![Page 1: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/1.jpg)
1
GESAGE Substation Automation
for the world
![Page 2: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/2.jpg)
2
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic
> Relay to relay data communication
> Local/Bay control
> WAN
> SCADA
Agenda
![Page 3: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/3.jpg)
3
Requirements:
• Most up to date CPU’s yet expect 20 to 30 year MTBF.
• Built in programmable controller functionality
• High speed relay to relay data communication
• Expandable:
• I/O
• Multiple CT and VT Modules with the ability to calculate virtual sources
Solution:
•Modularity
Protective Relay
Introduction
![Page 4: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/4.jpg)
4
Requirements:
• Reusable code to reduced development time
• Reduce training requirements: family of protective
relays with same touch and feel and common
feel and common hardware components
Solution:
• Design must be based on a Platform
Protective Relay
Protective Relay
![Page 5: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/5.jpg)
5
• High speed relay to relay service part of a protocol suite optimized for Utility applications
• Redundant Star fiber configuration:
• elimination of single point failures
• Readily available proven LAN components
• Open Architecture
Relay to Relay Communications
Introduction
Primary
Back-up
![Page 6: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/6.jpg)
6
• High speed HMI service part of a protocol suit optimized for Utility applications.
• Standard naming convention
• Direct connection to high speed substation LAN.
• User configurable graphics display.
• Primary graphic, control and monitoring functions
Local / Bay Control
Introduction
Local/Bay control
![Page 7: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/7.jpg)
7
WAN Requirements
Substation 1 Substation 2
Substation 3 Substation 4
Redundant fiber WAN
Introduction
![Page 8: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/8.jpg)
8
Supervisory Control and Data Acquisition - SCADA
Enterprise
• Budget accurately
• Asses cost of service
• Allocate capacity
• Faster service response
Operations
• Remote status and control
• Analyze power quality
• Identify events
• Receive fault records
• Target Maintenance
• Loading trends
Introduction
Information not Data:
![Page 9: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/9.jpg)
9
Data Communications Hierarchy
Introduction
![Page 10: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/10.jpg)
10
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic engine
> Relay to relay data communication
> Local/Bay control
> WAN
> SCADA
Agenda
![Page 11: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/11.jpg)
11
“The engine for substation automation”
The ‘Universal Relay’ Family
Protective Relay
![Page 12: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/12.jpg)
12
FeederFeederTransformerTransformer
GeneratorGenerator
TransmissionTransmissionLineLine
Cost ($)Cost ($)
PerformancePerformanceUniversal
Relay BusbarBusbar
Feeder Line Transformer Generator
Busbar ControlPowerQuality
The Challenges of the ‘Universal Relay’
Application Software
Protective Relay
![Page 13: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/13.jpg)
13
High-Speed Data BusHigh-Speed Data Bus
Po
wer
Su
pp
ly
CP
UM
ain
Pro
ce
ss
or
DS
P &
Mag
