Half Mounted By: Motor MFR Purchaser PAINTING Manufacturer's Standard Chevron Spec. GS 2.02 ( per GE Clarifications)

Ctreat

SHIPMENT Domestic Export Export Boxing Outdoor Storage over 3 Months OEM PARTS FOR WATERMAKER (WHICH IS EXPORT PACKED) WEIGHTS Shipping Weight: Max Erection Wt: Description: Height:

Net Weight: 76 Lb Rotor Weight: Lb Max Maint. Weight: Lb Dimension: Length: Width:

Lb Lb

REVISION BLOCK Revision Description C'treat issued for review Revise per comments For Construction Final Resubmit for record

Org'd RT RT RT RT RT

Rvw'd Apv'd -

Sheet 4of 6

Pg 10 of 16

LOW VOLTAGE ELECTRIC MOTOR DATA SHEETProject Location: CAGBOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Motor Tag No.: PBE-8850M/ 8851M1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 A B C D E F Unit: 2ND PASS CHARGE PUMP MOTOR Manufacturer: General Electric

Total Qty: 1 / pkg Sheet 1 of 2 D/S No.: A-B14-TOL-MEE-7510-0101

GENERAL Driven Equipment: POTABLE WATER MAKER WITH TURBINE WASH WATER POLISHER (ME-7510/7511) Model Number: ULTRA XSD-841 Equipment Numbers: ME-7510/ 7511 MOTOR DESIGN DATA ACCESSORY EQUIPMENT Applicable Specifications: Per CABGOC G.S. 12.03A Base Plate Soleplate Stator Shift NEMA: Std. MG-1 MFR Std Fans Non-Sparking Fans IEEE Std 841 DC Excitation: KW Req'd: Volts: Site Data: By: Purchaser Manufacturer Area Class.: Hazardous Cl. I Gp. D Div. 2 Non-Haz. Description: Enclosed Collector Rings: Purged: Medium: Explosion-Resistant Nonpurged Forced Ventilation CFM: Bearing Temperature Devices: Location: Description: Alarm Setpoint: C Space Heaters: (Note 1 & 2) Power: KW Pressure: PSIG

Altitude: 70 Ft Ambient Temps: Max: 95 F, Min: 55 F Unusual Conditions: Dust Fumes Salt Offshore Marine Environment Drive System: Direct Connected Gear V-Belt Type Motor: Squirrel Cage Induction Nema Design B Synchronous: Power Factor Required: Excitation: Brushless Slip Ring Field Discharge Resistor by Motor Manufacturer Wound Rotor Induction Enclosure: Explosion Proof TEFC TENV TEWAC TEIGF, using Gas Double Wall Carbon Steel Tubes Water Supply: Pressure: PSIG Temperature: F Water Allow. Diff. Press.: PSID Temp Rise: F Water Side Min Corr Allow.: In and Foul Factor: Air Gas Supply Pressure: Weather Protected, Type: Forced Ventilated

Press Drop:

In H2O

Shutdown Setpoint: C - N/A Volts Phase Hertz

Open-Drip Proof Basic Data: Power Supply: 460 Volts 3 Phase 60 Hertz Nameplate HP: 3 Service Factor: 1.15 Nominal Speed: 3600 RPM Fan Insulation: Class F Type: Non-Hygroscopic

Open

Temperature Rise: 90 C Above 40 C By Resistance method Starting: Full Voltage Reduce Voltage % Loaded Unloaded Voltage Dip % Vibration: NEMA Standard Noise: NEMA Standard Per CABGOC Spec GS 15.01 GENERAL NOTES AND COMMENTS 1. Motors 20 HP and larger shall have space heaters. 2. Supplier shall submit this completed Motor Data Sheet. 3. Motors 60 HP and larger shall have a separate terminal box for space heater leads. 4. GE Motors Spec. and Clarifications/Eceptions attached.

