Anisotropic Flow in s NN = 200 GeV Cu+Cu and Au+Au collisions at RHIC - PHENIX
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV...
-
Upload
kristian-daniels -
Category
Documents
-
view
246 -
download
0
Transcript of 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV...
![Page 1: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/1.jpg)
1
RHIC Machine/Detector Planning Meeting9 May 06
Agenda
– SPECIAL TOPICS:
• Schedule for the 62 GeV pp run
• What is preferred order of beam species for RUN07? – first thoughts
– Scheduling Physicist (Brown) - Scheduling issues
– Experiment Progress/Issues - STAR, PHENIX, (BRAHMS)
– Jet Target Progress/issues - (Makdisi)
– Machine Issues - (Ptitsyn)
– AGS beam polarization progress report/polarimeter status – (Huang)
– RHIC Polarimeters (Bravar) – issues
– RHIC Beam Experiments – (Pilat)
– RCF (Throwe) – issues
Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_06/rhic_planning.htm
![Page 2: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/2.jpg)
2
Experiment Goals (in progress)
s Pol. Config. Recorded L Delivered L Pol weeks
PHENIX: 200 GeV Radial 4-7 pb-1 10-17 pb-1 ≥ 50% 3-4# 200 GeV Longitudinal 10 pb-1 30 pb-1 ~ 60% 7 62.4 GeV Transverse 0.6 pb-1 1.4 pb-1 any 2 *22 GeV 4 nb-1 10 nb-1
STAR: 200 GeV Transverse 5 3 pb-1 15 pb-1 ≥ 50% ~ 4 200 GeV Longitudinal 10 pb-1 30 pb-1 ≥ 50% ~7 62.4 GeV Transverse 0.5 pb-1 0.5 pb-1 ≥ 2
BRAHMS: 62.4 GeV Transverse 0.85 pb-1 1.4 pb-1 ~ 50% 2
• Not in present plan• # with 50-60% pol, end with 4 weeks of operation or 4-7 recorded pb -1, whichever comes first
![Page 3: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/3.jpg)
3
Run6 RHIC p^p^ Integrated Luminosity for Physics
0.02.04.06.08.0
10.012.014.016.018.020.022.024.026.028.030.0
4-M
ar
11
-Ma
r
18
-Ma
r
25
-Ma
r
1-A
pr
8-A
pr
15
-Ap
r
22
-Ap
r
29
-Ap
r
6-M
ay
date
Inte
gra
ted
Lu
min
os
ity
[p
b^
-1]
STAR
PHENIX
min
max
current as of 5/8/06
STAR Transverse Goal(15 pb-1 delivered)
STAR transverse pol begins
![Page 4: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/4.jpg)
4
Run6 RHIC p^p^ Integrated Luminosity for Physics
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
4-M
ar
11
-Ma
r
18
-Ma
r
25
-Ma
r
1-A
pr
8-A
pr
15
-Ap
r
22
-Ap
r
29
-Ap
r
6-M
ay
13
-Ma
y
20
-Ma
y
27
-Ma
y
3-J
un
date
Inte
gra
ted
Lu
min
os
ity
[p
b^
-1]
STAR
PHENIX
min
max
current as of 5/8/06
PHENIX longitudal Goal(30 pb-1 delivered)
“11” weeks in Physics mode
PHENIX long pol begins
![Page 5: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/5.jpg)
5
Run6 RHIC p^p^ Integrated Luminosity for Physics
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
4-M
ar
11
-Ma
r
18
-Ma
r
25
-Ma
r
1-A
pr
8-A
pr
15
-Ap
r
22
-Ap
r
29
-Ap
r
6-M
ay
13
-Ma
y
20
-Ma
y
27
-Ma
y
3-J
un
date
Inte
gra
ted
Lu
min
os
ity
[p
b^
-1]
STAR
PHENIX
min
max
current as of 5/8/06
STAR longitudal Goal(30 pb-1 delivered)
“11” weeks in Physics mode (STAR)
STAR long pol part 2 begins (plan)STAR long pol part 1 ends
![Page 6: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/6.jpg)
6
5/9/06
# protons in RHIC vs date
0
20
40
60
80
100
120
140
160
25
-Fe
b-0
6
4-M
ar-0
6
11
-Ma
r-06
18
-Ma
r-06
25
-Ma
r-06
1-A
pr-0
6
8-A
pr-0
6
15
-Ap
r-06
22
-Ap
r-06
29
-Ap
r-06
6-M
ay-0
6
13
-Ma
y-06
Av
era
ge
pro
ton
s in
ea
ch
rin
g x
1011
![Page 7: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/7.jpg)
7
PHENIX ZDC Rate vs date
0
5000
10000
15000
25-Feb-06
4-Mar-06
11-Mar-06
18-Mar-06
25-Mar-06
1-Apr-06
8-Apr-06
15-Apr-06
22-Apr-06
29-Apr-06
6-May-06
13-May-06
ZD
C R
ate
PHENIX ZDC (Initial)
PHENIX ZDC (+3 hrs)
5/9/06
![Page 8: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/8.jpg)
8
Phenix Initial ZDC Rate vs Protons in RHIC
0
2000
4000
6000
8000
10000
12000
14000
0 20 40 60 80 100 120 140
Protons in RHIC, Blue/Yellow Average x 1011
Init
ial
PH
EN
IX Z
DC
Rat
e
5/9/06
![Page 9: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/9.jpg)
9
5/9/06