net
ics
DS
P p
roce
sso
r +
CT
/VT
s
DIG
ITA
L I/
OSt
atus
Inpu
ts /
Con
trol
Out
puts
AN
AL
OG
I/O
An
alo
g T
ran
sd
uc
er
I/O
CO
MM
UN
ICA
TIO
NS
(Eth
ern
et, H
DL
C, U
AR
T)
DisplayDisplay
KeypadKeypad
LEDModules
LEDModules
LEDModules
LEDModules
LEDModules
LEDModules
Modular HMI Panel
Six BasicModules
Universal Relay Architecture - ‘Modularity’
Protective Relay
![Page 14: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/14.jpg)
14
19’’ Chassis(4RU high)
Physical Realization
Po
wer
Su
pp
ly
CP
UM
ain
Pro
cess
or
DSP
& M
agne
tics
DSP
pro
cess
or +
CT/
VTs
DIG
ITA
L I
/OSt
atus
Inpu
ts /
Con
trol
Out
puts
AN
AL
OG
I/O
Ana
log
Tran
sduc
er I/
O
CO
MM
UN
ICA
TIO
NS
(Eth
erne
t, H
DLC
, UA
RT)
ModularHMI
High-Speed Data BusHigh-Speed Data Bus
Modules
Protective Relay
![Page 15: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/15.jpg)
15
Modularity... P
ow
er S
up
ply
Power Supply
•Wide input range •24 - 300 VDC•20 - 265 VAC
•High Efficiency SMPS•> 80%
CPU
CP
UM
ain
Pro
cess
or
•High-speed 32-Bit RISC CPU
•> 50 MIPS, up to 120 MIPS
•FLASH memory •Easy firmware upgrades
High-Speed Comms support•10/100Mbps Ethernet LAN•Redundant Fiber
DSP + CT/VT
DS
P &
Mag
net
ics
DS
P p
roce
sso
r +
CT
/VT
s
•Modular CT/VT configurations • up to 8 CT/VTs
•High-speed digital sampling•>16 Bit A/D•> 64 samples / power cycle
•High-speed 16-Bit DSP•> 32 MIPS, up to 80 MIPS
Protective Relay
![Page 16: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/16.jpg)
16
•Control outputs •Solid State•Electromechanical - multiple types•Fast activation speeds (< 4ms)
•Status inputs•Dry and Wet contacts•18 - 300 VDC•Fast detection speeds (< 4ms)
DIG
ITA
L I/
OSt
atus
Inpu
ts /
Con
trol
Out
puts
Digital I/O
•Transducer type inputs •± dcmA•±Voltage•Resistive
•Outputs for Legacy SCADA•± dcmA
•Support multiple I/O configurations
Analog I/O
AN
AL
OG
I/O
An
alo
g T
ran
sdu
cer
I/O
Communications
CO
MM
UN
ICA
TIO
NS
(Eth
ern
et, H
DL
C, U
AR
T)
•High-speed Serial•Asynchronous (9600 - 115K Baud)•Synchronous (56K - 256K Bps)•Fiber Optical (Single/Multimode)•Channel Redundancy
Modularity...
Protective Relay
![Page 17: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/17.jpg)
17
Inter-Module Communications
High-Speed Data Bus
High-Speed Inter-Processor Serial Data Bus: 16Mbps
High-Speed Serial Communications Bus: 10Mbps
High-Speed Parallel Data Bus: 80 - 100 Mbytes/sec
Multiple buses allow for high-performance:•Protection and communications without bottlenecks
Protective Relay
![Page 18: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/18.jpg)
18
Scalability
Minimum
Maximum
Protective Relay
![Page 19: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/19.jpg)
19
‘Box’ Capacity
CT/VT (I & V) inputsup to 3 modules
Status (Binary) inputsup to 6 modules
Control (contact) outputsup to 6 modules
Analog (Transducer) I/Oup to 6 modules
24 (max)
8/module
96 (max)
16/module
48 (max)
8/module
48 (max)
8/module
Protective Relay
![Page 20: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/20.jpg)
20
Configuration/Flexibility
Sub-Modules
Protective Relay
![Page 21: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/21.jpg)
21
Sub-Module Types
Current & Voltage
Control and Status I/O
Analog (Transducer) I/O
CT, VT
Optical, DigitalFuture
Future
Form-AForm-C
Solid-StateWet/Dry Input
Customer - ??
1mA, 4-20mA, 0-5mARTD (Pt, Ni, Cu)5V, Resistive
Future Customer - ??