Maximum Sheath Temperature: C Winding Temperature Detectors: Thermistors: No./Phase: Type: Positive Temperature Coeff. Negative Temperature Temperature Switch: Yes No Resistance Temperature Detectors: No./Phase: Resistance Mat'l OHMS Selector Switch & Indicator by: Purchaser MFR Max Stator Winding Temperature: C Alarm Setpoint: C Shutdown Setpoint: C Winding Temperature Detector & Space Heater Leads: In Separate Conduit Boxes Motor Arranged for Differential Protection: Self-Balance Primary-Current Method C.T. Description: Extended Leads Length: Ft Surge Capacitors Lightning Arrestors Current Transformer for Ammeter Description: Main Conduit Box Sized for: Main Type: Insulated Non-insulated C.T.s for Diff. Protection Mounted by: Surge Capacitors Mounted by: Lightning Arrestors Mounted by: C.T. for Ammeter Mounted by: Space for Stress Cones Air Filters: MFR: Type: REVISION BLOCK No. Date Revision Description Org'd Rvw'd Apv'd 10/23/06 C'treat issued for review A RT 12/19/06 Revise per comments B RT 2/9/07 0 For Construction RT 5/3/07 1 Final RT 26/19/07

Resubmit for record

RT

-

-

Sheet 5of 6

Pg 11 of 16

Project Location: CABGOC Tombua Landana Project, Angola Block 14 Project Number: 6501 Motor Tag No.: PBE-8850M/ 8851M1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 A B C D E F MANUFACTURER'S DATA Manufacturer: GE Frame No.: 182 TC Full Load RPM (Ind.) 3600 Efficiency: Full Load: 88.5 %, 3/4 Load: 88.9 % 1/2 Load: 87.2 % Power. Factor (Ind.) Full Load: 82.5 3/4 Load: 77 1/2 Load: 66.5 Current (Rated Volt): Full Load: 3.8 Locked Rotor Amps: 25.8 Locked Rotor Power Factor: Locked Rotor withstand Time (Cold Start): Torques: Full Load: 4.5 Ft-Lb Locked Rotor: 8.1 Ft-Lb Starting (Syn.): Ft-Lb Pull-up (Ind.): Ft-Lb Pull-In (Syn.): Ft-Lb Breakdown (Ind.): 14 Ft-Lb Pull-Out (Syn.): Ft-Lb Open Circuit Time Constant: 0.370 Sec. Symmetrical Contribution to 30 Terminal Fault: At 1/2 Cycles: At 5 Cycles: Reactances: Sub-Transient (X'd): Transient (X'd): Synchronous (X'd): AC Stator Resistance: OHMS @ C Rated KVA: KVA Inrush @ Full Voltage & Locked Rotor (Syn.): Code G KVA @ Full Voltage & 95% Speed: % Max Line Current in Stator on 1st Slip Cyc @ Pull-Out: (Syn): Acceleration Time: 54 Sec Motor Only @ Rated Volt. Acceleration Time: Sec Motor & Load @ 85% Rated Volt. Rotor/Field WK2 @ Motor Shaft: Lb-Ft2 Rotation Facing Coupling End: Maximum Number of Starts per Hour: Field Discharge Resistor: OHMS Rated Excitation Field Voltage: DC Resistance of Excitation Field @ 25C: OHMS Excitation Field AMPS @ Full Load & Rated PF: Excitation Field AMPS: Maximum: Minimum: Excitation Field: Rheostate Fixed Resistor Supplied by: Bearing Type: Ball Lubrication: Grease Lube Oil Flow Rate: GPM Supply Pressure: PSIG Total Shaft End Float: Limit End Float to: Motor Rotor: Solid Split Motor Hub: Solid Split For TEWAC & TEIGF Motors: Cooling Water Req'd: GPM Press Drop: PSID CW Temp Rise: C Air Gas Req'd: SCFM Press Maint. In H2O Curves Required Based on Motor Saturation @ Rated Voltage: Speed vs. Torque (Also @ % Rated Voltage) Speed vs. Power Factor Speed vs. Current GENERAL NOTES AND COMMENTS No. A B 0 1 2 Date10/23/06 12/19/06 2/9/07 5/3/07 6/19/07

