1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ....

6
Linac4 - Accord Technique #1 Introduction 1 M. Vretenar CSP Meeting 24.11.2010

Transcript of 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ....

Page 1: 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ. 2. Procurement and testing of a solid-state RF amplifier.

1

Linac4 - Accord Technique #1Introduction M.

Vretenar

CSP Meeting 24.11.2010

Page 2: 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ. 2. Procurement and testing of a solid-state RF amplifier.

The 3 contributions

1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ.

2. Procurement and testing of a solid-state RF amplifier for the Linac4 bunchers

3. Construction and test of the high-voltage modulators.

Page 3: 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ. 2. Procurement and testing of a solid-state RF amplifier.

Summary and agreed values

Accord Technique

Nom Work Packages materiel kEUR

hommes.mois

Institut

1 Linac 4 1.1 Design studies of the Linac 4

0.00 15.6 CEA

1.2 Measurement and commissioning of the Linac 4 RFQ

100.00 8.4 CEA

1.3 Procurement and testing of buncher RF amplifiers

150.00 4 CNRS-LPSC

1.4 Construction and test of klystron modulators

1,500.00 8 CNRS-LAL

Totals 1,750.00 36

O. Napoly (CEA)

F. Martin (LAL)

MV

Page 4: 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ. 2. Procurement and testing of a solid-state RF amplifier.

4

“Mount-Citron”, September 2008

Building construction status

Page 5: 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ. 2. Procurement and testing of a solid-state RF amplifier.

5

Linac4 – revised schedule

Building delivery2011:

Infrastructure installation

2012/13:Accelerat

or installatio

n

2013/14:Commissio

ning

2014/15:Reliability

runEnd 2014:

Linac4 ready

2016: foreseen shutdown for

connection to PSB

Page 6: 1. The 3 contributions 1. Contribution to the design, RF tuning and commissioning of the Linac4 RFQ. 2. Procurement and testing of a solid-state RF amplifier.

6

Buncher RF amplifiers (352 MHz)

Étendue de la fourniture du WP de 1 amplificateur 33 kW à 2 amplificateurs 33 kW plus une charge 25 kW pour les tests à 70 kW 1.5 ms et 50 Hz approuvée par le CSP.  *2 amplificateurs 352.2 MHz 33 kW + combinateur 60 kW   o Fournisseur: DB E    o Contrat signé CNRS le 16.03.2010, DB le 02.03.2010    o Montant : 106’820 euros.    o Date de livraison prévu au CERN: Fin décembre 2010.

TESTS DE RECEPTION EN USINE PREVUS Les 9 et 10.12.2010Administration LPSC prévenue de la possibilité de retards (…)

* Charge 352.2 MHz 25 kW pour les tests à 70 kW en pulse ( 1.5 ms et 50 Hz).   o Fournisseur: Elhyte    o Lancement de la commande: 27.04.2010    o Montant: 2’500 euros    o Livraison LPSC: Le 10.06.2010

Information from Y. Gomez (LPSC) and J. Broere (CERN)