25 Common Problems
for M&E Engineers
Armada Hotel , Petaling Jaya
26th May 2011
5 Common Contract
Management Problems
Ir. Looi Hip Peu
Hon Sec, ACEM (2010/11)
B.Eng (Hons) (Electrical)
P.Eng (5226), Jurutera Gas
-
26th May [email protected]
CONTENT2
Objectives of this Workshop
Mismatch in Main & Sub Contract
Confusion on BQ and Lump Sum
No Proper Work Acceptance Procedure
Acceptance of Products against System
PAM 1998 and PAM 2006 Contract Forms
-
What are the Objectives of this Workshop?
In the Malaysian context, M&E engineers are usually
responsible for managing the M&E portion of the
construction contract.
This responsibility frequently include:
1. Cost consulting
2. Contract drafting
3. Contract management
4. Works supervision and cost finalisation
The requires a basic understanding of (construction)
contracts and good understanding of cost
OBJECTIVESOF WORKSHOP3
26th May [email protected]
-
This Workshop Module List 5 Common Problems !
1. Mismatch between Main Contract & Sub Contract
2. BQ contract and Lump Sum Contract
3. Failure in Contract Management
4. Shorting Comings in Work Acceptance
5. Interim Payment and Final Payment
OBJECTIVESOF WORKSHOP4
26th May [email protected]
-
26th May [email protected]
-
Contract draf t ing.
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH6
1. The QS is responsible for drafting Main
Contract.
2. The M&E Engineer is responsible for
drafting M&E Sub Contracts.
-
Common procedure in Cont ract Draf t ing.
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH7
QS decide
Contract Form
M&E checks with
QS on
Contract Form
M&E Draft M&E
Sub Contract
based on Form
PAM 1998
PAM 2006
JKR 203
PAM 2006 NSC
JKR 203N
PAM 1998 NSC
-
Select ing the Cont ract Form.
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH8
Private
or
Public ?
JKR Contract Form
PAM Form
Sector
?
FIDIC, Other Forms
Government
Private
Building
Industry
Type?
PAM 1998
PAM 2006
-
Select ing the Cont ract Form.
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH9
Contract Based on BQ
Large / Complex
BQ or
Lump
Sum?
PAM/JKR Form
Selected.
Simple / Well Defined
Contract Based on Drawings
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH10
However the problem is not mismatch inContract Form but in draf t ing Main and SubContract wi th compat ib le terms!
QS decide
Contract Form
M&E checks with
QS on
Contract Form
M&E Draft M&E
Sub Contract
based on Form
M&E checks with
align in NSC
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH11
in Main Cont ract?
Nominated Sub Contract (PAM Form 2006):
Sub Contract is made pursuant to the agreement
for (hereinafter referred to
as Main made
between the of (or whose registered
office or business address is situate at) (hereinafter called the and the
Contractor.
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH12
in Main Cont ract?
Nominated Sub Contract (JKR 203N):
WHEREAS the Contractor has entered into a Contract
No: made the (hereinafter referred to as Main
between the Government of
(hereinafter called of the one part
and the Contractor of the other part for the .
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH13
Contract Management Issues:
1. Defects Liability Period
2. Date of Commencement
3. Liquidated & Ascertained Damages (LAD)
4. Completion & Sectional Completion (if applicable)
5. Period of Interim Certificate
6. Percentage of certified value retained
7. Limit of retention sum
8. Period of Final Measurements.
9. Insurances
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH14
Main specific responsibilities defined:
1. Ascertaining from NSC coordination information;
2. Providing coordination information; setting out ,
dimensions etc.
3. Making good and touching up damages due to NSC
works (this may sometimes be loaded under NSC).
4. Providing space ONLY for storage & accommodation.
5. Water supply, electricity supply (including charges).
6. Protection, covering, watching, security of NSC fittings
7. Removing rubbish off site.
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH15
Nom sub specific responsibilities:
1. Insurances (where his responsibility ends);
2. Providing coordination information; setting out
dimensions to main contractor etc.
3. Making good and touching of damages due to NSC
works (caveat; NSC is not qualified to rectify
works.
4. Consumption charges for water supply, electricity
supply.
5. Provision of water, energy, electricity for
commissioning.
6. Keeping site clean in coordination with MC.
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH16
Contract Management Issues:
1. Defects Liability Period cited is different in MC & NSC
2. LAD not cited in NSC
3. Responsibility for provision of water, electricity and
energy for construction and commissioning not
clearly cited or is different between MC & NSC.
4. Overlapping provision of insurance
5. Completion or Sectional completion not clearly stated.
6. Periods for interim & final certifications mismatch
standardised.
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH17
CONCLUSION
QS decide
Contract Form
M&E checks with
QS on
Contract Form
M&E Draft M&E
Sub Contract
based on Form
M&E checks with
in NSC
Modification to
Main Contract
terms must be
reflected in NSC
-
26th May [email protected]
MAIN & SUB CONTRACTSMISMATCH18
LASTRESORT
The tenderer is supposed to check at tender
JKR 203 & PAM:
the Nominated Sub Cont rac to r has hadreasonab le oppor tun i t y to examine and have fu l lknowledge o f a l l p rov is ions o f the Main Cont rac t(excep t the deta i l s o f t he p r i ces inc luded
The above does not det rac t f rom the respons ib i l i t yof the pro fess iona l M&E engineer to draf t aproper ly coo rd inated tender document.
-
26th May [email protected]
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT20
M&E Consul tants are responsiblefor draf t ing descr ipt ion of i temsto be tendered.
Descr ipt ion of works or Bi l l of Quant i t iesare important documents which wi l ldetermined how cont ract are pr iced,var iat ion cost determined and f inalaccountsor measurementsf ixed.
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT21
Contract Based on BQ
Large / Complex
BQ or
Lump
Sum?
PAM/JKR Form
Selected.
Simple / Well Defined
Contract Based on Drawings
C o n t r a c t w i t h
Q u a n t i t i e s
C o n t r a c t w i t h o u t
Q u a n t i t i e s
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT22
M&E Consu l tan ts are respons ib le fo rdraf t ing descr ip t ion o f i tems to betendered.
Bill of Quantities (BQ) is a document detailing the qualitativeand quantitative aspects of every constituent parts of aproposedconstructionproject.
Qualitative: Description of material, labour andworkmanshipfor the work
Quantitative: Quantity of material, labour andworkshopHackett& Robinson(2003) andChan(2002)
It is compiled together with the form of tender, specification,preliminarybill and list of drawingsto form a tender document.
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT23
Contract based on quant i t ies
1. Price is based on quantit ies and is subject to finalre-measurementson completion.
2. Variations means difference due to designschematics, concepts or addition in scope (i.e.additional system not in drawings).
3. Variations valid only on instructions.
4. BQ form the basis of Contract Works.
5. Specif ications determines the qualitative aspectof works.
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT24
Lump Sum Contract
1. ContractPriceis firm andshallnot be subjectto revision.
2. Variationsonly on instructions.
3. Drawings form the basis of Contract Works (determiningthe contract drawings before contract binding is thereforeimportant).
4. Specificationsdeterminesthe qualitative aspectof works.
5. BQor pricescheduleaugmentdrawings.
6. Variations and final account is determined by comparisonwith ContractDrawingsand final As-Built (howeverchangesfrom ContractDrawingscan only claimed Variationsbasedon AI).
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT25
rates Total CostQuantity
-
26th May [email protected]
BQ AND LUMP SUM CONTRACT26