1. Site Survey and Planning Procedure

download 1. Site Survey and Planning Procedure

of 4

Transcript of 1. Site Survey and Planning Procedure

  • 8/13/2019 1. Site Survey and Planning Procedure

    1/4

    Procedure

    SITE SURVEY AND PLANNING PROCEDURE

    Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e 1 o% &

    REVISION CHANGE HISTORY

    Rev

    No.

    Effective

    Date

    Affected

    Page

    Change Descri tions Revie!ed

    "#

    A roved

    "#0 31 Jul 2013 All New Issue

    $. PO%ICY

    Our policy is to find out and plan accurate site data at first time.

  • 8/13/2019 1. Site Survey and Planning Procedure

    2/4

    Procedure

    SITE SURVEY AND PLANNING PROCEDURE

    Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e ' o% &

    &. P'RPOSE

    The purpose of this procedure is to provide comprehensive site survey data collection and plannin!

    procedure "as well as to collect accurate site data#.

    (. SCOPE

    This procedure is applica$le to %NO Transmission &ore 'ireless and Tower (epartments of the

    company. Other departments may also use such as Networ) *ection etc.

    ). RESPONSI*I%ITIES

    +.1. %NO (epartment or *ection ,ana!er is responsi$le for the !o ahead orders of site surveys as

    well as su$mission of site survey report"s# to respective departments. They are also responsi$le for

    proper preservation and filin! of all necessary records and data.

    +.2. T( ,ana!er is responsi$le for site survey approval.

    +.3. %NO -n!ineer"s# are responsi$le for performin! all %NO activities includin! site surveys.

    +. DE,INITIONS

    .1. *ite means location of the e/uipment to $e installed.

    .2. %NO %adio Networ) Optimi ation (epartment

    .3. %N means %adio Networ) lannin!

    .+. T( means Technical (ivision

    . . &ell (ata is the cell parameters that will $e used to confi!ure the e/uipment.

    -. RE,ERENCES

    .1. I*O 00142005

    .2. &ompany %e/uirements

  • 8/13/2019 1. Site Survey and Planning Procedure

    3/4

    Procedure

    SITE SURVEY AND PLANNING PROCEDURE

    Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e ( o% &

    . THE PROCED'RE

    6.1. *ite survey can $e performed if networ) initial plans are prepared or customers complaint or

    recommended $y %NO and approved $y T( mana!er.

    6.2. 7pon the need of site survey trained or capa$le %NO -n!ineer"s# should visit the physical

    location of the area to confirm the need and collect necessary parameters usin! site preplan

    document.

    6.2.1. If the site locates within the city ",o!adishu and its su$ur$s# the survey should not e8ceed

    to a period NOT more than two wor)in! days.

    6.2.2. 9owever if the site locates rural areas *ite *urvey should not ta)e more than 10 wor)in!days.

    6.3. After collectin! all necessary data %NO -n!ineer"s# must analy e the data and produce site

    survey report that descri$ers site parameters.

    6.+. %NO -n!ineer"s# should share the site survey report with the respective other departments within

    period not more than :I;- wor)in! days.

    NOTE:

    The timing of site survey report depends on the number of sites being surveyed and/or area of

    those sites .

    6. . Immediately after %NO (epartment su$mits the report respective department"s# will use such

    report to deploy re/uired e/uipment to the site.

    6. . (urin! deployment process %NO will report &ell (ata and su$mit it to the respective

    department"s# such as IN &ore and 'ireless within period not more than two wor)in! days.

    /. RECORDS5.1. *ite *urvey :orm

    5.2. *ite replan (ocument

    5.3. *ite *urvey %eport

    5.+. &ell (ata :orm

  • 8/13/2019 1. Site Survey and Planning Procedure

    4/4

    Procedure

    SITE SURVEY AND PLANNING PROCEDURE

    Doc. No. : HTS-RNO-QP-001 Rev ! o" No. : 0 P#$e & o% &

    DOC'0ENTATION CHANGE ,%O1 CHART

    No

    *tar t

    * t ep1

    * tep 3

    * tep 2

    (ecision

    * tep +

    * tep

    Yes

    * tep

    * tep N

    -n d