Total Qty: 1 Sheet 2 of 2 D/S No.: A-B14-TOL-MEE-7510-0101Witness

SHOP INSPECTION AND TESTS Description Required Shop Inspection: Testing Per NEMA: (Routine) MFR Std Shop Tests: Immersion Test: Special Tests: Chevron Spec. GS 12.03B

COUPLING Supplied by: Pump Vendor MFR: Grundfos Model: Motor Half Mounted By: Motor MFR Purchaser PAINTING Manufacturer's Standard Chevron Spec. GS 2.02 ( per GE Clarifications)

Ctreat

SHIPMENT Domestic Export Export Boxing Outdoor Storage over 3 Months OEM PARTS FOR WATERMAKER (WHICH IS EXPORT PACKED) WEIGHTS Shipping Weight: Max Erection Wt: Description: Height:

Net Weight: 76 Lb Rotor Weight: Lb Max Maint. Weight: Lb Dimension: Length: Width:

Lb Lb

REVISION BLOCK Revision Description C'treat issued for review Revise per comments For Construction Final Resubmit for record

Org'd RT RT RT RT RT

Rvw'd Apv'd -

Sheet 6of 6

Pg 12 of 16

ATTACHMENT A

GE MOTORS SPECIFICATIONS AND CLARIFICATIONS/EXCEPTIONS

Page 1 of 4

Pg 13 of 16

GE Consumer & IndustrialCustomer Information: Name Ronny Teoh Company Address: ITT C'TREAT OFFSHORE : 309 BRIAR ROCK ROAD

Date Project Name EBG Quote # Created By Index #

General Electric is pleased to offer the following motor quotation.

: 11-Oct-2006 : CVX-Block14-TambuaLandana-GS12.03-I BC064742 : : HADAGALI, SURESHA (SURESH) : 5374W01

General Description of the AC Motor: (Potable Water Maker High Pressure Pump Motor) Output = 60 HP Synch RPM = 3600 Voltage = 460 Enclosure = TEFC IP & IC Code = IP55, IC411 Load Type =N/A % Eff FL nominal = 95 Phase = 3-Phase Frequency = 60 Shaft Orientation = Horiz. Shaft Hazardous Loc.= Division 2 Class and Group = CL I, 200 C Auto Ignition Temp (T3) Var. Freq. Speed Range= N/A dBA = 82 avg pressure level

Qty =2 total Product Name= ULTRA XSD-841 NEMA Design = B - IEEE Std-841 Features DE E/S & Mtg= D-Flange E/S & GE Type = Premium Efficiency Foot Mounted NEMA Design B, KS D-flange Dia. = 14.0 Ambient Temp. = 40 C Insulation Class = F Service Factor = 1.15 Load Connection= Direct Est. Weight = 1060

Frame Material = Cast Iron Estimated Frame= 364 DE Shaft Extension = TSD Warranty = 5 Years

General Description of the AC Motor: (Boost Pump Motor and 2 Output = 3 HP Synch RPM = 3600 Voltage = 460 Enclosure = TEFC IP & IC Code = IP55, IC411 Load Type =N/A % Eff FL nominal = 89 Phase = 3-Phase Frequency = 60 Shaft Orientation = Horiz. Motor Mounted Vert., Shaft Down Hazardous Loc.= Division 2 Class and Group = CL I, 200 C Auto Ignition Temp (T3) Var. Freq. Speed Range= N/A dBA = 62 max pressure level

nd

Pass Charge Pump Motor)

NEMA Design = B DE E/S & Mtg= C-Face E/S & Round Frame C-face Dia. = 8.5 Frame Material = Cast Iron Estimated Frame= 182 DE Shaft Extension = TC Warranty = 5 Years

Qty= 4 total Product Name= ULTRA XSD-841 - IEEE Std-841 Features GE Type = Premium Efficiency NEMA Design B, KS Ambient Temp. = 40 C Insulation Class = F Service Factor = 1.15 Load Connection= Direct Est. Weight = 76

