![Page 1: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/1.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Band Saw (HH Roberts)
Equipment Location: Metal Studio, Room 122
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electric Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 2: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/2.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: 6 inch Belt Sander
Equipment Location: Metal Studio Room 120
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 3: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/3.jpg)
2
![Page 4: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/4.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Buffer
Equipment Location: Metal Studio Room 120
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 5: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/5.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Cold Saw
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 6: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/6.jpg)
2
![Page 7: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/7.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Drill Press (Delta)
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Insert Picture
Insert
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical End of cord Plastic clamshell and padlock
Stop machine, unplug cord, and install clamshell, lock, and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 8: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/8.jpg)
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Drill Press (HM Machinery)
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Breaker box (switch unknown-see supervisor)
Plastic breaker adaptor
Stop machine, flip breaker switch to the off position, install plastic breaker adaptor, lock, and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 9: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/9.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Electric Section Bender
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 10: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/10.jpg)
2
![Page 11: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/11.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Ironworker
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 12: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/12.jpg)
2
![Page 13: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/13.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Metal Lathe (King 1236, King 1440)
Equipment Location: Metal Studio Room 123
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 14: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/14.jpg)
2
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Metal Lathe (Southbend and Myford)
Equipment Location: Metal Studio Room 123
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical End of cord Plastic clamshell and padlock
Stop machine, unplug cord, and install clamshell, lock, and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 15: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/15.jpg)
3
![Page 16: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/16.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Metal Shear
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Breaker box
Plastic breaker adaptor
Stop machine, flip breaker switch. install plastic breaker adaptor, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 17: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/17.jpg)
2
![Page 18: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/18.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: MIG Welder
Equipment Location: Metal Studio
Total # of Energy Isolation Devices/locks:
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical End of cord Plastic clamshell and padlock
Stop machine, unplug cord, and install clamshell, lock, and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 19: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/19.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Pedestal Grinder
Equipment Location: Metal Studio Room 122
Total # of Energy Isolation Devices/locks:
NOTICE BEFORE SERVICING THIS MACHINE, NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical End of cord Plastic clamshell and padlock
Stop machine, unplug cord, and install clamshell, lock, and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 20: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/20.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Resistance Spot Welder
Equipment Location: Metal Studio Room 120
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE , NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date:
![Page 21: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/21.jpg)
2
![Page 22: 1. LOTO Procedure · PERFORM LOCKOUT TAGOUT PROCEDURE. Energy Source Location Type of EID/lock to be used Steps for locking & tagging Verification Procedure . Electrical End of cord](https://reader033.fdocuments.net/reader033/viewer/2022043010/5f9f58fb1d58da4fa0605ce4/html5/thumbnails/22.jpg)
1. LOTO Procedure
LOCKOUT TAGOUT PROCEDURE
Equipment
Identification
Equipment Name/Description: Turret Milling Machine
Equipment Location: Metal Studio Room 123
Total # of Energy Isolation Devices/locks:
1
NOTICE BEFORE SERVICING THIS MACHINE, NOTIFY AFFECTED PERSONNEL. ONLY PROPERLY TRAINED AND AUTHORIZED PERSONNEL SHALL PERFORM LOCKOUT TAGOUT PROCEDURE
Energy Source
Location Type of EID/lock to be used
Steps for locking & tagging
Verification Procedure
Electrical Junction Box
Lockout Hasp Stop machine, pull disconnect arm to the off position, align the holes, install lockout hasp, lock and tag.
Attempt to start machine, visually confirm it will not start.
IF SYSTEM CANNOT BE LOCKED OUT OR IF SYSTEM FAILS VERIFICATION PROCEDURE, STOP & CONTACT YOUR SUPERVISOR
*LOTO Procedure # A-xxxxxxx Revision #:
Approved by: Date: