1GWU CS 259 Brad Taylor Spring 2004 Systems Programming Meeting 9: Connectionless Communication.
1 SP Metrics Pilot Proposal 1 st Quarter 2004 Suppliers Partnership for the Environment Membership...
-
Upload
aleesha-anthony -
Category
Documents
-
view
212 -
download
0
Transcript of 1 SP Metrics Pilot Proposal 1 st Quarter 2004 Suppliers Partnership for the Environment Membership...
1
SP Metrics Pilot Proposal
1st Quarter 2004
Suppliers Partnership for the Environment
Membership Meeting January 22, 2004Presented By
Brad Strohm
Scott Stanley
2
SP Metrics Program Pilot 2004 Annual Report• SP “Metrics Program” environmental Performance Reporting reflects improvementsin one or more of the five metric categories reported by Sp Green auto Sector program participants for the calendar year xxxx.• Improvements have been reported both as totals and as normalized values using individual participant company factors. Datareflects a mix of case study, regional and global environmental improvements as measured by SP participants
Review; The SP “al carte” Metrics Approach
SP “Metrics Program” Participants• Ala Carte Selected Reporting
• Case Study• US Operations• Global Operations
• Company Specific normalization
Energy Use
Water Use
Waste Material Use
Toxics
3
SP 2004 Metrics Pilot Proposal
Energy Use Only
Water Use Waste
Material Use
Toxics
Two ends of the spectrum:
Start small report only energy, using energy spreadsheet
or
Attempt to aggregate data from all metric categories
Energy Use plus
4
SP 2004 Metrics Pilot Proposal
Energy Use only;
• Use Energy reporting Spreadsheet – Coverts Greenhouse gas emissions
• Simple Straight, forward
• Most Companies already tracking Energy Use
• Minimal Confidentiality Concerns
5
SP 2004 Metrics Pilot Proposal
All Category Reporting;
• Greater number of Possible success stories
• Possible facilitation of exchange of Best Practice info
• More robust , reflects areas of greatest environmental concern
6
SP 2004 Metrics Pilot Proposal
• Obtain commitment form SP members to participate in Pilot (either energy only, or all category)
• Pilot Participants submit test data
• SP Metrics Task Team Reviews data to;• Develop Draft / Trial SP Environmental Performance Press Release• Refine SP Metrics Reporting Guidance Document• Prepare Proposal for Ongoing Approach (2nd Qtr 2004)
NOTE:• Only non-confidential data should be submitted• SP Metrics Reporting is intended to be one option for member companies to report environmental success stories• SP reporting is voluntary and not intended to replace more comprehensive individual company environmental reporting
7
SP 2004 Metrics Pilot Proposal – Next Steps
• Agree on SP Pilot Scope ( energy or all category)
• Form Metrics Data Review Task Team • Agree on date for Pilot data submission
• Schedule meeting for SP Metrics Task Team Data Review
• Prepare Proposal for Ongoing Approach (2nd Qtr 2004)