Part IIIPerformance evaluation and design
of manufacturing systems
![Page 2: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/2.jpg)
2
ObjectivesObjectives
Understanding important performance measures of Understanding important performance measures of manufacturing systems manufacturing systems
Understanding the impact of random perturbation on Understanding the impact of random perturbation on manufacturing systemsmanufacturing systems
Developping a system theory approach for Developping a system theory approach for performance evaluation and design of manufacturing performance evaluation and design of manufacturing systems systems
![Page 3: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/3.jpg)
3
ProblemsProblems
Manufacturing systems engineering not as advanced Manufacturing systems engineering not as advanced as other fields of engineeringas other fields of engineering
PractitionPractitioners encouraged to rely on gurus, slogans, ers encouraged to rely on gurus, slogans, and black boxesand black boxes
Gap between theoreticians and practitionersGap between theoreticians and practitioners
Separation of product, process, and system designSeparation of product, process, and system design
![Page 4: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/4.jpg)
4
ProblemsProblems
Confusions about objectivesConfusions about objectives
•maximize capacitymaximize capacity
•minimize capacity variabilityminimize capacity variability
•maximize capacity utilizationmaximize capacity utilization
•minimize leadtimeminimize leadtime
•minimize leadtime variabilityminimize leadtime variability
•maximize profitmaximize profit
System issues are often studied last, if at all.System issues are often studied last, if at all.
![Page 5: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/5.jpg)
5
ProblemsProblems
Manufacturing gets no respectManufacturing gets no respect
•Systems not designed with engineering methodsSystems not designed with engineering methods
•Product designers and sales staff are not informed Product designers and sales staff are not informed of manufacturing costs and constraintsof manufacturing costs and constraints
Black box thinkingBlack box thinking
•Factories not treated as systems to be analyzed Factories not treated as systems to be analyzed and engineeredand engineered
•Simplistic ideas often used for management and Simplistic ideas often used for management and design.design.
![Page 6: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/6.jpg)
6
ProblemsProblems
Reliable systems intuition is lacking. As a Reliable systems intuition is lacking. As a consequence, there is …consequence, there is …
•Management by softwareManagement by software
•managers buy software to make production managers buy software to make production decisions, rather than to aid in making decisionsdecisions, rather than to aid in making decisions
•Management by sloganManagement by slogan
•Gurus provide simple solutions which sometimes Gurus provide simple solutions which sometimes work. Sometimes.work. Sometimes.
![Page 7: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/7.jpg)
7
ObservationsObservations
When a system is not well understood, rules When a system is not well understood, rules proliferate.proliferate.
This is because rules are developed to regulate This is because rules are developed to regulate behaviorbehavior
But the rules lead to unexpected, undesirable But the rules lead to unexpected, undesirable behavior.behavior.
New rules are developed to regulate the new behavior.New rules are developed to regulate the new behavior.
Et cetera.Et cetera.
![Page 8: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/8.jpg)
8
Observations - exampleObservations - example
A factory starts with one rule: A factory starts with one rule: do th latest jobs firstdo th latest jobs first..
Over time, more and more jobs are later and later.Over time, more and more jobs are later and later.
A new rule is added: A new rule is added: treat the highest priority treat the highest priority customers orders as though their due dates are two customers orders as though their due dates are two weeks earlier than they areweeks earlier than they are..
The low priority customers find other suppliers, but the The low priority customers find other suppliers, but the factory is still late.factory is still late.
![Page 9: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/9.jpg)
9
Basic issuesBasic issues
Frequent new product introductionsFrequent new product introductions
Product lifetimes often shortProduct lifetimes often short
Process lifetimes often shortProcess lifetimes often short
This leads to frequent building and rebuilding of This leads to frequent building and rebuilding of factories.factories.
![Page 10: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/10.jpg)
10
Basic issues – consequent needsBasic issues – consequent needs
Tools to predict performance of proposed factory Tools to predict performance of proposed factory design.design.
Tools for optimal real-time management (control of Tools for optimal real-time management (control of facories.facories.
