1
Technical Advice from Architectural Services
Department
![Page 2: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/2.jpg)
2
I. Processing of Applications
II.Consultant Appointment after Budget Approval
![Page 3: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/3.jpg)
1. Steps of Processing 2. Drawings and Estimates3. Common Problems
3
I. Processing of Applications
![Page 4: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/4.jpg)
1. Five Steps of ProcessingStep 1: Preliminary Assessment
Step 2: Arrangement for Joint Site Inspection
Step 3: Joint Site Inspection
Step 4: Budgetary Assessment
Step 5: Differences/Objections from Schools
4
![Page 5: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/5.jpg)
Step 1: Preliminary Assessment EDB to complete Initial Screening.
EDB to forward to ArchSD the DSS applications in batches.
ArchSD to advise EDB of preliminary assessment.
5
![Page 6: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/6.jpg)
Step 2: Arrangement for Joint Site
Inspection
EDB to arrange joint site inspection upon receipt of ArchSD’s preliminary assessment.
Outstanding information to be provided by the school 3 days prior to the joint site inspection.
6
![Page 7: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/7.jpg)
Step 3: Joint Site Inspection
EDB to lead the joint inspection and decide on supportability of items as required.
Schools’ representative to answer queries raised during site walk and provide further information immediately afterwards.
7
![Page 8: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/8.jpg)
Step 4: Budgetary Assessment by
ArchSD
Based on the available information from schools and policy decision on supportability of items from EDB, ArchSD to proceed with detailed budgetary assessment.
ArchSD to report on the technically supported amount to EDB.
8
![Page 9: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/9.jpg)
Step 5: Differences/ Objections from
SchoolsSchools to provide justification/
substantiation in respect of each disputed item within reasonable time after receipt of EDB’s advice.
EDB/ ArchSD to further assess and decide on the final supportable level.
ArchSD to complete within reasonable time.
May repeat the above process once more, where necessary, as the final round.
9
![Page 10: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/10.jpg)
2. Drawings and Estimates
Drawings for each application item:
1) Layout plans with dimensions and location
2) Layout plans to scale3) Highlight changes on plans
10
Drawings
![Page 11: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/11.jpg)
Details of the proposed works items should be clear and sufficient to facilitate cost estimates
11
Estimates
ARCHITECTURAL SERVICES DEPARTMENTSUBVENTED PROJECTS DIVISION
Estimate for DSS Major Repair Works(Building Work)
Item No.
Details of Works Items (description, locations, etc.)
Work Type
Justification Qty Unit RateApplied Amount
To be completed by EDB/ArchSD
Supported Amount
($)
Sub-total ($)
Remarks
(1)Waterproofing works for main roof, roof and upper roof floor (remedial and improvement):
1.1Demolition of existing roof finishes and waterproofing membrane
1 Sup. 0 0
1.2Cement sand screeding to fall 1 Sup. 0 0
1.3Laying of new waterproofing membrane
1 Sup. 0 0
1.4Laying of new polystrene insulation board
1 Sup. 0 0
1.5Paving of new roof tiles 1 Sup. 0 0
1.6Pond test 1 Sum 0 0
Sub-total and carried to summary
0
![Page 12: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/12.jpg)
3. Common problems
1. Unclear or ambiguous description of the scope of works
2. Estimates combined into a lump sum without relevant breakdowns
12
![Page 13: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/13.jpg)
3. Inclusion of non/above-standard items
4. Inclusion of furniture and equipment (F & E) items
5. Slope repair works
13
![Page 14: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/14.jpg)
Example:
Arch SD’s comment: Layout plan with indication of the exact
locations of the air-conditioner and detailed work scope (e.g. the cooling capacity and type of air-conditioner) should be provided.