Protective Relay
![Page 22: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/22.jpg)
22
‘Upgradeability’/Serviceability
CT Shorting‘Clips’
Field Wiring Undisturbed
ModuleKeying
‘Plug n Play’
Easy ModuleDraw-out
Protective Relay
![Page 23: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/23.jpg)
23
•L60 (Transmission Line: Phase Comparison) •L90 (Transmission Line: Current Differential) •D60 (Transmission Line: Distance) •F3x (Feeder: Multiple Feeders - Basic Protection) •F60 (Feeder: Comprehensive w Hi-Z) •T60 (Transformer: Comprehensive) •C30 (Control IED) •C60 (Breaker Management IED)
TRANSMISSION
DISTRIBUTION
The UR Family - One Common Architecture
•URPC (Entry Level HMI, Engineering Tool)•PMCS (Full Featured Systems HMI)
•G60 (Generator: Comprehensive > 100MVA)•B30 (Busbar: Basic 6 Feeder ) •B90 (Busbar: Comprehensive up to 30 Feeders)
GENERATION (Available in 2000)
SYSTEMS SOFTWARE
The UR Family
Protective Relay
![Page 24: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/24.jpg)
24
The UR Family
Protective Relay
FEATURES
• FlexLogic™
• Distributed FlexLogic™
• Virtual I/O (reduce hardware cost)
• Expandable I/O
• Flash monory for field upgrades
• Drawout modules for serviceability
• Common modules (reduce spares cost)
• Test mode for forcing contact I/O states
• IRiG-B time synchronization
![Page 25: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/25.jpg)
25
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic engine
> Relay to relay data communication
> Local/Bay control
> WAN
> SCADA
Agenda
![Page 26: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/26.jpg)
26
UR FlexLogic™ Engine
RemoteRemoteInputsInputs
Protective Relay
![Page 27: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/27.jpg)
27
Introduction to Flexlogic
AND
Pickup
Forward
Remote Forward
AND
Operate
Assign Virtual
Protective Relay
![Page 28: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/28.jpg)
28
Protection Element
Enable
Block
Source
Pickup
Operate
Drop Out
Function Inputs
Function Outputs
Protective Relay
Introduction to Flexlogic
![Page 29: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/29.jpg)
29
Introduction to FLEX Logic
AND
Protective Relay
![Page 30: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/30.jpg)
30
OUTIN2
IN1
AND OUTIN2
IN1
NAND OUTIN2
IN1
OR
In1 In2 OUT
0 0 0
0 1 0
1 0 0
1 1 1
In1 In2 OUT
0 0 1
0 1 1
1 0 1
1 1 0
In1 In2 OUT
0 0 0
0 1 1
1 0 1
1 1 1
Truth Tables
Protective Relay
![Page 31: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/31.jpg)
31
OUTIN1
NOR OUTIN2
IN1
XOR OUTIN2
IN1
NOT
In1 In2 OUT
0 0 1
0 1 0
1 0 0
1 1 0
In1 In2 OUT
0 0 0
0 1 1
1 0 1
1 1 0
In1 OUT
1 0
0 1
Truth Tables
Protective Relay
![Page 32: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/32.jpg)
32
Timers
Protective Relay
Timer #
Pickup
Drop out
Pickup Time
Drop out Time
![Page 33: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/33.jpg)
33
Counters
Protective Relay
![Page 34: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/34.jpg)
34
Counters
Protective Relay
![Page 35: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/35.jpg)
35
FlexLogic Demonstration
Protective Relay
FlexLogic Demonstration
![Page 36: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/36.jpg)
36
FlexLogic™ Navigation
Protective Relay
![Page 37: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/37.jpg)
37
FlexLogic™ Navigation
Protective Relay
![Page 38: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/38.jpg)
38
Contact Outputs
Protective Relay
![Page 39: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/39.jpg)
39
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic engine
> Relay to relay data communication
> Local/Bay control
> WAN
> SCADA
Agenda
![Page 40: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/40.jpg)
40
LAN: Local area network
WAN: Wide Area Network
Nomenclature
Relay to Relay Com
![Page 41: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/41.jpg)
41
Nomenclature
Protocol: A common set of rules to govern the exchange of data
between nodes on a network.
It determines:
• Initialization of data link
• Services that are supported
• flow control
• Frame format and sync
• error control
![Page 42: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/42.jpg)
42
Communication Protocols and Standards
Messaging Services
• Provides “Common Services” for communicating information including notification of delivery or non-delivery of a message and the reason why not
• Types of services:-Initiate Communications-Identify-Define Data-Write Data-Program Invocation-Etc.
• Existing Standards: FMS, MMS, DNP, IEC
Data Communication Hierarchy
![Page 43: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/43.jpg)
43
Communication Protocols and Standards
Manufacturing Message Specification (MMS) • Internationally standardized messaging protocol for real time exchange of data and supervisory and control information between networked devices.
• ISO 9506 standard
• Independents from the application function being performed
• Independents from the developer of the device or application • Generic to be appropriate for a wide variety of devices and applications:
PLC Robot Protective relay
• Based on the OSI model
MMS services and messages are identical
![Page 44: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/44.jpg)
44
MMS Service Specification
• Defines a set of objects that can exist within a device.
• Defines a set of communication services to access and manipulate those objects.
• Defines the behavior of the device
to those communication services.