Manufacturing systems engieering professionals who Manufacturing systems engieering professionals who understand factories as complex systemsunderstand factories as complex systems
![Page 11: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/11.jpg)
11
Basic issues – Quantity, quality and variabilityBasic issues – Quantity, quality and variability
Quantity – how much and whenQuantity – how much and when
Quality – how well.Quality – how well.
We emphasize We emphasize quantityquantity..
General statement: variability is the enemy of General statement: variability is the enemy of manufacturing.manufacturing.
![Page 12: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/12.jpg)
12
Basic issues – conceptsBasic issues – concepts
Nothing happens until everything is present.Nothing happens until everything is present.
Operationspart
Consumable
part
waste
operator
machine
![Page 13: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/13.jpg)
13
Basic issues – conceptsBasic issues – concepts
Waiting: whatever does not arrive last must wait.Waiting: whatever does not arrive last must wait.
Inventory : parts waitingInventory : parts waiting
Underutilization: machine waitingUnderutilization: machine waiting
Idle work force: operators waiting.Idle work force: operators waiting.
![Page 14: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/14.jpg)
14
Kinds of systemsKinds of systems
Flow shop, flow line, tranfer line, production line
machine Buffer ou stock tampon
Traditionally used for high volume, low variety production.
![Page 15: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/15.jpg)
15
Kinds of systemsKinds of systems
Assembly system
Assembly systems are trees, and may involve thousands of parts.
![Page 16: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/16.jpg)
16
Kinds of systemsKinds of systems
Closed loop lines with limited number of pallets
Pallets or fixtures travel in a closed loop.
empty pallet buffer
![Page 17: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/17.jpg)
17
Kinds of systemsKinds of systems
Reentrant systems
Semiconductor fabircation is highly reentrant.
type 1 type2
![Page 18: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/18.jpg)
18
Kinds of systemsKinds of systems
Job-shops:
Machines not organized according to process flow.
Often, machines grouped by department
Great variety of products.
Different products follow different paths.
Complex management.
![Page 19: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/19.jpg)
19
Two issuesTwo issues
Effient design of systems
Efficient operation of systems after they are built.
![Page 20: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/20.jpg)
20
TimeTime
Most factory performance measures are about time.
Production rate: how much is made in a given time.
lead time: how much time before delivery
cycle time: how much time a part spends in the factory (leadtime)
delivery reliability: how often a factory delivers on time
capital pay-back period: the time before the company get its investment back.
![Page 21: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/21.jpg)
21
TimeTime
Time appears in two forms
•delay
•capacity utilization
Every action has impact on both.
![Page 22: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/22.jpg)
22
Time – Capacity utilizationTime – Capacity utilization
An operation that takes 10 min takes up 10 min of the available time of
a machine
an operator
or other resources
Since there are a limited number of minutes of each resource available, there are a limited number of operations that can be done.
![Page 23: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/23.jpg)
23
Time – Production rateTime – Production rate
Operation time: the time that a machine takes to do an operation
Production rate: the average number of parts produced in a time unit (also called throughput)
If nothing interesting happens (no failures, etc)
Production rate = 1 / operation time
… but something interesting always happens.
![Page 24: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/24.jpg)
24
Time – CapacityTime – Capacity
Capacity: the maximum possible production rate of a manufacturing system, for systems that are making only one part type.
•Short term capacity: determined by the resources available right now
•Long term capacity: determined by the average resource availability
Capacity is harder to define for systems making several part types. It depends on the product mix.
![Page 25: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/25.jpg)
25
Randomness, variability, uncertaintyRandomness, variability, uncertainty
Factories are full of random events:
•machine failures
•changes in orders
•quality failures
•human variability
The economic environment is uncertain
•demand variations
•supplier unreliability
•changes in costs and prices
![Page 26: 1 Part III Performance evaluation and design of manufacturing systems.](https://reader033.fdocuments.net/reader033/viewer/2022051516/56649dc95503460f94abf6c9/html5/thumbnails/26.jpg)
26
Randomness, variability, uncertaintyRandomness, variability, uncertainty
Therefore, factories should be
•designed as reliable as possible, to minimize the creation of variability
•designed with shock absorbers, to minimize the propagation of variability
•operated in a way that minimizes the creation of variability
•operated in a way that minimizes the propagation of variability.