Description Unit Unit Rate
Amount
Replacement of existing air-conditioners in the Offices
5nos $4,100 $20,500
14
1. Unclear or ambiguous description of the scope of works
![Page 15: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/15.jpg)
Proper Submission:Provide clear description of the scope of
works
15
Description Unit Unit Rate
Amount
(i)To replace the existing air-conditioners in the Staff Room on 2/F with window type A/C units (cooling only with cooling capacity @5.3kW) c/w all necessary supports, condensate drip pan, power supply connection and condensate drain pipe connected to nearest drain
3nos $4,500 $13,500
![Page 16: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/16.jpg)
Proper Submission:Provide clear description of the scope of
works (cont’d)
16
Description Unit Unit Rate
Amount
(ii)To replace the existing air-conditioners in the General Office on G/F with window type A/C units (cooling only with cooling capacity @3.5kW) c/w all necessary supports, condensate drip pan, power supply connection and condensate drain pipe connected to nearest drain
2nos
$3,500 $7,000
Total $20,500
![Page 17: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/17.jpg)
Submit relevant layout plans to indicate locations of the air-conditioners.
17
![Page 18: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/18.jpg)
2. Estimates combined into a lump sum without relevant breakdown
Example:
Arch SD’s comment: Schools/AP should provide the cost
breakdown for waterproof coat.
Description Unit Unit Rate
Amount
Application of roof waterproof coat
1sum
$890,000
$890,000
18
![Page 19: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/19.jpg)
Proper Submission:Schools should provide roof warranty to show expiry of guarantee period.
19
![Page 20: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/20.jpg)
20
Description Unit Unit Rate Amount RemarksDemolition of existing roof finishes and waterproofing membrane
1000 m2 $150 $150,000 Water seepage and weathering of roof-top.
Cement sand screeding to fall
1000 m2 $200 $200,000
Laying of new waterproofing membrane
1000 m2 $250 $250,000
Laying of new polystrene insulation board
1000 m2 $100 $100,000
Paving of new roof tiles
1000 m2 $180 $180,000
Pond test 1 sum $10000 $10,000
Total $890,000
• Example:
![Page 21: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/21.jpg)
3. Inclusion of non/above-standard itemsExamples:
CCTV System;Air-conditioning system/units in
Dining Hall, etc.
Proper Submissions:Schools should follow the standard
provision according to EDB’s requirements
21
![Page 22: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/22.jpg)
4. Inclusion of furniture and equipment ( F&E) items
Examples:Audio/ Visual equipment;LAN cable and computing equipment;Overhead projector, etc.
Proper Submission:F&E items should not be included in
the works.
22
![Page 23: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/23.jpg)
5. Slope repair works
23
![Page 24: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/24.jpg)
DSS Application for non-recurrent assistance – Slope Repairs (SR)
24
![Page 25: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/25.jpg)
25
Types of Works Not Supported under Non-recurrent Assistance Routine slope maintenance works (e.g. Repair cracked / damaged chunam / shotcrete surface, remove unplanned vegetations, clearance of blocked drainage channels / catchpits, repair damaged channels / catchpits, clear blocked weepholes in retaining walls etc.)
Engineer Inspection (EI) of slopes / retaining walls located within school boundaries to be carried out by Registered Geotechnical Engineers
![Page 26: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/26.jpg)
26
Types of Works / Studies Supported under Non-recurrent Assistance
Stability Assessment by Registered Geotechnical Engineer + Slope stabilization works Preventive maintenance works
• Soil slopes – improved surface protection on slope and upslope, surface drainage channels, subsoil drainage, soil nails etc.
• Rock slopes – concrete buttress, rock dowels, steel wire meshes, scaling or dentition etc.
![Page 27: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/27.jpg)
27
II. Consultant Appointment after Budget Approval
1.Procedures for Consultant Selection
2.Number of Tenderers 3.List of Tenderers 4.Expression of Interest (EOI)5.Consultant’s Invitation
Document 6.Evaluation of Consultant’s
Proposal
![Page 28: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/28.jpg)
28
1. Procedures for Consultant Selection • Guidelines on Consultant Selection
for Architectural and Associated Consultancy Services
• Guidelines on Consultant Selection for Quantity Surveying Consultancy Services
![Page 29: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/29.jpg)
29
2. Number of Tenderers
• Invite at least 5 consultants of appropriate band
• If less than 3 valid tender returns are received, the tender exercise is abortive.