=================================================================================================== Motor Adders: Service Factor 1.15 IP&IC Code : IP55, IC411 (per RFQ sheet) Access Box Accessory Box/ Condulet (Only for 60HP per spec GS 12.03A) Fasteners: Material Stainless Steel, 300 series (per RFQ sheet) Grease Fittings: Hydraulic & Auto-relief (per RFQ sheet) Terminal Board: Mounting And Conduit Box Location: Special Paint: 3-part Carboline Burndy Hydent Lead Terminals Space Heater Routine test Data pack and others: Data Pack ** (Other testing not included) ===================================================================================================== 5 sets in Main terminal box (per RFQ sheet) F2 (per RFQ sheet) Carbothane 134hg # C 705 (Per data sheet) Burndy Hydent Lead Terminals (Per spec GS 12.01) Thermostat Controlled 110 - 120 V (Only for 60HP per spec GS 12.03A) Non-Witnessed & Report (Per RFQ sheet)

Page 2 of 4

Pg 14 of 16

Clarifications or Exceptions Division 2, Class I Hazardous Locations: Motors are required to be non-arcing, non-sparking, and have surface temperatures under normal operating conditions that are below the ignition temperature of the gas or vapor in that location. The motor is not UL Listed or CSA Certified for Division 2 locations. The motor nameplate will not refer to Division, Class, Group or T-Code to avoid confusion with a Listed or Certified motor for a Division 1 location. RFQ sheet, Data sheet EAL-4400 (A-B14-TOL-DPP-80-ME7510) 2 pages Scotchcast Kit 2130 in cavity: Assuming that this is the requirement of lead cavity sealing. This is not applicable to the requested div 2 motors hence was not considered. Voltage : Quoting 460V rated motor for 480V supply condition per Chevron site requirement HP: Quoting HP as requested through e-mail. Data sheet is considered only to note other requirements AIT: quoting motor for 200 C AIT per general requirement of Chevron site Load Connection: Belting indicated on data sheet was not considered. Assumed direct since half coupling was also requested. Half Coupling: Customers one-piece coupling half can be mounted on the motor shaft at a price adder. The coupling half must be finish machined and key seated and sent transportation prepaid to the factory. Motor vibration characteristics will be measured after coupling installation, however motor will not be rebalanced after coupling assembly. Following specifications are only considered for providing the quotations. Other specifications are not relevant to the motor quotations are not considered: GS-2.02, revision B Paint and Protecting coatings 44 pages Quoting 3 part Carboline paint system, which is very similar to that required by GS-2.02. It includes a primer which is not zinc based, then an intermediate tie coat which is 2 mils thick, an epoxy filler coat which is 5 to 7 mils thick. The top coat is Carbothane 134HG #C705 and is 2 to 3 mils thick. The TFT for this system is 10 mils. Specification: GS 17.01, Rev A , 10/01/01 Basic Equipment Packaging 78 pages. GS-0.03, revision B Preparation for Shipping and Storage 10 pages GE Standard packaging applies. Standard GE Export packaging can be done at a price adder. Protection for extended storage is others responsibility. GS-0.02, Revision B Engineering Documentation 18 pages GS-0.05, revision B Drawing Standards 75 pages Standard data package with motor details per annexure -1 will be furnished. Additional curves at different voltage levels are not included. Drawings will be as per GEs standard design practices GS-12.01, revision B General Electrical Specification for Offshore Facilities 35 pages (Sections 4.3 and 9.1 are only considered) Sec. 4.3: Quoting motor against the spec GS-12.03A as indicated against this section Sec. 9.1.5: Burndy Hydent type lead terminals will be provided with the motors. GS-15.01, Revision B Noise 21 pages Noise level Equipment noise level compliance is others responsibility. Offered motor has average expected no load sound pressure levels as specified above, measured at 3ft from motor surface. Noise value is not guaranteed. Specification: GS 12.03A, Rev B , 8/05 Squirrel-Cage Induction Motors less than 250HP 12 pages. 1. Sec. 2.0: References Proposed motors will be built as per NEMA MG-1 and IEEE 841 with comments and exceptions mentioned herein. 2. Sec. 5.3: Motors were not requested for VFD operation hence was not quoted. 3. Sec. 6.8: See comment on noise requirement above. 4. Sec. 9.3: Efficiency testing is part of Complete Test, option quoted. Exception to penalty described. (Warranty/ Guarantee will be as previously agreed to by GE/ Chevron.) 5. Sec. 11.0: GE provided space heaters are readily de-rated and design for 120V rated volts. Use of 240V rated heaters on 120V will cause inadequate heating. Hence use of 240V rated heater on 120V is not recommended. 6. Sec. 13.0: Warranty and Guarantee per Chevron Texaco / GE alliance agreement IMA042 7. Sec 15.0: Standard GE data pack is included with this order. Included are Motor detail data, outline drawing, electrical diagram, speed torque curve at 100% voltage, and starting limits is included with the price. Additional information if required is extra. Documentation can be furnished through email on request. These are not offered through floppy disks or CD-ROM 8. Sec. 16.0: Standard GE Export packaging N/A. Motor is OEM parts for ITT- Ctreat Offshore.

