Detailed Project Report for Rail Based Mass Transit System in Varanasi Final Report CHAPTER 10: MAINTENANCE DEPOT February, 2016 Page 101 1 1 0 0 . . M M A A I I N N T T E E N N A A N N C C E E D D E E P P O O T T 10.1 INTRODUCTION The Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur Depot near BHEL for about 56 rakes of 3 car. Since, track connectivity between the two corridors is proposed at Beniabagh, one major depot near BHEL i.e. Ganeshpur Depot is planned to cater to the maintenance requirements of the corridors of Varanasi MRTS. The depots will have infrastructure to maintain the rakes with necessary facilities viz stabling lines, scheduled inspection lines, workshop for overhaul, unscheduled maintenance including major repairs, wheel profiling, heavy interior/under frame/roof cleaning etc. for the rolling stock operational on the corridor as well as maintenance facilities for Civil – track, buildings, water supply; Electrical Traction, E&M; Signalling & Telecomm.; Automatic Fare Collection etc. In broad terms, based on the planned rolling stock requirements, this chapter covers the conceptual design of the following aspects of the Depots. Conceptual design and layout of servicing shed and workshop to provide maintenance facilities and stabling facilities for Rolling Stock. Operational and functional safety requirements. Ancillary buildings for other maintenance facilities. Electrical & mechanical services, power supply and distribution system. Water supplies, drainage & sewerage. The details of the depot are provided on conceptual design basis and will work as a guideline for detailed design later. 10.2 MAINTENANCE PHILOSOPHY The outline of the maintenance philosophy followed would be as below: Typical Maintenance schedules being followed by Bangalore Metro have been considered for determining the requirement of lines in depot. Unit replacement and to get essential repairs to major equipments done by the OEMs.

Transcript of 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia...

Page 1: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐1 

1100.. MMAAIINNTTEENNAANNCCEE   DDEEPPOOTT   

10.1   INTRODUCTION 

The Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath 

Corridor of Varanasi MRTS are proposed  to be provided at Ganeshpur Depot 

near BHEL  for about 56  rakes of 3 car. Since,  track connectivity between  the 

two  corridors  is  proposed  at  Beniabagh,  one  major  depot  near  BHEL  i.e. 

Ganeshpur Depot is planned to cater to the maintenance requirements of the 

corridors of Varanasi MRTS. The depots will have infrastructure to maintain the 

rakes  with  necessary  facilities  viz  stabling  lines,  scheduled  inspection  lines, 

workshop  for  overhaul,  unscheduled  maintenance  including  major  repairs, 

wheel profiling, heavy  interior/under  frame/roof  cleaning etc.  for  the  rolling 

stock operational on  the  corridor as well as maintenance  facilities  for Civil – 

track,  buildings,  water  supply;  Electrical  –  Traction,  E&M;  Signalling  & 

Telecomm.; Automatic Fare Collection etc.  

In broad terms, based on the planned rolling stock requirements, this chapter 

covers the conceptual design of the following aspects of the Depots. 

Conceptual design and layout of servicing shed and workshop to provide 

maintenance facilities and stabling facilities for Rolling Stock. 

Operational and functional safety requirements. 

Ancillary buildings for other maintenance facilities. 

Electrical & mechanical services, power supply and distribution system. 

Water supplies, drainage & sewerage. 

The details of the depot are provided on conceptual design basis and will work 

as a guideline for detailed design later.   

10.2 MAINTENANCE PHILOSOPHY 

The outline of the maintenance philosophy followed would be as below: 

Typical Maintenance schedules being followed by Bangalore Metro have 

been considered for determining the requirement of lines in depot.  

Unit replacement and to get essential repairs to major equipments done 

by the OEMs.  

Page 2: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐2 

Automation  with  state‐of‐the‐art  machinery  to  ensure  quality  and 

reliability. Labour intensive procedures will be kept to the minimum. 

Maintenance  staff  shall  be  given  special  training  to  develop  high‐level 

skills  in  their  trade  to  ensure  quality  and  productivity  in  their 

performance. 

Adequate facilities for the stabling have been provided at the depot. 

To  maintain  high  degree  of  cleanliness,  Automatic  washing  plant  has 

been proposed for cleaning of rakes. 

