(1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor -...

36

Transcript of (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor -...

Page 1: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 2: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 3: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

225

mm

min

(1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 2011

THERMAL PERFORMANCE CHECKLIST (TICK ALL)

AIR BARRIER - CONTINUITY CHECKLIST (TICK ALL)

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Floor insulation to tightly abut blockwork wall

Ensure wall insulation is installed at least 225 mm below top of floor insulation

Seal between wall and floor air barrier with a flexible sealant OR seal gap between skirting board and floor with a flexible sealant

Seal all penetrations through air barrier using a flexible sealant

GENERAL NOTES The wall insulation installed below the wall DPC must be fit for purpose with regards to water absorption

Keep cavities clean of mortar snots and other debris during construction

Detail applicable:- Ground-bearing floor; raft foundation; in-situ suspended ground floor slab; pre-cast suspended ground floor. Insulation above slab, with timber floor finish

OPTION (TICK ONE)

Complying with checklist will help achieve design air permeability

AIR BARRIER - OPTIONS

Masonry inner leaf with wet-finish plaster, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Airtightness membrane and tapes

ACCEPTABLE CONSTRUCTION DETAIL Ground Floor - Insulation above slab DETAIL 1.01a, 2011

Page 4: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Ensure wall insulation is installed at least 225 mm below top of floor insulation

Ground Floor - Insulation above slab plus lightweight block

Seal all penetrations through air barrier using a flexible sealant

The wall insulation installed below the wall DPC must be fit for purpose with regards to water absorption

Floor insulation to tightly abut blockwork wall

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Seal between wall and floor air barrier with a flexible sealant OR seal gap between skirting board and floor with a flexible sealant

Ground Floor - Insulation above slab

Detail applicable:- Ground-bearing floor; raft foundation; in-situ suspended ground floor slab; pre-cast suspended ground floor. Insulation above slab, with timber floor finish

Keep cavities clean of mortar snots and other debris during construction

DETAIL 1.01b, 2011

Ensure block with a maximum Thermal Conductivity of .20 W/mK in the direction of heat flow is used and that block is suitable for use in foundations in all conditions. Block is to be installed so to avoid any effect of moisture on Thermal Conductivity

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

225

mm

min

DETAIL 1.01b, 2011

Page 5: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 6: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 7: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 8: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Seal gap between skirting board and floor with a flexible sealant

Seal between the wall air barrier and the top and underside of the floor slab. (Dotted blue line is notional, to depict air barrier continuity through floor zone)

Seal all penetrations through air barrier using flexible sealant

Keep cavities clean of mortar snots and other debris during construction

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Continue cavity wall insulation across floor abutment zone

Ensure continuous mortar bed between floor slab and top of blockwork wall

DETAIL 1.04, 2011Concrete Intermediate Floor within a dwelling

Concrete Intermediate Floor within a dwelling

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

DETAIL 1.04, 2011

Page 9: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Seal gap between skirting board and floor with a flexible sealant

Seal between the wall air barrier and the top and underside of the floor slab. (Dotted blue line is notional, to depict air barrier continuity through floor zone)

Seal all penetrations through air barrier using flexible sealant

Keep cavities clean of mortar snots and other debris during construction

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Continue cavity wall insulation across floor abutment zone

Ensure continuous mortar bed between floor slab and top of blockwork wall

DETAIL 1.04a, 2011Concrete Intermediate Floor between dwellings

Concrete Intermediate Floor within a dwelling

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

DETAIL 1.04a, 2011

Page 10: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Mortar joints around built-in joists should be recessed or struck and carefully pointed with flexible sealant. Alternatively, joists may be fitted with proprietary shoes as they are installed. Seal shoe to blockwork face with a flexible sealant. (Dotted blue line is notional, to depict continuity of air barrier through floor zone)

DETAIL 1.05, 2011

Keep cavities clean of mortar snots and other debris during construction

For timber engineered joists, proprietary filler pieces must be fitted on both sides of the web between top and bottom flanges. (See manufacturer's details.)