Data Communication Hierarchy
Communication Protocols and Standards
![Page 45: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/45.jpg)
45
MMS Services
• Get Object
• Change Object
• Determine Attributes
• Create Object
• Delete Object
Data Communication Hierarchy
Communication Protocols and Standards
![Page 46: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/46.jpg)
46
Peer to Peer• Client / Server
• Publisher/ Subscriber
Master / Slave• Request / Response
• Response Only
Basic Communication Relationships
Relay to Relay Com
![Page 47: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/47.jpg)
47
LAN Topology: Token RING
Relay to Relay Com
![Page 48: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/48.jpg)
48
LAN Topology: STAR
IED
IED
IEDIED
IEDSwitch
Active/ Passive
IED
Relay to Relay Com
![Page 49: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/49.jpg)
49
Architecture: Token Bus
• TOKEN to gain access to LAN
![Page 50: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/50.jpg)
50
LAN Access: Token
![Page 51: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/51.jpg)
51
LAN Access: CSMA/CA
1
1
01
0
0
Crash
Relay to Relay Com
• CSMA / CA• Carrier science multiple access with crash detection
![Page 52: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/52.jpg)
52
Communications: OSI Model
PHYSICAL
APPLICATION
SESSION
PRESENTATION
NETWORK
TRANSPORT
DATALINK
Data Communication Hierarchy
![Page 53: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/53.jpg)
53
AP DATA
MMS MODBUS
PHYSICAL
APPLICATION
SESSION
PRESENTATION
NETWORK
TRANSPORT
DATALINK
Data Communication Hierarchy
Communications: OSI Model
![Page 54: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/54.jpg)
54
AP DATA
MMS MODBUS
PHYSICAL
APPLICATION
SESSION
PRESENTATION
NETWORK
TRANSPORT
DATALINK
AP DATA
Data Communication Hierarchy
Communications: OSI Model
![Page 55: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/55.jpg)
55
Utility Communication Architecture (UCA) and Substation Automation
Relay to Relay Com
![Page 56: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/56.jpg)
56
Utility Communications Architecture Version 2
Objective:
• Establish a suite of protocols to meet utility communications needs
UCA 2.0
Relay to Relay Com
![Page 57: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/57.jpg)
57
• GE Power Management
• Basler
• Cooper
• Beckwith
• Tasnet
• SEL
• GE Harris
• Siemens (HMI)
• L&G
• Doble
• Dranetz / BMI
• Modicon / Square D
• ABB
• Alston
Participating UCA Vendors
Relay to Relay Com
![Page 58: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/58.jpg)
58
• American Electric Power (AEP)
• Indianapolis Power & Light
• Ontario Hydro
• Northern States Power
• Tampa Electric
• ComEd
• Cinergy
• Baltimore Gas & Electric
• GPU
• Nuon
• Enetergy
• TVA
• Duke
• Boston Edison
• Union Electric
• Florida Power Corp
• Southern California Electric
• Wisconsin Electric
• ESKOM
• Polish Power Grid
Utilities Participating in UCA
Relay to Relay Com
![Page 59: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/59.jpg)
59
UCA 2.0 is defined by a set of Documents
• Introduction
• Communication Profiles
- TCP/IP
- OSI
- Serial
• CASM
Common Application Service Models
How MMS Services are used (MMS = Manufacturing Message Specification)
• GOMSFE
Generic Object Models for Substation and Feeder Equipment
UCA 2.0 Defining Documents
Relay to Relay Com
![Page 60: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/60.jpg)
60
UCA Features
• Client/Server Multiple Connections
• Common Data Objects that can be extended by each vendor
• File Services
• Time Sync
• Reporting
• GOOSE (Generic Object Oriented Substation Event)
• Peer to Peer Communication (Remote I/O is a cast message)
Data Communication Hierarchy
Utility Communication Architecture - UCA 2.0
![Page 61: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/61.jpg)
61
7-LAYER UCA MODEL
CSMA/CD
(8802/3)
Token Bus
(8802/4)
TokenRing
(8802/5)
MMS
ACSE
FTAM VT DS MMS1988 CMIP
ROSE RTSE
Connection-orientated Presentation
MHS1984
Connection-orientated Session
Connection-orientated Transport 0 4
Connectionless Network
ES - IS Routing X.25 Packet Layer
ISDNQ.931
LLC 1
FDDI
HDLCLAPB
V.35EIA -232-D X.21
ISDNInterfaces
ISDNLAPD
Data Communication Hierarchy
Utility Communication Architecture - UCA 2.0
![Page 62: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/62.jpg)
62
UCA Data Access (Name - based)
Data ObjectClass
Functional Component
DataItem
Attributesr/w m/o
IOCSTSG Pu
PuDelTimDoDelTim
COCFDC
To access the Phases IOC 1 PickupRead PhsIOC1.SG.Pu
Data Communication Hierarchy
Utility Communication Architecture - UCA 2.0
![Page 63: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/63.jpg)
63
GOMSFE
Generic Object Models for Substation and Feeder Equipment
Models defined for:
Protection Elements - P IOC- PTOC- PDIS- RSYN- etc.