10.3 PLANNING OF MAINTENANCE FACILITIES SETUP 

The  Rolling  Stock  requirements  in  different  horizon  years  for  the  proposed 

corridors are indicated in Table 10.1: 

           TABLE 10.1: RAKE REQUIREMENT FOR DIFFERENT HORIZON YEARS 

Corridor  Year  2023  2031  2041  Design

BHU to BHEL 

Corridor 

(19.4 km) 

Headway (seconds)  276  228  174  144 

No. of Cars/Train  3  3  3  3 

Rakes Required  21  24  32  38 

Cars Required  63  72  96  114 

Beniabagh 

to Sarnath 

(9.9 km) 

Headway (seconds)  360  258  228  192 

No. of Cars/Train  3  3  3  3 

Rakes Required  10  13  15  18 

Cars Required  30  39  45  54 

 

All  the  systems  and  infrastructure  on  the  proposed  corridors  has  been 

conceptualized considering 3 car trains operating at 144 seconds headway for 

BHU  to  BHEL  Corridor  and  192  seconds  headway  for  Beniabagh  to  Sarnath 

corridor. 

10.4 ROLLING STOCK MAINTENANCE NEEDS 

10.4.1 Maintenance schedule 

Servicing  requirements  shall  be  determined  from  the  Rolling  Stock 

manufacturer.  Depending  upon  manufacturer's  requirements,  servicing 

facilities may  be  provided  to  include  the  ability  to  carry  out  the  inspection, 

maintenance,  overhaul  and  repair  of  the  rolling  stock  fleet,  including  the 

following components: 

Page 3: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐3 

Body; 

Bogies; 

Wheels (Re‐discing / re‐axling is planned at workshop only); 

Traction motors; 

Electrical components; 

Electronics; PA/ PIS 

Mechanical components; 

Batteries; 

Rolling stock air conditioning; 

Brake modules;  

Vehicle doors, windows and internal fittings. 

The  modern,  fully  equipped  facilities  are  to  be  provided  that  meet  these 

requirements efficiently and  in full.  In meeting these requirements,  it shall be 

assumed that the average daily distance travelled by each rolling stock unit  is 

approximately 300 km. The following maintenance schedule has been followed 

for the conceptual design:  

TABLE 10.2: PROPOSED MAINTENANCE SCHEDULE 

Type of Schedule

Interval Work content Locations

Daily  Daily  Check  on  the  train  condition  and 

function  at  every  daily  service 

completion.  Internal  cleaning  / 

mopping  of  floor  and  walls  with 

vacuum cleaner. 

Stabling 

Lines 

A Service 

Check 

5,000 Km 

(approx. 

15 days) 

Detailed  inspection  and  testing  of 

sub  ‐systems,  under  frame, 

replacement/  topping  up  of  oils  & 

lubricants. 

Inspection 

Bays 

B Service 

Check 

15,000 Km 

(approx. 

45 days) 

Detailed inspection of ‘A’ type tasks 

plus items at multiples of 15,000 Km 

(‘B’ type tasks) 

Inspection 

Bays 

Intermediate 

Overhaul 

(IOH) 

420,000 

Km 

(approx. 

3.5 years) 

Check  and  testing  of  all  sub‐

assemblies (Electrical + Mechanical). 

Overhaul  of  pneumatic  valves, 

Compressor.  Condition  based 

Workshop 

Page 4: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐4 

Type of Schedule

Interval Work content Locations

maintenance  of  sub‐systems  to 

bring  them  to  original  condition. 

Replacement  of  parts  and 

rectification, trial run. 

Periodical 

Overhaul 

(POH) 

840,000 

Km 

(approx.  

7 years) 

Dismantling  of  all  sub‐assemblies, 

bogies  suspension  system,  traction 

motor, gear, control equipment, air‐

conditioning  units  etc.  Overhauling 

to bring  them  to original condition. 

Checking repair and replacement as 

necessary. Inspection and trial. 

Workshop 

Heavy 

Repairs 

‐  Changing  of  heavy  item  such  as 

bogies,  traction  motor,  axles,  gear 

cases & axle boxes etc. 

