Transcript of 1 V-22 Update for AHS - Changing the Conversation Team Osprey.
11
V-22 Update for AHS - V-22 Update for AHS - Changing the Changing the ConversationConversation
Team Osprey
22
There is nothing more difficult to take in hand, more perilous to conduct, or more uncertain in its success, than to take the lead in the introduction of a new order of things.
--Niccolo Machiavelli, 1513
Renew?
Abandon?
IncrementalImprovements
Sustain competitive position
Rejuvenate?
Grow new businessImprove competitive position
Launch new businessEstablish competitive position
Technology Life-cycle Curve
19901950 1970 2011
Legacy Fleets
Innovator's DilemmaInnovator's Dilemma
EMBRYONIC GROWTH MATURE AGING
INDUSTRY MATURITY OVER TIME
SC
OP
E O
F A
DD
ITIO
NA
L T
EC
HN
OL
OG
ICA
L A
DV
AN
CE
Natural Limit of Technology
19901950 1970 2011
Tiltrotors
Tiltrotor and Tiltwing HistoryTiltrotor and Tiltwing History
Baynes HeliplaneTranscendental 1-G Boeing VZ-2Bell XV-3
Bell XV-15
Canadair XL-84
Curtiss-Wright X-19
LTV-Hiller-Ryan XC-142
Bell X-22
Doak VZ-4Kaman K-16
Bell Boeing V-22
Bell BoeingBell Boeing
55
Fuselage Landing Gear Avionics Electrical and Hydraulic Performance Flying Qualities Empennage Ramp
Philadelphia, PA
50/50 Strategic Alliance Agreement
Fort Worth, TX Composites Rotor Dynamics
Wing / Nacelle Over-wing Fairing Final Assembly Flight Test/Delivery
Amarillo, TX
66
Our CustomersOur Customers
USMCUSMC
360 MV-22360 MV-22
• Combat Combat Assault & Assault & Amphibious AssaultAmphibious Assault
• Sustained Land Sustained Land OperationsOperations
USSOCOMUSSOCOM
50 CV-2250 CV-22
• Long Range Special Long Range Special Operations Operations (Infil / Exfil / Resupply)(Infil / Exfil / Resupply)
• Contingency OperationsContingency Operations
USNUSN
48 MV-2248 MV-22
• Fleet Logistics SupportFleet Logistics Support
• Personnel RecoveryPersonnel Recovery
• Special Warfare SupportSpecial Warfare Support
77
Our ProductOur Product
Multi-role rotary-wing Multi-role rotary-wing ANDAND multi-role fixed-wing platformmulti-role fixed-wing platform
Flexibility of a helicopter; Flexibility of a helicopter; speed and range of a turbopropspeed and range of a turboprop
Designed for combatDesigned for combat 0 (hover) -282 kt speed range0 (hover) -282 kt speed range 1000 nm unrefueled range1000 nm unrefueled range 24 troops/12 litters/2 external 24 troops/12 litters/2 external
hookshooks Aerial refuelableAerial refuelable Shipboard compatibleShipboard compatible
CV-22
MV-22
88
Our ProgramOur Program
10 USMC and 2 AFSOC Squadrons operational10 USMC and 2 AFSOC Squadrons operational 134 aircraft fielded (118 MV-22 /16 CV-22)134 aircraft fielded (118 MV-22 /16 CV-22) 5-year, Multi-Year Procurement (MYP) contract signed Mar 20085-year, Multi-Year Procurement (MYP) contract signed Mar 2008
– 167 aircraft (141 MV-22, 26 CV-22) with options167 aircraft (141 MV-22, 26 CV-22) with options 5-year Performance Based Logistics (PBL) Contract5-year Performance Based Logistics (PBL) Contract
– Phase I (Integrated Logistics Support Management) signed Jan 09Phase I (Integrated Logistics Support Management) signed Jan 09– Phase 1.5 – (Reliability & Maintainability improvements) signed Jun Phase 1.5 – (Reliability & Maintainability improvements) signed Jun
0909– Phase II (Supply Chain Management) Phase II (Supply Chain Management)
Rolls Royce Engine PBLRolls Royce Engine PBL 100,000+ flight hours on the fleet; over 46% in the last two years100,000+ flight hours on the fleet; over 46% in the last two years Operationally deployed; combat proven Operationally deployed; combat proven
– 10 USMC (3 OIF, 3 OEF, 4 MEU)10 USMC (3 OIF, 3 OEF, 4 MEU)– 5 AFSOC (Honduras, Mali, OIF x2, OEF)5 AFSOC (Honduras, Mali, OIF x2, OEF)
Fielded and maturing
0
50
100
150
200
250
300
350
400
1981 1986 1991 1996 2001 2006 2011 2016
Program OverviewProgram OverviewMS I MS III