• Therefore, schools preferably invite 6-8 consultants
![Page 30: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/30.jpg)
30
3. List of Tenderers
• From the list of approved Architectural and Associated Consultants
• If estimated fee more than HK 1.43 million > Band 1
• If estimated fee not more than HK $1.43 million > Band 2 and Band 3
![Page 31: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/31.jpg)
31
• Website: http://www.archsd.gov.hk> Consultants & Contractors >(a) List of Consultants of AACSB OR (b) List of Band 3 Architectural Consultants
(a) List of Consultants of AACSB>Who have been included?>Choose: Category: “Architectural Category/ Quantity Surveying Category”; and Band: “Band 1/ Band 2”>Search
![Page 32: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/32.jpg)
32
(b) List of Band 3 Architectural Consultants >Yes and Proceed>(1)The Associated of Architectural Practices (AAP) and (2) The Hong Kong Institute of Architects (HKIA)
![Page 33: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/33.jpg)
33
4. Expression of Interest (EOI)
• To ensure obtaining 6-8 consultant’s proposals, EOI should be carried out.
• Invitation letter>Scope of the Works>Estimate Cost of the Works>Period of Time for Services
• Sample for reference
![Page 34: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/34.jpg)
34
![Page 35: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/35.jpg)
35
Statement for Expression of Interest to Tender
Date : ____________
To : [name and address of NGO]
Fax No. : [ ]
Dear Sir/Madam,
Architectural and Associated Consultancy Services for
[TITLE OF PROJECT]
I *wish/do not wish to be invited to tender for the captioned Services.
Yours faithfully,
________________________________
(Authorized Signature for and on behalf of the
Consultant)
Name of Consultant : __________________
* Delete as appropriate.
![Page 36: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/36.jpg)
36
Annex
Architectural and Associated Consultancy Services for
[TITLE OF PROJECT]
(1) Scope of the Works
Item No. Work Description Location
1 External texture paint to wall and soffit All elevations and Staircases 2 Replacement of existing waterproofing works Main roof and upper roof 3 Demolish existing floor finish, relay waterproofing and floor tile finish for
toilets
Boy's and Girl's toilets 1/F to 7/F
4 Repaint anti-mould emulsion paint to internal wall All Classrooms and Offices 5 Replacement of existing door and frames including new ironmongery and
painting
Rooms 105, 106, 203, 302, 403, 405,
502, 602, 603 6 Replace existing all pipes of drainage and plumbing system entire building 7 Replacement of existing air conditioners with 3 new 22900 BTU
window-type air conditioners
Chemistry Laboratory 6/F
8 Supply and install wiring, G.I. conduit and trunking for:
a. 14 nos. lighting point and 6 nos. power point per classroom(total 24
classroom and 20 special room)
b. 5 nos. lighting point per toilet (total 16 toilets/changing rooms).
c. 60 nos. lighting point and 20 nos. power point for Hall.
d. Wiring from main switch room to sub-main switch room and MCB
board.
Old wing of school premises
(2) Estimated Cost of the Works
Approved project cost $
Preliminaries $
_______________________
$
Contingencies $
________________________
Estimated Cost (in September 2011 prices) $
![Page 37: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/37.jpg)
37
5. Consultant’s Invitation Document• Refer to Guidelines
> “NGO Note” in blue colour
• Technical and Fee Proposal>Appendix 4 for Technical proposal
• Fee Proposal Only (Annex I)>(optional) for estimated fee not more than HK $1.43 million
![Page 38: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/38.jpg)
38
6. Evaluation of Consultant’s Proposal
• Technical Assessment and Approval
• Commence Technical and Fee Assessment after EDB’s Approval of Technical Assessment
![Page 39: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/39.jpg)
39
Questions & Answers
![Page 40: 1 Technical Advice from Architectural Services Department.](https://reader035.fdocuments.net/reader035/viewer/2022081507/55165fd2550346c6758b5f34/html5/thumbnails/40.jpg)
40
Thank You