Workshop 

 

The  above  Schedule  may  need  slight  revision  based  on  the  actual  earned 

kilometers  per  train  and  the  specific  maintenance  requirements  of  Rolling 

Stock finally procured. 

10.4.2 Washing needs of Rolling Stock 

The Metro trains are maintained to a high degree of cleanliness and therefore 

needs the maintenance schedule as mentioned in Table 10.3. 

TABLE 10.3: SCHEDULE OF CLEANING 

S.N.  Kind of Inspection  Maint. Cycle Time  Maintenance Place 

1. Outside Cleaning  (wet washing on automatic washing plant) 

3 Days 10 mins 

Automatic washing plantof Depot Single Pass 

2. 

Outside  heavy  Cleaning  (wet washing on  automatic washing plant  and  Front  Face, Vestibule/Buffer  area,  Floor, walls  inside/outside  and  roof. Manually) 

30 days  3 Hrs Automatic  washing Plant & washing line 

    

Page 5: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐5 

10.5   DEPOT CUM WORKSHOP LAYOUT 

Different  options  of  Depot  cum  Workshop  Layout  has  been  explored  to 

optimize the area required for planning the maintenance facilities considering 

1in 7 turnouts, 1 in 5 turnouts in place of 1 in 7 turnouts and depot layout on 

elevated infrastructure. The three options are discussed as below: 

Option 1: At Grade Layout Plan with 1 in 7 turnouts 

Option‐1 of depot    layout  is proposed with a curve and ramp down  to depot 

entry at grade level as shown in Annexure‐10.1. This layout has been planned 

with all the required facilities in an area of about 13.2 hectares considering 1 in 

7 turnouts and a minimum radius of 120m.  

Option 2: At Grade Layout Plan with 1 in 5 turnouts 

Option‐2 of depot  layout  is proposed with  1  in  5  turnouts  instead of  1  in  7 

turnouts  similar  to maintenance  depot  constructed  in Mumbai Metro.  The 

layout plan in option‐2 is proposed in an area of about 12.5 hectares indicating 

all  the  infrastructure  facilities as  shown  in Annexure‐10.2. This option offers 

the advantage of reduction in the land requirement for the depot i.e. about 0.7 

hectares in comparison to layout in option‐1. Since, the depot constructed for 

Mumbai Metro has been approved with certain restrictions and has not been 

tested for its efficient and proper functioning. Thus, depot layout in option‐ 2 is 

not recommended for Varanasi Metro Corridor. 

Option 3: Elevated Layout plan with 1 in 7 turnouts 

Option‐3 of the depot Layout  is proposed with elevated  infrastructure  in two 

levels  along  the  BHEL  station  as  shown  in  Annexure  10.3(a).  Some  of  the 

facilities in the depot viz. stabling lines, automatic coach wash plant, pit wheel 

lathe, ETU  shed have been proposed elevated at a height of 13m and other 

maintenance and inspection facilities have been proposed at ground level. The 

ground  level  plan  and  the  upper  level  plan  for  the  depot  are  shown  in 

Annexure 10.3 (b) and (c). The properties/buildings along the corridor have to 

be  acquired  for  this  option.  Land  Cost  including  solatium  is  21.85  Crore/ 

hectare.  Also, the construction of elevated depot shall have an additional cost 

implication of Rs 44 crore per hectare for the elevated portion.  

In  view  of  above  and  considering  the  cost  implications  and  acquisition  of 

Page 6: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐6 

properties/buildings along the corridor for option‐3, it recommended to adopt 

depot layout in option‐1 for Varanasi Metro Corridor. 

The rake induction and withdrawal from depot to the open line will have to be 

so planned  that  the headway of open  line  is not  affected.  For  this purpose, 

facilities  for  simultaneous  receipt and dispatch of  trains  from depot  to open 

line should be created. The stabling area should be  interlocked with the open 

line so that the induction of train from the stabling can be done without loss of 

time.  The  rake  washing  can  be  done  at  automatic  coach  washing  plant 

provided at the entry of depot i.e. before rake is placed on stabling lines. 