MS II
ReadinessCos
t
Safe
ty
Reli
ab
ilit
y
Log
isti
cs
MS II+
Capability
Cost
Readiness
Investing in Resources
#1 - People
•Objectives•Measures•Actions
Trust
Trust
1010
New Operational PerspectivesNew Operational Perspectives
Performs current missions more effectively - Performs current missions more effectively - increased success rateincreased success rate Performs current missions with less assets - Performs current missions with less assets - reduced force reduced force
structure/coststructure/cost Performs new missions unachievable with legacy platforms - Performs new missions unachievable with legacy platforms - growthgrowth
NOT A HELICOPTERNOT AN AIRPLANE
Paradigm shift required to fully benefit from
V-22’s unique capabilities
Platform Life Cycle Costs- Development & Qualification
- Fly-away/Initial Spares
- Operation & Support for 10,000+ flight hours P
rocu
rem
en
t Focu
s
Mission Costs- Deployment/Re-deployment- Fixed wing & helo support- Tanker support- Ship movement
Infrastructure - Bases and facility support- Manpower- Environmental implications
Intangibles- Political - Multi-mission flexibility- Principles of War enabler
Tota
l B
ud
get
Focu
sNew Ownership PerspectivesNew Ownership Perspectives
1111
Tiltrotor Cost
and Risk Avoidance
Increased Mission Success at Lower Total Mission Cost
World-Class TrainingWorld-Class TrainingMCAS NEW RIVER AND KIRTLAND AFBMCAS NEW RIVER AND KIRTLAND AFB
1212
Training System FoundationTraining System Foundation– FAA Level D simulatorFAA Level D simulator
– Networked to High Level Networked to High Level architecturearchitecture
Curriculum driven approach Curriculum driven approach – Directly supports warfighter Directly supports warfighter
through mission-linked tactical through mission-linked tactical flight trainingflight training
– Standardizes training methodsStandardizes training methods
– Reduces time and cost of trainingReduces time and cost of training
– Reduces required number of Reduces required number of aircraft & flight hours for training aircraft & flight hours for training
– Increases number of aircraft Increases number of aircraft available for operational missionsavailable for operational missions
High Impact, Networked Training - Today
Susceptibility/Vulnerability Susceptibility/Vulnerability RelationshipRelationship
PLATFORM CHARACTERISTICS
SUSCEPTIBILITY
INTELLIGENCE
MISSION
PLANNING
THREATSUPPRESSION
RANGE
SPEED
SIGNATURE CONTROL
Radar
Infrared
Visual
Acoustic
ElectronicEmissions
COUNTERMEASURES&SIGNATURE CONTROL
Radar Warning System
Missile Launch Warning
Countermeasures
DIRCM (CV Only)
SIRFC (CV Only)
DETECTION&
ACQUISITION AVOIDANCE
THREAT &
KILL TOLERANCE
SURVIVABILITY
ENGAGEMENT&
HIT AVOIDANCE
VULNERABILITY
VULNERABILITY REDUCTIONFire SuppressionBroom StrawControlled Wing FailureBallistic ToleranceCBR&NComponent Redundancy (with Separation)Armor
“Kill Chain”
1414
Demonstrated Terminal Area Demonstrated Terminal Area OperationsOperations
New tactics, techniques and procedures developed daily for a new way to fly
1515
Demonstrated Operational Demonstrated Operational UtilityUtility
1616
Demonstrated Shipboard Demonstrated Shipboard CompatibilityCompatibility
Demonstrated Shipboard Demonstrated Shipboard CompatibilityCompatibility
“I could dominate [Al Anbar Province] because I had V-22s… I couldn’t do what I did with just helicopters.”
MGen Kelly, CG MNF-W
“Turns Texas into Rhode Island.”BGen Alles, CG ACE MNF-W
10,000 flight hours - 6,000 sorties - 45,000 passengers10,000 flight hours - 6,000 sorties - 45,000 passengers
Operation Iraqi FreedomOct 2007 - Apr 2009
Operation Enduring FreedomNov 2009 - present
“4 MV-22B's hit two separate zones simultaneously on the southern end of the town. The two MV's came out of the sun and they couldn't see them or hear them until they were right on top of them--less than 30 seconds out.”
