1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13,...

8
1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13,

Transcript of 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13,...

Page 1: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

1HiLoad during DP Operation – November 2010

Docking and Attachment Test Norway - December 13, 2010

Page 2: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

2Approach to Submersible Barge on DP

Page 3: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

3

Attachment System Activated Maneuvering of Barge by HiLoad DP

Page 4: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

4HiLoad during DP Operation – November 2010

Page 5: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

5

First Ballast Test – Oct 2010First Ballast Test – Oct 2010

Page 6: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

6HiLoad during DP Operation – November 2010

Page 7: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

7HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in NorwayHiLoad DP at 42 m draught (138 feet)

HiLoad DP No. 1 – In OperationHiLoad DP No. 1 – In Operation

Page 8: 1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010.

8HiLoad DP No. 1 in Transit to Test Location on the West Coast of NorwayHiLoad DP No. 1 at “Sea Trial Base” in Norway

28.0 m 27.0 m

42.0 m42.0 m

Min draught17.0 m