The other movements in the depot, viz from the stabling to the inspection shed 

or workshop and vice versa may be non‐interlocked. Two emergency re‐railing 

lines  have  been  provided  from  which  emergency  rescue  vehicles  can  be 

dispatched  to open  line  in  the event of any emergency. To cater  to  the peak 

requirements, all trains would be in the service, only trains under maintenance 

would  be  in  the  shed.  However  during  the  off‐peak  hour  in  daytime, 

approximately  half  of  the  trains  will  be  withdrawn  from  the  service.  The 

scheduled inspections are envisaged to be carried out during the day off‐peak 

hours and night. Tower wagon shall be housed inside the ETU cum emergency 

rerailing building along with the Accident Relief Train.  

The  stabling  and  the  yard  layout  would  be  at  grade  level  for  least  power 

requirements in shunting movements and to avoid accidental rolling of Rolling 

Stock resulting into accidents and damages to the property 

10.6 INFRASTRUCTURE FACILITIES PLANNED AT DEPOT 

 

10.6.1. Inspection Lines and Workshop Lines in Depot 

As per the frequency of  inspections  indicated  in Table 10.2, the visits of rakes 

to Depots are as shown below in Figure 10.1: 

To  assess  the  number  of  lines  required  to  maintain  the  rakes,  following 

assumptions are made: 

 

i. For Washing of rakes, an automatic washing plant  is proposed. Hence, no 

separate washing line is needed exclusively for washing. However, one line 

Page 7: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

De

Fina

    

etailed Project 

al Report 

                           

is

in

 

 

 

 

 

 

 

 

 

 

 

ii. In

iii. In

iv. Ba

da

As  a

inspe

 

TAB

Sche

Insp

A SeChec

B SeChec

Adju

Insp

Report for Rai

   

                          

  provided

nside/outsid

FIGU

n a day, two

n a day, one

ased on the

ays are take

No. of day

No. of Sun

No. of ava

gainst  abo

ection of the

BLE 10.4: IN

edule Totper7

pection She

ervice ck 

ervice ck 

ustment line

pection Line

l Based Mass T

 

                          

  for  heav

de and roof

RE 10.1 RA

o rakes are t

e rake is tak

e number o

en as 300 fo

ys of Public 

ndays in a y

ailable work

ove  require

e rakes for V

SPECTION A

tal visits r rake in  years 

v/

112 

54 

e for minor 

s Provided

Transit System i

     

     February, 20

vy  cleanin

).   

AKE VISITS T

taken for ‘A

en for ‘B ch

of holidays a

or calculatin

holidays in 

year 

king days in 

ement,  the

Varanasi Me

AND WORK

METRO C

Avg. visits /year

TotAris(forrak

16  89

7.71  43

repair/test

in Varanasi 

                      

016                     

g  (Manua

TO DEPOTS 

A check’ on a

hecks’ on a p

as given bel

ng the requi

a year

a year

e  infrastruc

etro corrido

KSHOP LINE

CORRIDORS

tal sing r 56 es) 

LiOccu

96  2 rada

32  1 rada

ting after PO

           CHAPTER

                          

l  cleaning

AND WORK

a pit line. 

pit line. 

low, total n

irement of 

 :   13 

 :   52 

 :  365 ‐ 6

cture  provi

ors is indica

ES PROVIDE

ne pancy 

LRe(le

kes/ ay 

kes/ ay 

OH 

R 10: MAINTEN

                         P

g  of  Floor

KSHOPS 

umbers of 

lines. 

65 = 300 day

ided  for  S

ted in Table

ED FOR VAR

Lines equired (3 car ength) 

LiPr(6le

1.49 

1.44 

ANCE DEPOT 

Page 10‐7 

r,  walls 

working 

ys. 

Schedule 

e 10.4. 

RANASI 

nes rovided 6 car ength) 

Page 8: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐8 

Workshop Shed 

IOH  1  0.14  7.84 1 rake 10 days  0.261  1 

POH  1  0.14  7.84 1 rake 20 days  0.523  1 

Unscheduled Repair / Lifting /Wheel/Bogie sections etc.  2 

Workshop Lines Provided  4 

 

Ganeshpur  Depot  will  have  maintenance  facilities  and  infrastructure  to 

maintain 56 rakes of 3 car  length  for  the Varanasi Metro corridors. Based on 

the calculations  indicated  in Table 10.4, the depot  is proposed to be planned 

with 3 inspection lines and 4 workshop lines.  

