1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field...

12
1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept Identified. Vessel Handling Support Concept Identified. Hard Points and Access Identified. Preliminary Stress Analysis Complete.

description

3 WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

Transcript of 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field...

Page 1: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

1

NCSXWBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03

STATUS

Study is for 120 degree VVSA field period assembly.• Vessel Installation Support Concept Identified.• Vessel Handling Support Concept Identified.• Hard Points and Access Identified.• Preliminary Stress Analysis Complete.

Page 2: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

2

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept

Geometry• Gravity Load

- Hung from vessel top surface bosses and lugs to shell.- 6 point suspension(2 per period).

• Vertical Upward Load- reacted either by outboard lugs at NB ports or- by 6 points on lower surface (2 per period).- choice driven by convenience and magnitude of load.

• Radial and Lateral (toroidal) Loads.- reacted by lugs at NB ports.

Page 3: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

3

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

VESSEL

THREADEDLUG

BOSS

SPHERICALBEARING

SHELL

LOCKNUT

VESSEL HANGER CONCEPT

STEPPEDSTRUT

1 InchMax

Page 4: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

4

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

Top Mount Pros• Permits line of sight access from outside through shell.

( installation from outside shell)• Permits tension rod (small cross section).

Top Mount Cons• Thermal growth is all downward, not symmetric from

midline.• Requires additional penetration into vessel.

Page 5: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

5

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

Page 6: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

6

Top Suspension Rational• Difficult to achieve 6 points (minimum) on midline with

clear access.• Thermal growth is predictable and easy to compensate for.• Midline mounts would induce large bending moments.• Boss penetrations are simple and equivalent to port

installations.

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03Vessel Installation Concept Contin.

Page 7: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

7

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03STRESS ANALYSIS

• ASSUMPTIONS– Gravity load on 120 degree field period – Hung from two top hard points– Modeled without ports to save time– Equivalent weight with ports used in model(more

flexible than real case)RESULTS– Stress in wall only 5 ksiREMAINING WORK– Model rerun with ports– Detailing mounts

Page 8: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

8

VM Stress (Mechanica)

Page 9: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

9

VM Stress

Clevis #1 Clevis #2

Page 10: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

10

Geometry• 4 point mount to shell.

– Two inboard upper hard points used for installation.– Two hard points outboard on top.

• 2 optional locations on bottom, outboard.

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03Vessel Handling Concept

Page 11: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

11

• Top location for all 4 hard points permits lift with crane.• Utilizing inboard points and all four outboard points

(top/bottom) would give handling flexibility.– Lower mounts could take load off while adjusting

upper mounts.– Lower mounts could be used to react vertical loads.

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03Vessel Handling Concept Contin.

Page 12: 1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

12

WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03 Vessel Handling Concept Contin.Handling Procedure (abridged version)a. Mount vessel period to fixture using vertical ports, NB port. Install

insulation, diagnostics, etcb. Manipulate coil/shell assys over vessel ends with handler and bolt up to

each other.c. Install 4 vessel hangers and radial lugs at NB port to shell and align

vessel.d. Install TF coils.e. Install port extensions.f. Release vessel from fixture, suspending it from shell.g. Perform field period testing, metrology.h. Transport assembly to site and mate to other period sectors.i. Remove two outboard vessel hangers.