Metering - PXMU
Generic Analog/Digital I/O etc.
Data Communication Hierarchy
Utility Communication Architecture - UCA 2.0
![Page 64: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/64.jpg)
64
Trip Message(GOOSE)
Blocking Message(GOOSE)
RELAY #1 RELAY #2 RELAY #3L 9 0L I N E D I F F E R E N T I A L R E L A Y L 9 0L I N E D I F F E R E N T I A L R E L A Y
L 9 0L I N E D I F F E R E N T I A L R E L A Y
UCA 2.0 GOOSE MESSAGE
Relay to Relay Com
BreakerTrip Output
Input delay (4ms at present)+Tx/Rx and processing (Typically < 4ms at present)+Output delay (0.6 ms for Fast Form C)
= 8.6 ms
External Trip Delay:
![Page 65: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/65.jpg)
65
UR Communications Profiles
Modbus/TCP/IP/Ethernet UCA 2.0 (MMS/Ethernet)
Modbus/UART/(RS485, RS232, Fiber)
RFC1006 - Presentation
IEEE 802.3 (10BaseFL)
MMS
RFC1006 - Session
TP4
CLNP
IEEE 802.2 (CSMA/CD)Ethernet
RS232, RS485, Fiber
UART - 8 Bits, 1 Stop Bit, No Parity
ModBus
NOT Implemented/Required
MMS, ModBus
TCP/ IP, UDP
IEEE 802.3 (10BaseFL)
NOT Implemented/Required
IEEE 802.2 (CSMA/CD)Ethernet
Telecom: DS0 (64kbps), T1, E1
RS422, G.703, Fiber
HDLC
Proprietary, ModBus,
NOT Implemented/Required
Data Communication Hierarchy
PHYSICAL
DATA LINK
NETWORK
TRANSPORT
SESSION
PRESENTATION
APPLICATION
PHYSICAL
DATA LINK
TRANSPORT
SESSION
PRESENTATION
APPLICATION
NETWORK
PHYSICAL
DATA LINK
NETWORK
TRANSPORT
SESSION
PRESENTATION
APPLICATION
PHYSICAL
DATA LINK
NETWORK
TRANSPORT
SESSION
PRESENTATION
APPLICATION
![Page 66: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/66.jpg)
66
Goose Message Demonstration:
Relay to Relay Com
Goose Message Demonstration
![Page 67: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/67.jpg)
67
Redundant 10 Base F Bay LAN Topology
Fiber switches
Relay to Relay Com
![Page 68: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/68.jpg)
68
Virtual outputContact input
AND
Contact inputAND
Virtual output
FlexLogic: Relay 1
Remote output
Remote I/O lab
Relay 2
Remote Input
Remote input Status Table
ALARM Light
Relay to Relay Com
![Page 69: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/69.jpg)
69
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic engine
> Relay to relay data communication
> Local/Bay Control
> WAN
> SCADA
Agenda
![Page 70: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/70.jpg)
70
Universal Relay Human Machine Interface - HMI
HMIHMI
HMI Demonstration:
• Static Text and Graphics
• Importing bit maps
• Change screens
• Analog signal monitoring
• Push buttons
• Lamps
![Page 71: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/71.jpg)
71
Introduction
HMI
![Page 72: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/72.jpg)
72
Static text and graphics
HMI
![Page 73: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/73.jpg)
73
Static text and graphics
HMI
![Page 74: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/74.jpg)
74
Static text and graphics
HMI
![Page 75: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/75.jpg)
75
Importing bit maps
HMI
![Page 76: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/76.jpg)
76
Importing bit maps
HMI
![Page 77: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/77.jpg)
77
Importing bit maps
HMI
![Page 78: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/78.jpg)
78
Change Screens
HMI
![Page 79: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/79.jpg)
79
Change Screens
HMI
![Page 80: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/80.jpg)
80
Change Screens
HMI
![Page 81: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/81.jpg)
81HMI
Change Screens
![Page 82: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/82.jpg)
82HMI
Change Screens
![Page 83: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/83.jpg)
83
Inserting a Relay
HMI
![Page 84: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/84.jpg)
84
Inserting a Relay
HMI
![Page 85: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/85.jpg)
85
Analog Signal Monitor
HMI
![Page 86: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/86.jpg)
86HMI
Analog Signal Monitor
![Page 87: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/87.jpg)
87HMI
Analog Signal Monitor
![Page 88: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/88.jpg)
88HMI
