10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department...

14
10/06/04 Project Management 1 Project Management Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK - 9220 Aalborg East Phone: + 45 96358740, e-mail: [email protected] URL: http://www.control.auc.dk/~lpj

Transcript of 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department...

Page 1: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 1

Project Management

Lars Peter JensenAssociated Professor at Aalborg University

Department of Control Engineering

Fredrik Bajers Vej 7C, DK - 9220 Aalborg East

Phone: + 45 96358740, e-mail: [email protected]

URL: http://www.control.auc.dk/~lpj

Page 2: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 2

Contents:

• Managing people:– (Co-operation contract), Team health

assessment

• Project Planning, managing time:– Activity diagram– How long time do we need for a given activity?

- how to make a qualified guess– Project monitoring

• Managing Operations– Roles of leadership– Use of tests to improve leadership

Page 3: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 3

Team assessment

How ’well’ is your Team ?

Self and group exercise on assessment of

Team ”Health Profile”

Page 4: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 4

8X

10X

10X

4X

4X

X X

2X

2X

2X

6X 6X

14X

Total: 70X

Page 5: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 5

How to find X ?

• We need 70 X• There is 6 members of the group• There are 35 half project day until finish

What is X then ?

• X = 35/70 [½project day] = ½ [½project day] ?• X = (35/70)x6 [½man day] = 3 [½man day]

Page 6: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 6

Uge 43

44 45 46 48 49 50 51

dag F m o f m t o f m o f m t o f m o t f m o t f m

Page 7: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 7

Uge 43

44 45 46 48 49 50 51

dag F m o f m t o f m o f m t o f m o t f m o t f m

Problemanalyse 6

Page 8: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 8

Uge 43

44 45 46 48 49 50 51

dag F m o f m t o f m o f m t o f m o t f m o t f m

Problemanalyse 6

Procesanalyse 3

Kravspecifikation 3

Page 9: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 9

Uge 43

44 45 46 48 49 50 51

dag F m o f m t o f m o f m t o f m o t f m o t f m

Problemanalyse 6

Procesanalyse 3

Kravspecifikation 3

Valg af delproces 6

Kodning delproces 2

Kodning delproces 2

Procesmodel 2

Procesmodel 2

Kodning model 4

Test+vurdering 6

Teknologi..+samfund6

Afslutning 6

Page 10: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 10

Roles for Management

• Adize • The Producer (P)• The Administrator (A)• The Developer (D)• The Integrator (I)

If one of these roles isn’t played there is a mismatch in management.

Page 11: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 11

The Producer

• Create results• Is efficient and has both knowledge and high

performance• Has a detailed knowledge to both the trade,

the company and its market, as well as the technology needed to create results

Page 12: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 12

The Administrator

• Makes guidelines and detailed plans for the work and coordinates and control the activities

• Works systematic and has flair for order and details

Page 13: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 13

The Developer

• Thinks ahead (long-term) to lay down the goals develop strategies

• This calls for both creativity willingness to take risks and a watchful eye on new possibilities and threats

Page 14: 10/06/04Project Management1 Lars Peter Jensen Associated Professor at Aalborg University Department of Control Engineering Fredrik Bajers Vej 7C, DK -

10/06/04 Project Management 14

The Integrator

• Creates co-operation, consensus and efficient teams to solve new assignments

• Has both interest and flair for interhuman relations, empathy and both ability and a wish to improve the co-operation among teams