Suspended timber floors may be laid in joist hangers rather than built in

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Continue cavity wall insulation across floor abutment zone

Seal all penetrations through air barrier using a flexible sealant

Seal between wall air barrier and blockwork, above and below the floor assembly

Timber Intermediate Floor Within a Dwelling

Where wall supports joists, thermal performance and airtightness of junction can be improved significantly by using joist hangers with shoes standing off the wall face

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

Timber Intermediate Floor Within a Dwelling DETAIL 1.05, 2011

Page 11: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Mortar joints around built-in joists should be recessed or struck and carefully pointed with flexible sealant. Alternatively, joists may be fitted with proprietary shoes as they are installed. Seal shoe to blockwork face with a flexible sealant. (Dotted blue line is notional, to depict continuity of air barrier through floor zone)

DETAIL 1.05a, 2011

Keep cavities clean of mortar snots and other debris during construction

For timber engineered joists, proprietary filler pieces must be fitted on both sides of the web between top and bottom flanges. (See manufacturer's details.)

Suspended timber floors may be laid in joist hangers rather than built in

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Continue cavity wall insulation across floor abutment zone

Seal all penetrations through air barrier using a flexible sealant

Seal between wall air barrier and blockwork, above and below the floor assembly

Timber Separating Floor Between Dwellings

Where wall supports joists, thermal performance and airtightness of junction can be improved significantly by using joist hangers with shoes standing off the wall face

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

DETAIL 1.05a, 2011Timber Separating Floor Between Dwellings

Detail is diagramatic only. Where floor is a separating floor, accoustic insulation should be provided. See TGD-E

Page 12: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 13: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Complying with checklist qualifies builder to claim value in Table 3 of IP 1/06 and Table K1 of DEAP 2006

!

DETAIL 1.07, 2011

Keep cavities clean of mortar snots and other debris during construction

Read this detail in conjunction with detail G-02, Blockwork Partition Head

Masonry Partition Wall

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Continue cavity wall insulation across abutment zone

Seal all penetrations through air barrier using a flexible sealant

Seal between air barrier on external wall and the blockwork, to the partition wall. (Dotted blue line is notional, to depict air barrier continuity through partition, depending on whether partition toothed into external wall or braced with ties)

Masonry Partition Wall

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

DETAIL 1.07, 2011

Page 14: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)

Complying with checklist qualifies builder to claim value in Table 3 of IP 1/06 and Table K1 of DEAP 2006

!

DETAIL 1.08, 2011Stud Partition Wall

Read this detail in conjunction with details G-03, Timber Stud Partition Head, or G-04, Metal Stud Partition Head as appropriate

Ensure partial fill insulation is secured firmly against inner leaf of cavity wall

Continue cavity wall insulation across abutment zone

Keep cavities clean of mortar snots and other debris during construction

Seal all penetrations through air barrier using a flexible sealant

Install external air barrier before stud; or install barrier before partition lining and seal all gaps between air barrier and stud with flexible sealant. (Dotted blue line depicts air barrier continuity through partition stud member)

Detail applicable to timber stud and metal stud partitions

Stud Partition Wall

AIR BARRIER - CONTINUITY

AIR BARRIER - OPTIONS

THERMAL PERFORMANCE

(1) WALLS:- INSULATION IN CAVITY

Complying with checklist will help achieve design air permeability

GENERAL NOTES

ACCEPTABLE CONSTRUCTION DETAIL

CHECKLIST(TICK ALL)

CHECKLIST(TICK ALL)

OPTION(TICK ONE)

Masonry inner leaf with wet-finish plaster, or

Inner leaf with plasterboard on dabs, with continuous ribbon of adhesive tape around all openings, along top and bottom of wall, and at internal and external corners, or

Masonry inner leaf with scratch coat, and finished with plasterboard, or

Airtightness membrane and tapes

DETAIL 1.08, 2011

Page 15: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 16: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 17: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 18: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 19: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 20: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 21: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 22: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 23: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 24: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 25: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 26: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 27: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 28: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 29: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 30: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 31: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 32: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 33: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 34: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 35: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)
Page 36: (1) WALLS:- INSULATION IN CAVITY...22 5 m m m i n (1) WALLS:- INSULATION IN CAVITY Ground Floor - Insulation above slab DETAIL 1.01a, 20 11 THERMAL PERFORMANCE CHECKLIST (TICK ALL)