Basic Engineering Design Basis Part-B
of AISHWARYA Project
at Haldia Refinery, IOCL
DOCUMENT No.
A609-00-02-41-ODB-0001
Rev C
Page 55 of 75
Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved
if connected to closed system: ■ yes no
■PSV in IBR steam service shall have installed spare. ■ yes
9.9 Control philosophy for vendor package items
9.9.1 For all vendor package supplies, mode of monitoring, control and logics shall be decided
during detailed engineering Pneumatic based control system for any package shall not be
specified. Instead PLC based system shall be specified.
9.10 Standard Instrumentation:
9.10.1 Packed towers:
(Owner to indicate the preferences)
Local differential pressure indication for each bed: yes ■ no
Local differential pressure indication for total section: yes ■ noControl Room differential pressure indication for each bed: ■ yes no
Control Room differential pressure indication for critical beds: yes ■ no
Control Room differential pressure indication for total section: ■ yes no
1+1 Basket strainers in lines going to packed beds: ■ yes no
Single basket strainers in lines going to packed beds: ■ yes no
9.10.2 Heat Exchangers:
(Owner to indicate the preferences)
Isolation valves at both inlet & outlet in cooling water service: ■ yes no
Isolation valves at only inlet in cooling water service: yes ■ no
Isolation and bypass valves for process side of all exchangers: yes ■ noIsolation and bypass valves for only exchangers which can
be taken out for maintenance when plant is running: ■ yes no
Thermowell at process inlet and outlet of each exchanger : ■ yes no
Local TI at cooling water outlet of each exchanger: ■ yes no
Local TI at process inlet and outlet of each service: yes ■ no
Control Room TI at process inlet and outlet of each service: ■ yes no
Control room PI across exchanger train ■ yes no
PG across each exchanger at inlet /outlet ■ yes no
9.10.3 Utility lines: As a minimum, the following shall be provided in unit utility headers:Table-9.1: Instrumentation for Utility Headers at Unit B/L
UTILITY local
PI
DCS
PI
PAL/
PAH
local
TI
DCS
TI
TAL/
TAH
DCS
FI
FAL/
FAH
DCS
FQ
HP STEAM y y y y y y y y y
MP
STEAM
y y y y y y y y y
LP STEAM y y y y y y
Condensate y
y
y
y
y
y
CW supply y y y y y y y y
CW return y y y y y y y
Instrument y
y
y
y
y
y
Page 102 of 10496