Conditions of Sale: Warranty and Guarantee per Chevron Texaco / GE alliance agreement IMA042 Current lead times are 50 Days

Page 3 of 4

Pg 15 of 16

Annexure 1The Standard Data Pack contains: 1) Customer, Customer Order Number, GE Requisition Number, GE Job Number, and Distribution list. 2) Special Project Marking / Identification requirements. 3) Motor Model Number, outline drawing number, installation instruction number, and motor nameplate data such as: GE Type, Frame identification, enclosure type, estimated weight, DE and ODE bearing type, horsepower, full-load speed, phases, voltage, frequency, service factor, time rating, maximum ambient temperature, insulation system class, NEMA Design Code (if appropriate), full-load current, full load power factor, maximum KVAR for power factor correction, and NEMA starting code (if appropriate). If the motor is an Energy $aver then both NEMA nominal efficiency and guaranteed full load efficiency will be provided 4) Connection diagrams for motor power and accessories such as heaters, bearing temperature detectors, winding thermistors and thermostats. 5) Outline drawing of the motor. 6) Performance characteristic data including: Motor efficiency, current and power factor at 0, 25, 50, 75, 100, 115 and 125% of load at rated voltage, locked rotor current, locked- rotor torque, full load torque, breakdown torque, power factor at locked rotor, starting limitations, starting time with maximum NEMA inertia, open and short circuit AC time constants, short circuit DC time constant, reactance to resistance ratio, and speed vs. torque and current curves. 7) Motor installation instructions.

Page 4 of 4

Pg 16 of 16

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order No: 4000310118 PO Pkg No.: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Item Number 11 CABGOC Document No.: A-B14-TOL-MEE-7510-0102 SDRL Code: C07 Noise Level Data Sheet

0 ARev No

12/19/06 10/20/06

Revise per comments For Customer Review

RT RT

-

-

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 11 Noise DS Project Number 105312 Date: 19-Dec-06 Rev.: 0 Page 1 of 2

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

Project Location: Offshore Angola, Block 14 Project Number: 65011 2 3 4 5 6 7 8 9 10 11 12 GENERAL EQUIPMENT NOISE

CABGOC Tombua Landana Project

Total Qty: 1 Sheet : 1 of 1 D/S No.: A-B14-TOL-MEE-7510-0102

Service: Potable Water Makers (ME-7510/7511) Sound pressure levels (SPL) in decibels (Reference 0.0002 Microbar) shall be measured 3 feet from major boundary surfaces, excluding minor projections such as conduit boxes and bearing housings, at one-half the vertical height for equipment up to 10 feet high following the standards of ANSI S1.13, Methods for the Measurement of Sound Pressure Levels (SPLs are to be Measured During Normal Operation at Full Load). Specific Worker Location: Other Than 3 Feet Criteria: Exceptions: Also Measure at 50 Percent Load: , 120 Percent Load: , Other Load: Company requirements are listed below. The vendor shall be provided with one copy of this form for each piece of equipment or integrated unit (such as compressor, speed changers, and driver). NA (Not Applicable) has been marked in any manufacturer's requirement section below which does not apply.