Luminosity loss 3 hrs into store vs date
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
25
-Fe
b-0
6
4-M
ar-0
6
11
-Ma
r-06
18
-Ma
r-06
25
-Ma
r-06
1-A
pr-0
6
8-A
pr-0
6
15
-Ap
r-06
22
-Ap
r-06
29
-Ap
r-06
6-M
ay-0
6
13
-Ma
y-06
% L
um
ino
sit
y L
os
s
![Page 10: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/10.jpg)
10
5/6/06
pp RUN05-06, hours at store
0
100
200
300
400
500
600
700
800
900
1000
0 2 4 6 8 10 12
Weeks in Physics mode
To
tal
Ho
urs
RUN05
RUN06
![Page 11: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/11.jpg)
11
pp RUN05-06, PHENIX Integrated Luminosity (delivered)
0
5
10
15
20
25
30
35
40
45
0 7 14 21 28 35 42 49 56 63 70 77 84
PHENIX Days in Physics mode
Inte
gra
ted
Lu
min
osi
ty (
pb
-1)
RUN05
RUN06
5/8/06
![Page 12: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/12.jpg)
12
RHIC Run 6 - For Discussion
Plan A (present plan): • 5 Jun: end 200 GeV run, begin 22 GeV test run• 6 Jun: end 22 GeV test run, begin 62 GeV run• 20 Jun: end 62 GeV run, begin 500 GeV development• 26 Jun: end RHIC operations with beam• Plan B (proposed): • 5 Jun: end 200 GeV run, begin 22 GeV test run• 6 Jun: end 22 GeV test run, begin 500 GeV development• 12 Jun: end 500 GeV development, begin 62 GeV run • 26 Jun: end RHIC operations with beam
5/9/06
![Page 13: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/13.jpg)
13
RHIC Run 6 - For Discussion
A short history (from my Tuesday meeting notes): Date 62 GeV Start Date through 4/18 5/28 (with usual caveats)
4/25 6/1 (added 4 days to schedule as a result of unscheduled shutdown - flag the we needed to "revisit the schedule")
5/2 6/6 (added another 4 days to the schedule, maxing out possible calendar days for RHIC Run 6 and scheduled the 22 GeV test run before 62 GeV run - raised issue that we should consider moving the 62 GeV run to the end to minimize the possible negative impact of the Accelerator Conference on the 500 GeV development run)
5/9 6/6 vs 6/12
5/9/06
![Page 14: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/14.jpg)
14
RHIC Machine/Detector Planning Meeting
Archive
![Page 15: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/15.jpg)
15
Run6 RHIC p^p^ Integrated Luminosity for Physics
0.02.04.06.08.0
10.012.014.016.018.020.022.024.026.028.030.0
4-M
ar
11
-Ma
r
18
-Ma
r
25
-Ma
r
1-A
pr
8-A
pr
15
-Ap
r
22
-Ap
r
29
-Ap
r
6-M
ay
date
Inte
gra
ted
Lu
min
os
ity
[p
b^
-1]
STAR
PHENIX
min
max
current as of 5/8/06
PHENIX Radial Goal (min)10 pb-1 delivered
PHENIX long pol begins
![Page 16: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/16.jpg)
16
BNL Energy Use FY 2005-6(C-AD Bldg 911 power is in AGS-Exp/Mach)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
31
-Ma
r-0
4
31
-Ma
y-0
4
31
-Ju
l-04
30
-Se
p-0
4
30
-No
v-0
4
31
-Ja
n-0
5
31
-Ma
r-0
5
31
-Ma
y-0
5
31
-Ju
l-05
30
-Se
p-0
5
30
-No
v-0
5
31
-Ja
n-0
6
31
-Ma
r-0
6
31
-Ma
y-0
6
Date
Da
ily A
ve
rag
e P
ow
er
(MW
)
$-
$10
$20
$30
$40
$50
$60
$70
$80
$90
$100
$110
$/M
Wh
r
RHIC Cryo RHIC other AGS-Mach
Tandem Booster AGS-Exp
NSRL CAD Bldg Site Base
Peak-Av $/MWhr
As of 30 Apr 2006
![Page 17: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/17.jpg)
17
RHIC Run 6 as run/revised plan• 1 Feb – Cool-down begins• 7 Feb – 1st beam in blue ring• 12 Feb – 1st beam in yellow beam• 5 Mar – Machine Physics Mode declared (4.6 weeks into run)• 8 Mar – PHENIX in Physics Mode – radial pol (5 weeks into run – on schedule)• 12 Mar – STAR in Physics Mode – long pol (5.6 weeks into run)• 12 Mar – begin 11.0 weeks of s=200 GeV pp (0.6 weeks behind schedule)• 6 Apr – STAR switch to trans pol• 14 April – unscheduled shutdown (incr. power use at ~50% of full operations)• 21 April – unscheduled shutdown ends – lost ~ 7 days• 22 April –PHENIX back on (lost 8 days)• 24 April – STAR back on (lost 10 days)• 26 Apr – PHENIX completed radial polarization, switched to longitudal• 10 May – STAR switch to longitudal polarization (plan)• 5 Jun – end 11.0 weeks s=200 GeV pp, begin s=22 GeV development• 6 Jun - begin setup s=62 GeV pp – add BRAHMS• 20 Jun – end 2 week s=62 GeV pp, begin s=500 GeV development• 26 Jun – end s=500 GeV development, begin warm-up to LN2
