1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications...

12
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin Harakeh (ENSAR Coordinator) and the ENSAR management group (FISCO)

Transcript of 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications...

Page 1: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

1

Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research”

(ENSAR)

Marek Lewitowicz (GANIL)

on behalf of Muhsin Harakeh (ENSAR Coordinator) and

the ENSAR management group (FISCO)

Page 2: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

2M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative improvement of the access provided by the current seven infrastructures, which are at the core of this proposal. The novel and innovative developments that will be achieved by the RTD activities will also assure state-of-the-art technology needed for the new large-scale projects.

Page 3: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 3

Integrating Activities Call on July 2009INFRA-2010-1.1.32: Research Infrastructures for Nuclear Physics. A project under this topic should aim at integrating the key research infrastructures in Europe for studying the properties of exotic nuclei, and turning advances in nuclear physics experimentation into new applications.

Targeted call - better chances; budget < 10 M€

Submitted Proposal:Large community 10 M€ for 4 years

TNA 4.52 M€JRA JRA 4.01 M€NA 1.47 M€

7 TNAs, 7 JRAs, 6 NAs (Total Budget ~ 10 M€)Number of participants ~ 29

Page 4: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

4M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid

Partners of

GANILGANILGSIGSI

LNL-INFNLNL-INFN

LNS-INFNLNS-INFN

JYLJYL

RUG-KVIRUG-KVI

CERN-ISOLDECERN-ISOLDE

ALTO-CNRSALTO-CNRS

TUWTUWULBULB

KULKUL

CEACEA

INRNE-BASINRNE-BAS

RBIRBI

NPINPI

TUDTUD

NCSRDNCSRD

ATOMKI-HASATOMKI-HAS

ECT*ECT*

UWARUWAR

IFJ-PANIFJ-PAN

FFCULFFCUL

IFIN-HHIFIN-HH

USCUSC

CIEMATCIEMAT

UCMUCM

PSIPSI

UNIBASUNIBAS

JOGUJOGU

UNIMANUNIMAN

29 beneficiaries18 countries29 beneficiaries18 countries

7 TNA Facilities7 TNA Facilities

53 associated partners53 associated partners

Page 5: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

Transnational Access Facilities in IA ENSAR

TNA1 (Access to GANIL, 3510 hours of beam) TNA2 (Access to GSI, 3750 h) TNA3 (Access to INFN-LNL&LNS, 4424 h) TNA4 (Access to JYU-JYFL, 3000h) TNA5 (Access to KVI, 800 h) TNA6 (Access to CERN-ISOLDE, 5200 h) TNA7 (Access to ALTO, 1470 h)

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 5

Strong emphasis on the support for users (30-40% of the TNA EC request)Strong emphasis on the support for users (30-40% of the TNA EC request)

Page 6: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 6

Network Activities in ENSAR

NA01 FISCO (FInancial & Scientific COordination)

NA02 ECOS (European Collaboration On Stable ion beams)

NA03 EURISOL NET (EURopean ISOL NETwork)

NA04 ATHENA (Advanced THeory & Experiments for Nuclear Astrophysics)

NA05 EGAN (European Gamma & Ancillary detectors Network)

NA06 EFINION (European Forum for Innovative applications of Nuclear ION beams and tools)

Page 7: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 7

Joint Research Activities in ENSAR

The JRAs deal with all aspects of experimental activities from sources and targets, to detectors, simulations of experimental set-ups, data analysis and development of adequate theoretical tools

• JRA01 ARES (Advanced Research on Ecr ion Sources)

• JRA02 ActILab (Actinide ISOL target R&D Laboratory)

• JRA03 PREMAS (Low-energy beam PREparation, MAnipulation & Spectroscopy)

• JRA04 INDESYS (INnovative solutions for nuclear physics DEtector SYStems: “From basic R&D to applications for the society”)

•JRA05 SiNuRSE (Simulations for Nuclear Reactions and Structure in Europe)

• JRA06 EWIRA (East West Integrated Research Activities)• create a niche for the small(er) laboratories from Central and South-Eastern

Europe and bring them to a level comparable to that of the existing Western European laboratories

• JRA07 THEXO (THeoretical tools in support of infrastructures)

Page 8: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

ENSAR scored 14/15 in the evaluation (March’10). The report was very positive but with one remark:“The larger partners in the consortium requesting the largest budget should cover a higher percentage of the costs through their own resources.”

Furthermore, the EC cut the total budget to 8 M€, and added the following two conditions:“The allocation of available funds within the project should take into account in particular the interest of the user community.” and“The project should aim at a higher visibility of the opportunities and services offered by the TA facilities also to scientists from outside of the traditional user communities.”

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 8

Page 9: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

Taking these recommendations into account and after consultation with the user community, the ENSAR Scientific Advisory Committee decided on 23 April to enforce the following cuts:

TNAs: a 12% cut should be realised totally at the cost of, i.e. reduction of, unit cost leaving the minimum number of hours of beam time and the travel and subsistence for users the same. The total budget for AGATA within the three concerned TNAs should be cut by 20%. (➔ EC request 3.97 M€)

JRAs: were proportionally cut by 27%. It was left to the JRA work-package leaders to realise this cut in the way they find best for their community. However, it was strongly advised to cut tasks completely, if feasible. ( ➔ EC request 2.93 M€)

The NAs were cut by 30% (except FISCO which has to stay at 7% of the total budget thus applying a 20% cut). Here also, it was strongly advised to cut tasks completely, if feasible. ( ➔ EC request 1.10 M€)

Total ENSAR budget >>11 M€ (Total EC request 8 M€; enforced upper limit by EC)

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 9

Page 10: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

ENSAR Organisation Coordinator: Muhsin Harakeh (KVI/GSI/GANIL)

Deputy Coordinator: M. L. (GANIL)

Project Manager: K. Turzo (GANIL)

… Managing institution: GANIL 29 Partners

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 10

NA01FISCO

Page 11: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

ENSAR Timeline

Negotiation with EC opened on March 26, 2010

First negotiation meeting with EC on May 18, 2010

Target date for the end of negotiations June 11, 2010

We aim at an ENSAR starting date of Sept. 1, 2010

EC funds are expected by the end of 2010

End of the ENSAR project August 31, 2014

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 11

Page 12: 1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.

M. Lewitowicz, NuPECC LRP Town Meeting, 31/05-2/06 2010, Madrid 12

Thank you for your attention