10.6.2. Stabling Facility for Rakes 

The  rake  requirement  for  the  corridors  of Varanasi Metro  viz.  BHU  to  BHEL 

corridor and Beniabagh to Sarnath corridor  is 38 rakes of 3 car  length and 18 

rakes of 3 car length respectively (Total 56 rakes of 3 cars i.e. 168 coaches) for 

ultimate design. Ganeshpur depot near BHEL is planned with stabling facility of 

12 lines of 9 car length each (to stable three rakes of 3 car on each line). Hence, 

the depot will have stabling facility for 108 coaches. 

In  addition  to  the  above  stabling  facility,  the  terminal  stations  viz.  BHU, 

Beniabagh  and  Sarnath  have  been  also  planned   with  stabling  facility  for  4 

rakes,  4  rakes  and  2  rakes  respectively.  At  a  given  time,  three  rakes would 

remain  under  inspection  and  the  remaining  rakes  will  be  stabled  at  the 

platforms of the terminal stations for the start of early morning services. 

Hence,  there will be  sufficient  stabling  facility  for 56  rakes of 3  cars  i.e. 168 

coaches and the depot will have sufficient facilities to cater to the maintenance 

requirements of the rolling stock operational on the Varanasi MRTS corridors 

for the ultimate design.  

10.7 DEPOT CUM WORKSHOP PLANNING 

As per  the dimensions of  the Rolling  Stock,  the  approximate  length of 3‐car 

trains would be 65 m (approx). However  in the design of the Inspection shed, 

workshop  lines  and  stabling  lines  at  depot,  length  of  6‐car  train  is  taken  in 

consideration.  

 

Page 9: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐9 

 

I) Stabling Lines in Depot 

For the design of the stabling lines in the depot, following approximate lengths 

have been taken in consideration: 

(i) Length of one 3‐car rake= 65 m 

(ii) Gap between two 3 car trains= 10m 

(iii) Free  length  at  outer  ends  of  the  rake  (  for  cross  pathway,  Signal  and 

Friction buffers)= 10m each side 

(iv) Total  length  of  Stabling  line  =  (iii)+(i)+(ii)+(i)+(ii)+(i)+(iii)=  10+ 

65+10+65+10+65+10= 235 m (say 240m)  

Looking  to  the  car  width  of  2900  on  Standard  Gauge,  5m  Track  Centre  is 

proposed  for  all  the  stabling  lines.  Thus,  space  between  stabling  shall  be 

sufficient  to  include a pathway  to be  constructed between  tracks  to provide 

access for internal train cleaning and undercarriage inspection.  

50% of stabling lines shall be covered with a roof in order to facilitate testing of 

air  conditioning of  trains and  their pre‐cooling under  controlled  condition of 

temperature. 

II)  Inspection Lines in Depot 

For the design of the Inspection Bay Lines in the depot, following approximate 

lengths  have  been  taken  in 

consideration: 

(i) Length of one 3‐car rake= 65 

m (approx) 

(ii) Gap between two 3 car 

trains= 10m 

(iii) Cross path at each end = 10 m  

(iv) Total length of Inspection line 

= (iii)+(i)+(ii)+(i)+(iii)= 10+ 

65+10+65+10 = 160m 

The inspection bay in Ganeshpur Depot shall be of 160 X 23.5m² size with three 

inspection  lines having sunken  floor. The  track spacing between  the adjacent 

inspection Bay Lines shall be 6.25 m. 

There  would  be  lighting  below  the  rail  level  to  facilitate  the  under  frame 

Page 10: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐10 

inspection. Ramps of 1:8 slopes, 3 meter wide should be provided with sunken 

floor  system  for  movement  of  material  for  the  cars.  Further,  3.5  m  cross 

pathways are left at each end for movement of material by fork lifter/ Leister/ 

Hand  trolley.  Stinger  system  shall  be  provided  for  750V  DC  traction  power 

supply to the rolling stock. 415V 3 phase 50 Hz, 230V 1 phase 50 Hz AC supply 

and  Pneumatic  supply  shall  also  be made  available  on  each  inspection  shed 

columns. Air‐circulators shall be provided on each column.  