13 COMPANY NOISE CRITERIA 14 Maximum Sound Levels for Complete Unit 85 dBA 15 Instructions to Suppliers, Manufacturers, or Equipment Vendors: 16 1. Complete the stock item blanks for both estimate and guaranteed Maximum sound levels in the table below, and complete all items below the table. If these stock item 17 maximum sound levels do not exceed the Company Maximum Criteria, Omit Step 2. 18 2. If the SPL for the Stock Item (i.e., standard design) exceeds Company Maximum Noise Criteria, complete the estimated and guaranteed table portions for special 19 design and with acoustic treatment. The vendor shall describe any special design and acoustical treatment and the costs below the table. 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 No. A 0 NOISE CRITERIA (To be completed by Vendor) Maximum Sound Levels for Complete Unit Preferred Center Frequencies (Hertz) 125 250 500 1000 20006475

63 Estimated 54 45 Stock Items Special Design With Acoustic Treatment Guaranteed Stock Items Special Design With Acoustic Treatment Indicate and describe any directional tendencies of equipment noise: Describe Special Design:

400076

800071

76

74

dBA ,82

(Note 1)

Added Cost: Describe Acoustic Treatment: Added Cost: Equipment Will Not Exceed the Company Maximum Noise Criteria Equipment Will Not Exceed the Guaranteed SPL Listed in the Table Above Supplier, Manufacturer, or Vendor: C'treat Offshore Represented By: Signature:Notes:

We

Title: Date:

1. Noise data is based on previous test data for the same model (FD40) watermaker.

Date 10/20/0612/19/06

REVISION BLOCK Revision Description Issued for ApprovalFor Construction

Org'd RTRT

Rvw'd-

Apv'd-

Page 2 of 2

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order Number: 4000310118 PO Pkg No: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 12 CABGOC Document No: A-B14-TOL-MEE-7510-0021 SDRL Code: C08 Schedule Electrical Equipment in Hazardous Area

ARev No

2/20/07

Issued For Review

RT

-

-

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 16 Schedule Elec Equipment Project Number 105312 Date: 20-Feb-07 Rev.: A Page 1 of 3

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CTREAT JOB No; 105312 - TOMBUA LANDANA CABGOC BLK 14 ANGOLA ELECTRICAL EQUIPMENT IN HAZRADOUS AREA AREA CLADSIFICATION: CLASS I, DIV 2, GROUP D AREA A) POTABLE WATER MAKERS ME-7510/7511ITEM DRAWING IDENTIFIER PBE-8855M/ 8856M PBE-8845M/ 8846M PBE-8850M/ 8851M MANUFACT. MODEL # RATING LAB

MOTORS MOTORS MOTORS

GE GE GE

ULTRA XSD-841 ULTRA XSD-841 ULTRA XSD-841

IEEE-841 IEEE-841 IEEE-841

CSA CSA CSA

ELECTRICAL COMPONENTS IN/ATTACHED TO CONTROL PANEL CP-7510/7511 COND. METER FUSE FUSE HOLDER AI-7510A/ 7511A FU1,2,3,4,5,6 FU1,2,3,4,5,6 ROSEMOUNT FERRAZSHAWMUT FERRAZSHAWMUT ALLEN BRADLEY ALLEN 5A POWER SUPPLY PSL-7510A/ 7511A HS/ES ALLEN BRADLEY ITT-Neodyne ALLEN BRADLEY 1055 ATMR USCC C1/D2/GD C1/D2/GD C1/D2/GD CSA NEC ART. 501 NEC ART. 501 UL/CSA/CE UL/CSA UL UL UL/CSA/CE