• 29 Jun – RHIC Cryo switch to LN2 complete, end 21.1 weeks of cryo operation
5/9/06
![Page 18: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/18.jpg)
18
The 14.5 week pp “physics” plan, Run6
s = 200 GeV/c (1st 11 weeks)
s = 62.4 GeV/c (next 2 weeks)
– 2 weeks physics• STAR Transverse• PHENIX Transverse• BRAHMS Transverse
s = 500 GeV/c (last 1 week)
– Machine Development
• 0.5 week contingency, use to be determined
![Page 19: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/19.jpg)
19
RHIC Run 6 Original Plan• 1 Feb – Begin cool-down• 8 Mar –Physics Mode for machine and experiments (5 weeks into
run)• 8 Mar – begin 11 weeks of s=200 GeV pp• 24 May – end 11 weeks s=200 GeV pp• 24 May begin setup s=62 GeV pp• 7 Jun – end 2 week s=62 GeV pp• 7 Jun – begin 1 week s=500 GeV pp development• 14-18 Jun – Contingency (end 14.5 weeks “Physics”)• 18 Jun – begin cyro warm-up • 21 Jun – RHIC Cryo warm-up complete, end 20.0 weeks of cryo
operation
![Page 20: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/20.jpg)
20
RHIC Run 7 – first look at possible run plan
• PHENIX– Long Au-Au run at s=200 GeV/n– pp development, especially for s=500 GeV
• STAR– d-Au at s=200 GeV/n– pp development
![Page 21: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/21.jpg)
21
11 physics weeks at 200 GeV, (20 weeks cryo operation)
STAR/PHENIX Goals - Transverse
STAR Goal - Longitudal
![Page 22: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/22.jpg)
22
2 physics weeks at s = 62.4 GeV
PHENIX and BRAHMS Goal
![Page 23: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/23.jpg)
23
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Colliding Beams
RHIC Research with 100x100 GeV pp
RHIC Research with 31x31 GeV pp
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2006
30 Jan 06
setup/ramp up luminosity
The Plan
20 weeks
Sep
schedule to be determined
1 Feb
21 Jun
14.5 weeks
Commissioning
Contingency
0.5 Week Cont'when to use TBD
![Page 24: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/24.jpg)
24
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Colliding Beams
RHIC Research with HI
RHIC Research with pp
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
(NASA Schedule to be determined)
Shutdown (RHIC)
C-A Operations-FY07
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2006
14 Mar 06
setup/ramp up luminosity
34 week Draft Plan
34 weeks
Sep
concurrent with RHIC
16 Oct 11 Jun
28.5 weeks
Commissioning
Contingency
species, energy and/or schedule TBD
![Page 25: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/25.jpg)
25
1.7
6.0
5.6
0.2
2.52.7
1.5
2.8
1.0
1.8 1.8
6.4
5.3
2.63.1
1.6
2.9
1.2
1.9
26.1102.2105.410.253.368.543.386.671.9 84.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
3/05 to 3/11
3/12 to 3/18
3/19 to 3/25
3/26 to 4/01
4/02 to 4/08
4/09 to 4/15
4/16 to 4/22
4/23 to 4/29
4/30 to 5/06
5/07 to 5/13
period
inte
gra
ted
lu
mn
ios
ity
[p
b^
-1]
0
20
40
60
80
100
120
Run 6 (p^p^) -- Integrated Luminosity by week
ho
urs
pe
r w
ee
k a
t s
tore
Phenix STAR (lumi) hours at store
current as of 5/08/06
![Page 26: 1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?](https://reader033.fdocuments.net/reader033/viewer/2022061516/56649ea35503460f94ba72dc/html5/thumbnails/26.jpg)
26
1.9
0.3
0.7
1.1
1.3
1.7 1.7
0.8
1.7
1.2
1.6
0.3
0.91.0
1.2
1.6 1.6
0.7
2.1
1.1
79
96
76
89
101 101 104107
71
80
0.0
0.5
1.0
1.5
2.0
2.5
4/16 to 4/22
4/23 to 4/29
4/30 to 5/06
5/07 to 5/13
5/14 to 5/20
5/21 to 5/27
5/28 to 6/03
6/04 to 6/10
6/11 to 6/17
6/18 to 6/24
period
inte
gra
ted
lu
mn
iosi
ty [
pb
^-1
] (l
on
git
ud
inal
p
ola
riza
tio
n)
0
20
40
60
80
100
120
Run 5 (p^p^) -- Integrated Luminosity by week
ho
urs
per
wee
k at
sto
re
Phenix STAR hours at store