- Marine Forward Air Controller
“4 MV-22B's hit two separate zones simultaneously on the southern end of the town. The two MV's came out of the sun and they couldn't see them or hear them until they were right on top of them--less than 30 seconds out.”
- Marine Forward Air Controller
General support, direct action raids, deliberate assault, resupply, and CASEVAC at ranges un-executable by legacy assets.V-22 is shrinking the battlespace
“The V-22 can reach the fight and be effective in the fight like no other aircraft that has ever been embarked on these ships. And in doing so, it enhances the ship’s ability to contribute to those missions.”
- Commanding Officer, USS Bataan
“The V-22 can reach the fight and be effective in the fight like no other aircraft that has ever been embarked on these ships. And in doing so, it enhances the ship’s ability to contribute to those missions.”
- Commanding Officer, USS Bataan
Marine Expeditionary UnitsMay 2009 - present
Humanitarian Assistance/Disaster Relief: Haiti, Jan 2010
Operation Unified Response
“…the speed of the Osprey allows us to land multiple teams in areas all throughout Northern Haiti, leave them there with enough time to get a good assessment and retrieve all these teams before nightfall - only using two Ospreys.”
- Capt Robert Shuford, 24th Marine Expeditionary Unit
Operation Iraqi Freedom Jul-Nov 09
6 CV-22s
7,000nm self-deployment in 6 days from Florida to Iraq
45 Direct Action missions - all to formation brown-out landings
123 Combat Support Missions – 30,250 lbs of cargo
2349 Passengers/Assaulters
Supported separate long-range National contingency mission; 455 nm from FSB to target = IDEAL PLATFORM!
“The CV-22 is an extremely stable platform and its inherent navigation system and heads down display symbology lend itself well to the mission set”
- 8 SOS/CC
Operation Enduring Freedom Apr – Oct 10
5 CVs deployed via commercial sea lift
875 sorties – 928 hours
72 Direct Action missions - all to formation LVAs
42 Combat Support Missions – 87,433 lbs of cargo
4,829 Assaulters/Passengers
284 potential terrorists in custody
Where We Are HeadedWhere We Are Headed
Lessons LearnedLessons Learned
Design - As programs move through acquisition Design - As programs move through acquisition phases, ratio of assumption-to-knowledge is phases, ratio of assumption-to-knowledge is dependent on technological predecessors. (V-22 dependent on technological predecessors. (V-22 is first of type)is first of type)
Operation – Community starts with what they Operation – Community starts with what they know (fly tiltrotors like helicopters)know (fly tiltrotors like helicopters)
Reliability - Small percentage of components Reliability - Small percentage of components have lower than expected reliability have lower than expected reliability – Normal Fleet introduction issues amplified by combat & Normal Fleet introduction issues amplified by combat &
deploymentsdeployments– Sparing and supplier capacity based on optimistic Sparing and supplier capacity based on optimistic
predictionspredictions– Unforeseen failure rates impact readiness and operating Unforeseen failure rates impact readiness and operating
costscostsV-22 has a higher assumption-to-knowledge ratio than any recently fielded platform
RCM/Sustained RCM/Sustained Maintenance PlanningMaintenance Planning
V-22 Key Improvement V-22 Key Improvement AreasAreas
MaintainabilityMaintainability– Improve troubleshooting to reduce "Could Not Duplicate" gripesImprove troubleshooting to reduce "Could Not Duplicate" gripes– Improve aircraft “grooming” techniques for preventative Improve aircraft “grooming” techniques for preventative
maintenancemaintenance Supply SupportSupply Support
– Execute a contracting strategy required to incentivize supportExecute a contracting strategy required to incentivize support Appropriately-scoped PBL and selected break-outs direct to Appropriately-scoped PBL and selected break-outs direct to
supplierssuppliers– Improve Velocity and Capacity of Production/Repair Improve Velocity and Capacity of Production/Repair – Improve test/check/repair capability closer to the flightlineImprove test/check/repair capability closer to the flightline
Core ReliabilityCore Reliability– Increase Component Reliability (e.g. generator, air valves) Increase Component Reliability (e.g. generator, air valves) – Increase System and Functional Reliability and Robustness (e.g. Increase System and Functional Reliability and Robustness (e.g.
power plant, wiring, nacelle cooling)power plant, wiring, nacelle cooling)
Making V-22 As Ready and Affordable as it is Effective and Survivable
Thank you for your time. Thank you for your time.
2727
Questions?Questions?