Analog Signal Monitor
![Page 89: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/89.jpg)
89
Standard Push buttons
HMI
![Page 90: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/90.jpg)
90HMI
Standard Push buttons
![Page 91: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/91.jpg)
91HMI
Standard Push buttons
![Page 92: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/92.jpg)
92
Standard Lamps
HMI
![Page 93: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/93.jpg)
93
Standard Lamps
HMI
![Page 94: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/94.jpg)
94HMI
Standard Lamps
![Page 95: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/95.jpg)
95
Breaker Symbol Animation
HMI
![Page 96: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/96.jpg)
96
Breaker Symbol Animation
HMI
![Page 97: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/97.jpg)
97
Breaker Symbol Animation
HMI
![Page 98: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/98.jpg)
98
QuickPanel jr - Low Cost HMI
•Graphical user interface: single-line, metering, alarms
•Touch Screen: alarms control buttons
•Control multiple devices: Modbus Master via RS485
Modbus/RS485
HMI
QuickPanel jr
HMI
![Page 99: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/99.jpg)
99
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic engine
> Relay to relay data communication
> Local/Bay Control
> WAN
> SCADA
Agenda
![Page 100: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/100.jpg)
100
The UCA Substation
10MbpsDual Ethernet Fiber switch
Interoperable IEDs
Access to:•Enterprise•Internet
Data Communication Hierarchy
SlowerLegacy Devices
use Gateway
![Page 101: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/101.jpg)
101
Inter Substation Communications
FSC(Fiber Optic System Communications)
•SONET Technology: 51/155 Mbps•Ethernet LAN ‘Bridging’ capability•Creates single Ethernet WAN•Redundant channels ensure reliability
Data Communication Hierarchy
![Page 102: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/102.jpg)
102
InternetInternet
UR + UCA + Internet = New Possibilities
Remote monitoring and diagnostics:•Power Quality monitoring•Equipment Health (Breaker, Transformer) monitoring•Fault Analysis - data retrieval•Events and Alarm annunciation
The IEDs (Relays) are a ‘socket’ for providing information and services.
Data Communication Hierarchy
![Page 103: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/103.jpg)
103
Internet Communications NOW!
View/Retrieve:•Metering•Events•Oscillography
Test a UR F60Feeder Management
Relay over the Internet
Data Communication Hierarchy
![Page 104: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/104.jpg)
104
Substation Automation
> Requirements
> Protective relay hardware
> Protective relay logic engine
> Relay to relay data communication
> Local/Bay Control
> WAN
> SCADA
Agenda
![Page 105: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/105.jpg)
105
GESA 2000
SCADA
![Page 106: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/106.jpg)
107
W h y G E
• A Complete System Solution Supplier
• Global Focus With Engineering And Field Support
• Experience Over A Broad Range Of Industries
• A corporate commitment to six sigma quality
• Financial Strength
Dedicated to bringing the best Automation solutions to our customers
• Power system consulting
• Application design
• Project management
• Integration services
• Startup and comissioning
• Project financing
• Asset maintenance
• Remote diagnostics
SCADA
Substation Automation System Solutions
![Page 107: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/107.jpg)
108
PLANNING
ENGINEERING
PROTECTION
MAINTENANCE
Real-time Analysis that Avoids Interruptions
Precise and Confident Operator Decisions in Restoring Service
Reduction in the Need for Costly Field Visits
More Effective Long Term Planning & Loading Decisions
Translating data into information at the users fingertips
SCADA
GESA - A System Solution that Delivers Productivity
![Page 108: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/108.jpg)
109
The Challenge: Putting Information to Work
“On-Line Information”: Your key competitive advantage
• Fine-tune planning
• Streamline settlements
• Budget accurately
• Asses cost of service
• Allocate capacity
