1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to...

63
1 Homes by Reardon All American

Transcript of 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to...

Page 1: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

1

Homes by ReardonAll American

Page 2: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

2

Introduction

We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride in the work that we accomplish. We employ skilled, trained and licensed professionals. All of our tasks are completed within all applicable building codes.

My name is Bill Reardon and I can assure you that the work completed at your home or business will be completed to your satisfaction. We strive to complete work on time and create a safe job sight.

Page 3: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

3

PAST PROJECTS

Beautiful home in Virginia Highlands. Starting to raise a second story.

Page 4: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

4

Rear View Before

The back of the house had an existing master bath that was to be removed and rebuilt to a larger scale.

Page 5: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

5

Demo Day

Now you se it no

The demolition is underway both for the bathroom and the roof.

Page 6: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

6

Master Bath

Out with the old and in with the new. All the debris is hauled off and the forms for the new concrete are set. The heated floor system is installed and we are ready for concrete.

Page 7: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

7

Second Story Floor System

The floor system is built and insulated. The tarps are due to rain. We take every precaution when working on someone’s home or business.

Page 8: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

8

Master Bath Framing

Still raining and we are still working.

Page 9: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

9

Second Story Framing

No one can say we don’t get into our work!

Page 10: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

10

Rear View

The framing is complete and the roof has been installed.

Page 11: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

11

New Roof

The shingles were matched up with the lower existing roof. Notice the nice straight lines. They are there because we care.

Page 12: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

12

Plumbing

The plumbing has been installed.

Page 13: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

13

Electrical

The electrical system was updated.

Page 14: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

14

The Driveway Side

The windows were installed and the exterior was treated with stucco (Real Stucco). That’s Bill up there. He really gets into his work!

Page 15: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

15

The HVAC System

The attic was partially untouched to provide space for the HVAC system.

Page 16: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

16

Fireplace in the new great room

The client decided to go with the vent free gas log unit.

Page 17: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

17

New sheetrock installation

The sheetrock was installed instead of plaster which really updated the look.

Page 18: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

18

Addition of hot water heater

The units were installed to create a total of 80 gal of hot water.

Page 19: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

19

Durock Installation

Durock was installed on all surfaces to be tiled.

Page 20: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

20

Tile Installation

All Durock surfaces were treated with waterproofing agents. The tiles were laid with an artisans touch.

Page 21: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

21

More tile work

Rope accents were used.

Page 22: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

22

Master Shower and steam room

Rainfall showerheads and steam units were installed.

Page 23: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

23

Master shower windows

A great accent for lots of natural light.

Page 24: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

24

Frameless shower door

Brushed hardware.

Page 25: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

25

Porch over new master bath

Wonderful textured tile was used.

Page 26: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

26

New upstairs bathroom

Nice Jacuzzi tub and Corianne counter.

Page 27: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

27

Border in upstairs bath

Beautiful accent border.

Page 28: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

28

Mantel and hardwood floors

Custom built oak mantel built the old fashion way. Oak hardwood floors laid with a craftsmen's touch.

Page 29: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

29

Great room paint and stain

Wonderful golden oak

Page 30: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

30

Great room handrail

Custom handrail to downstairs.

Page 31: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

31

Great room doors to back porch

A spectacular view of the pool.

Page 32: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

32

Master bath

Beautiful cabinetry and solid surface counter tops.

Page 33: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

33

Master bath

Second cabinet and French doors to master bedroom.

Page 34: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

34

Back porch hand rail & stairs installed

Attention to detail such as rounded corner sanded surfaces. So smooth to the touch.

Page 35: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

35

Paint

With two coats of primer and two coats of Sherwin Williams Super Paint.

Page 36: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

36

More Paint

All surfaces are sprayed to get that even and uniform look.

Page 37: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

37

Rear view all painted

Spectacular view from the pool house.

Page 38: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

38

Back porch

Now wouldn’t you like to sit on this porch!!

Page 39: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

39

New upstairs bedroom

All doors were custom made to match the existing ones.

Page 40: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

40

The Tree Topper

This is a few photos of the damage a tornado can cause and how we go about repairing the damage.

Page 41: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

41

Tree through the Pie

These are actually round houses built on a centered concrete pole in Big Canoe.

Page 42: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

42

Demo day

We removed all the debris and inspected the structure.

Page 43: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

43

Main structure

We had to fabricate and install new beams.

Page 44: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

44

Piece of the pie replaced

Rebuild the walls and install a new glass door.

Page 45: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

45

Roofing day

Cedar shingles installed. Of course its raining, but that gives Bill a chance to wear his hat.

Page 46: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

46

Insulation installed

Insulation installed and sealed properly, always attention to detail.

Page 47: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

47

Roof

Craftsmanship

Page 48: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

48

Finished putting the pie back together

The owner is going to try to do his own handrail. He is a pretty handy guy.

Page 49: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

49

Commercial Properties

The pictures are of a Butler Tire Store in Atlanta. It needed a face lift so we gave it one.

Page 50: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

50

Shop area

The interior was gutted, scraped and pressure washed. Then a new coat of industrial paint was applied.

Page 51: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

51

Shop

A job is not done till all the clean up is finished.

Page 52: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

52

Rear of Shop

The colors were taped off one by one and paint was applied.

Page 53: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

53

Right side

Love that color scheme.

Page 54: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

54

Front of building

There’s those red trucks again.

Page 55: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

55

A happy customer again!

This job may not look that difficult but it was completed in a day and a half. The shop did not miss a penny of income. Our commitment is to our client.

Page 56: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

56

Build it and they will come ……..to relax!

The following are pictures of a place the homeowner can enjoy. The original deck was only a 10x10, now the home owners have plenty of space to entertain.

Page 57: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

57

Front View

First we painted and put a new roof on.

Page 58: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

58

Rear View

Then we added a bigger door. Constructed a two tier deck system. We then installed a hot tub. We even plumbed a gas line for the grill.

Page 59: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

59

Big screen room

We constructed a nice screen room complete with ceiling fan and drink rail.

Page 60: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

60

Front view

We cleaned up our sight and left the happy homeowner to enjoy the new upgrade.

Page 61: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

61

The photos that you have seen are but a small part of what we can accomplish for our customers.

We work very hard for our customers. The house in Virginia Highlands was completed in less than six months.

The tree topper was completed in a week.

The relaxation house was completed in 1 ½ weeks.

Page 62: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

62

If you would like to talk to us about your , new construction, addition, remodel, deck work, basement finishing, Interior or exterior paint work, then please give us a call. We will be more than happy to come out and meet with you, quote and get you on the schedule to make your dreams a reality. Again, thank you for taking the time out of your busy schedule to look at us!

Homes by Reardon/All American

770-475-2895

www.HomesbyReardon.com

Page 63: 1 Homes by Reardon All American. 2 Introduction We would like to thank you for taking the time to review past projects. At Homes by Reardon we take pride.

63

When a customer buys a low-grade article, he feels pleased when he pays for it and displeased every time he uses it. But when he buys a well-made article, he feels extravagant when he pays for it and well pleased every time he uses it.

Herbert N. Casson