Roof  and walls  shall  be  of  such  design  that  optimum  natural  air  ventilation 

occurs all the time and sufficient natural light is also available. Each Inspection 

bay will also have arrangement close by for cleaning of HVAC filter under high 

pressure water jet. 

III)  Workshop in depot 

The  size  of  the  workshop  shed  in 

Depot shall be 160 x 44.5 m² each and 

an  additional  covered  space  of  160  x 

7.5 m² shall be provided in the depots 

to  cater  for  offices  cum maintenance 

sections,  costly  item  store,  locker 

room,  toilet etc. Following equipment 

repair/overhaul  facilities  are  planned 

in the workshop. 

Body furnishing.   

Bogie.     

Wheels.     

Traction Motor 

Axle box and axle bearing   

Pentograph.     

Electrical  equipment  like  transformer,  converter/inverter,  circuit 

breaker, relays.   

Battery.       

Air compressor.           

Air conditioning equipments.          

Brake equipment.         

Door actuators.           

Page 11: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐11 

Control and measuring equipments.     

Pneumatic equipments 

Dampers and Springs 

Couplers/ Gangways   

Cross track equipped with bogie turntables have been provided for movement 

between bays.   

IV) Pit Wheel Lathe  

A  separate  building  is  planned  for 

housing  pit  wheel  lathe  (PWL)  for  

Ganeshpur  Depot  which  is 

approachable  from  workshop,  ins 

pection bay and stabling  lines through 

rail and road for placement of cars for 

re‐ profiling of wheels within the depot 

along with space for depot of scrap. 

 

V) Engineering Train Unit Workshop 

Since  the  workshop  cum  depot  is 

designed optimally, it would not be wise 

to waste  its capacity  in maintaining the 

other  than  passenger  Rolling  Stock 

vehicles. Carrying  these  vehicles  to  the 

inspection shed affects the Rolling Stock 

maintenance  as  shunting  is  also 

involved.  Therefore,  other  vehicles  like 

rail  cum  road  vehicle,  tower  wagons, 

etc. may be housed and given required inspection attention in a separate shed 

called  ETU workshop,  for which  2  lines  have  been  provided  in  the  depots. 

However  for  the  heavy  lifting  needs,  these  vehicles may  be  taken  to main 

workshop for required attention. 

VI) Car Delivery Area 

The newly procured  coaches, which are  transported by  road,  shall  reach  the 

Depot‐cum Workshop by the road on trailers. To unload the coaches and bring 

them to the track, provision of space, along the side of shunting neck, has to be 

Page 12: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐12 

made for unloading of cars and other heavy materials. There should be enough 

space  available  for  movement  of  heavy  cranes  for  lifting  of  coaches.  The 

unloading area should be easily accessible for heavy duty hydraulic trailers. 

VII)  Automatic Coach Washing Plant (AWP)  

Provision to be made for Rolling Stock exterior surfaces to be washed using a 

fully  automated  Train  Washing  System  with  a  throughput  capacity  of 

approximately  six  trains  per  hour.  The  AWP  shall  be  situated  at  such  a 

convenient point on the incoming route so that incoming trains can be washed 

before  entry  to  the  depot  and  undesirable movement/shunting  over  ingress 

and egress routes within the depot is avoided.  

VIII) Test Track 

A test track of 630 mts. length will be provided beside workshop in Ganeshpur 

Depot.  It  shall be equipped with  signaling equipments  (ATP/ATO).  It  shall be 

used  for  the  commissioning of  the new  trains,  their  trials  and  testing of  the 

trains after the IOH and POH. In compliance to safety norms, the boundary of 

the  track  shall  be  completely  fenced  to  prevent  unauthorized  trespassing 

across or along the track. 

IX) Internal Cleaning Shed 

Monthly  heavy  cleaning  of  interior walls,  floors,  seats, windows  glasses  etc, 

outside heavy cleaning, Front/rear Face, Vestibule/ Buffer area, outside walls 

and  roof  shall  be  done manually  in  the  interior  cleaning  plant  designed  for 

cleaning  of  one  at  a  time.  A  line  adjacent  to  inspection  shed  should  be  so 

provided that placement of rakes is possible from workshop or inspection lines 

& vice – versa conveniently and with ease. 

X) Train Operators Booking Office 

Suitable office  facility adjacent  to  the  stabling  lines at each depot  should be 

provided  so  that  train  operators  reporting  ‘On’  duty  or  going  ‘Off’  duty  can 

obtain  updates  regarding  ‘Special  Notices’,  ‘Safety  Circulars’  and  other 

technical updates/information in vogue. These offices should have an attached 

cycle/scooter/car stand facility for convenience of the train operating staff. 

XI) Administrative Building 

An  administrative  building  close  to  the main  entrance  is  planned.  It  can  be 

suitably sized and architecturally designed at the detailed design stage. A time 

and security office is also provided close to main entrance. It shall be equipped 

Page 13: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐13 

with suitable Access control system for all the staff working in the complex. 

XII) Operation Control Centre and Depot Control Centre 

Control  of  train  operation  will  be  done  centrally  from  Operations  Control 

Center  (OCC),  which  will  house  Traffic  Control  Centre,  SCADA  System  for 

Traction Power Control & Monitoring, SCADA System for Auxiliary Power, VAC 

Control  & Monitoring,  Telecommunication,  CCTV  Control  & Monitoring  etc. 

Movement of trains inside depot shall be controlled from Depot Control Centre 

(DCC) located inside the depot. 

XIII) Parking Facilities 

a)  Ample  parking  space  shall  be  provided  for  the  two  wheelers  and  four 

wheelers at the   following points. 

i)   Close to the depot entry. 

ii)  Close to the stabling lines. 

iii) Close to the Workshop/ IBL. 

b) Space for parking of road and re‐railing equipments 

Enough  space  for parking of  road  vehicle/  trailers/  trucks etc.  Enough  space 

will also have  to be earmarked adjacent  to workshops. Similarly, provision of 

space  for parking of  re‐railing equipments will have  to be made close  to  the 

main exit gate of the Depot. 

XIV) Watch Towers 

There shall be provision of adequate number of watch towers for the vigilance 

of depot boundary. 

XV) Power Supply 

An auxiliary substation of 2500 KVA capacity has been planned for catering to 

the power supply requirement of the depot. Details of connected load, feeder 

may be worked out during detailed designing stage. 

XVI)   Standby Power Supply 

The  standby  power  supply  is  proposed  through  silent DG  set  of  2X320  KVA 

adequate capacity to supply all essential loads without over loading.  

XVII) Compressed Air Supply 

Silent  type  compressor  units  shall  be  suitably  installed  inside  the  depots  at 

convenient  location  for  the  supply  of  compressed  air  to  workshop  and 

Inspection sheds. Thus, the pneumatic pipeline shall run within the workshop 

Page 14: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐14 

and  inspection  bays  as  to  have  compressed  air  supply  line  at  all  convenient 

points. 

XVIII)  Water Supply, Sewerage and Drainage Works 

In  house  facilities  shall  be  developed  for  the  water  supply  of  each  depot. 

Sewerage,  storm water drainage  shall be given due  care while designing  the 

depots for efficient system functioning. Past records of Municipal Corporation 

shall be used  to design  the drainage  system. Rainwater harvesting would be 

given due emphases to charge the underground reserves. 

10.8 PLANT AND MACHINERY 

Plant  and machinery  proposed  for  the maintenance  facilities  at  Ganeshpur 

depot have been listed in Annexure 10.4 

 

 

Page 15: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐15 

Annexure 10.1 

LAYOUT PLAN FOR GANESHPUR DEPOT‐ OPTION 1 

 

Page 16: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐16 

Annexure 10.2 

LAYOUT PLAN FOR GANESHPUR DEPOT‐ OPTION 2 

 

 

Page 17: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐17 

Annexure 10.3(a) 

LAYOUT PLAN FOR GANESHPUR DEPOT‐ OPTION 3

Page 18: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐18 

Annexure 10.3(b) 

LAYOUT PLAN FOR GANESHPUR DEPOT‐ OPTION 3 (Upper Level‐Elevated) 

 

 

Page 19: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐19 

Annexure 10.3(c) 