INDICATOR A,G,R PLC POWER SUPPLY PRESS. SWITCH PUSHBTN/ E-STOP

800H SERIES C1/D2/GD 1769-L32E C1/D2/GD COMPACTLOGIX 1606series 120AC/24DC 131P SERIES C1/D2/GD C1/D2/GD

800H SERIES C1/D2/GD

Manufacturing Record Book 16 Schedule Elec Equipment Project Number 105312 Date: 20-Feb-07 Rev.: A Page 2 of 3

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

ITEM

DRAWING IDENTIFIER RY SOL-1-5

MANUFACT.

MODEL #

RATING

LAB

RELAY SOLENOID

SQ-D SKINNER7133

TYPE 8501

C1/D2/GD

UL UL

71335SN2GNJ1 C1/D2/GD

B) CHLORINE INJECTION UNIT ZZZ-6700ITEM DRAWING IDENTIFIER PBE-8620 MANUFACT. MODEL # RATING LAB

CL2 INJ. PUMP

LMI

E SERIES

C1/D2/GD

UL

ELECTRICAL COMPONENTS IN CONTROL PANEL CP-6700 INDICATOR R ALLEN BRADLEY SQ-D ALLEN BRADLEY FERRAZSHAWMUT FERRAZSHAWMUT 800H SERIES C1/D2/GD UL/CSA/CE

RELAY RELAY FUSE FUSE HOLDER

RY-1 RY-2 FU1 FU1

TYPE 8501 HLT ATMR USCC

C1/D2/GD C1/D2/GD C1/D2/GD C1/D2/GD

UL UL NEC ART. 501 NEC ART. 501

** End of Document

Manufacturing Record Book 16 Schedule Elec Equipment Project Number 105312 Date: 20-Feb-07 Rev.: A Page 3 of 3

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

CABGOC Tombua Landana Project CABGOC Block 14 Angola FD401-4-2 Potable Water Makers; Chlorine Injection Unit DSME Purchase Order Number: 4000310118 PO Pkg No: ME-220 Equipment Tag No: ME-7510/7511; ZZZ-6700 C'treat Project Number 105312

Document Number 13 CABGOC Document No: A-B14-TOL-MEE-7510-0022 SDRL Code: C09 Description of Operation

0 ARev No

4/30/07 2/9/07

For construction Issued For Review

RT RT

-

-

Date

Description

BY

CHK

APPD

PLAN HISTORY

Manufacturing Record Book 13 Description of Operation Project Number 105312 Date: 30-Apr-07 Rev.:0 Page 1 of 4

309 Briar Rock Rd. The Woodlands, TX 77380-3529 USA Telephone: (281) 367-2800 Fax: (281) 367-1761 www.ctreat.com

PROJECT: Tombua Landana project CABGOC Blk 14 Angola EQUIPMENT: Potable Water Makers; Chlorine Injection Unit TAG: ME-7510/7511: ZZZ-67000 DESCRIPTION OF OPERATION A) POTABLE WATER MAKERS (ME-7510/7511) The Watermakers electrical controls are located in the Control Enclosure (Tag: CP-7510/7511). Within the enclosure is a Programmable Logic Controller (PLC) which contains the logic for startup and shutdown of the system. A copy of the PLC Ladder Logic Diagram will be provided in the system Operating Manual. Depressing the START button starts the system. Refer to Electrical Schematics (Dwg. No. B-B14-TOLMEE-7510-0016) for pushbutton and light descriptions. The control system is designed for continuous operation with no need for routine operator attention. The filter backwash control valves (CV-7510A/B/C; CV-7511A/B/C) cycle automatically from the Programmable Logic Controller. The backwash control valves timing sequence are controlled by the PLC via solenoid valves located on the control panel. (Refer to the Electrical Schematic for details). Backwash of the media filters (MAJ-3981/82/83/84/85/86; MAJ-3987/88/89/90) is sequential. In normal operation, one s