LAYOUT PLAN FOR GANESHPUR DEPOT –OPTION 3 (Lower Level‐ Ground)

Page 20: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐20 

Annexure 10.4 

LIST OF MAJOR PLANT AND MACHINERY FOR BHEL DEPOT 

Sno.  PLANT & MACHINERY  Quantity 

A.  MATERIAL HANDLING   

  Travelling over head EOT cranes for workshop 15/2T  2 

  Travelling over head EOT cranes for workshop 3.2T (Future)  2 

  Travelling over head EOT cranes for inspection bay 1.5T  2 

  Travelling over head EOT cranes for ETU shed 5T  1 

  Jib crane for workshop 3 T  2 

  Synchronized pit jacks system for car lifting  2 

  Car body stands for keeping 6 car shells  36 

  Dummy bogies  6 

  Mobile lifting jacks‐15T (Nos)  12 

  Mobile lifting jacks 10T (Nos) (Future)  24 

  Battery powered locomotive  1 

  Road mobile Crane 5T cap  1 

  Fork lift truck 3T cap  2 

  Fork lift trucks 2T cap  2 

  Pallet  trucks  4 

  TATA Truck  1 

  Scissors type lifting trolley  ‐ 2T capacity  2 

  Hydraulic trolleys ‐ 2T capacity  2 

B.  Wheel shop   

  500T wheel press  1 

  Vertical boring m/c (Turret Lathe)  1 

  Multipurpose Wheel  Lathe  1 

  Axle turning lathe  1 

  Axle UST inspection machine  2 

  Radial drill m/c  1 

  Induction Heater  2 

  Bearing/Coupling Extractor  4 

Page 21: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐21 

Sno.  PLANT & MACHINERY  Quantity 

C.  Bogie shop   

  Bosch Tank : Bogie wash/cleaning plant  1 

  Bogie static load testing m/c  1 

  Shock absorber testing m/c  1 

  Spring scragging &testing m/c  1 

  Magnaflex crack detector  1 

  Glowcheck crack detector  1 

D.  Rotating m/cs   

  Baking Oven  1 

  Dynamic balancing  1 

  Traction  motor test console  1 

  Motor compressor test bench  1 

  Tan Delta testing instrument  1 

E.  Other m/cs   

  Re‐railing equipment  1 

  Mobile Wheel Turning Lathe  1 

  Chip crusher and conveyor for pit wheel lathe  1 

  Automatic Washing plant for Metro cars.  1 

  High‐pressure washing pump for front and rear end cleaning  1 

  Turn table for one car  1 

  Turntable for bogies  4 

  Driving Cab Simulator  1 

  Water de‐mineralizing plant (Distillation plant)  2 

  Painting booth for separate parts  1 

  Floor cleaning machine  4 

  Welding equipments  5 

  Compressor 500Cfm  2 

  DG set  320 KVA  3 

  Battery charger  2 

F.  Machine shop   

  Guillotine  Shearing  m/c  1 

Page 22: 10. Maintenance Depot 12.02.2016 finalThe Maintenance facilities for BHU to BHEL Corridor and Benia Bagh to Sarnath Corridor of Varanasi MRTS are proposed to be provided at Ganeshpur

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                CHAPTER 10: MAINTENANCE DEPOT 

                                                                                        February, 2016                                                                        Page 10‐22 

Sno.  PLANT & MACHINERY  Quantity 

  Shearing, punching & cropping  1 

  Universal tool cutter & grinder  1 

  Vertical surface grinder  1 

  Centre lathe 2m bed  1 

  Centre lathe 1m bed  1 

  Radial drill m/c  1 

G.  Test Benches/Instruments   

  Pneumatic test bench  1 

  Brake test bench  2 

  SPM test bench  2 

  Door test bench  2 

  Inverter test bench  1 

  Other test benches (MCB, RMPU etc.)  1 

  Oscilloscope  1 

H.  Furniture/material storage/Small tools   

  Vertical storage system for DCOS store  1 

  Computer MMIS with LAN connectivity  1 

  Storage racks  LS 

  Industrial furniture  LS 

  Electric and pneumatic tools  LS 

  Measuring and testing equipments  LS 

  Tool kits  LS 

  Mobile safety steps  10