• Faster service response
• Remote status & control
• Analyze power quality
• Identify events, SOE
• Receive fault records
• Target maintenance
• Monitor loading trends
Enterprise Operations
SCADA
![Page 109: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/109.jpg)
110
GESA 2000 The competitive solution
Sub-second response for Ethernet connected devices Dual master redundancy with automatic system control transfer Automatic interleaving of events and metering values Ethernet substation UCA 2.0 LAN Peer to peer communications Remote view nodes and web browser compatible HMI Interface Automatic oscillography upload Object oriented system tools for reliable, low cost reconfiguration Real-time system status and control execution
Maximize your Competitive Edge
SCADA
![Page 110: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/110.jpg)
111
Three powerful dimensions to a complete Substation Automation Solution:
• Proven, “off the shelf” components that integrate
today’s IEDs
• Ethernet for data transport in the substation and to
remote sites
• Pre-engineered software, application tools and
device interfaces
GESA 2000
SCADA
![Page 111: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/111.jpg)
112
Built Upon a New Generation Substation Architecture
HTML Wizards
HMI Screens
TrendsOscillographyViewer
EventViewer
FacilityDiagnostics
RemoteMonitor
SystemConfigurator
HT
ML
Gra
phic
s
OPC/ DDE/ CORBA
Interface to Corporate WAN/ LAN
UCA - MMSServer
Redundant Substation Ethernet LAN
Lev
el 1
- IE
Ds
Training/Testing
WEB Server - HMI View Nodes
Monitoring Protection & ControlInteroperability
Redundant Substation Ethernet LAN
Control
Interoperability
Lev
el 2
- In
teg
rati
on
Ho
st
U
ser
Open System Solution -- Relays, Software, Communications, Networking
LegacyServer
SCADAProtocols
PowerAnalysis
Tools
Event Logger
OperationalEfficiency/Reliability
ConfigurationTools
SCADA
![Page 112: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/112.jpg)
113
Smart Screen “Wizards”• One Line Diagrams
• Event Logger
• IED Faceplate
• IED Tabular Values
• Annunciator Panel
• Alarm List with Sorting Feature
• Trending
Integration Productivity and Reliability
GESA 2000
SCADA
![Page 113: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/113.jpg)
114
GESA 2000 Sequence of Event Log
• Time stamped to nearest milli-second• Synchronizable to GPS via IRIG-B• Automatic retrieval from IED to Host• Storage on host disk• Automatically forward to operations PC• Data sort capability included:
– Standard filters•Time•Device Type•Alarm Condition
– Custom filters per
your needs
Monitors and records all system event characteristics
SCADA
![Page 114: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/114.jpg)
115
• Configurable alarm conditions
– Any present value can
drive an alarm
– Set range of operation
• Failure Alarms
– Equipment generated
– System generated
– Grouped per IED
• Remote Communication of Critical Alarms
Alarm Annunciator Panel
SCADA
![Page 115: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/115.jpg)
117
Integrated Solutions to help you succeed
Interoperability
Peer to peer communications
Reliability of software objects and modules
Modularity of hardware modules and
components
Dynamic reconfiguration
Real-time state analysis and operation
SCADA
![Page 116: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/116.jpg)
118
W o r l d w i d e Experience
North AmericaConEdPSE&G
PECO
Salt River
Europe & Africa
ERZ
South America
Electroperu
Inepar
Electronorte
EDENOR
Rio Light
Furnas
Asia Pacific
Aliu Zhou
Zhe Zhang
Guang Xi
SUBSTATION AUTOMATION INSTALATIONS AROUND THE WORLD
SCADA
![Page 117: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/117.jpg)
119
What our Customers Require:That GE is Committed to Deliver
Critical to Quality Metrics
• Access to system application experts -- before, during and after a sale
• Open architecture solutions, built on industry standards - future upgrade path
• Thorough specification of the system to be delivered - fully understood by the user
• Deliver and commission on schedule; within budget - supplier and customer
• Effective operator training - establishing basic user competency
• Return on investment - work together to obtain the expected benefits
C u s t o m e r F o c u s e d
SCADA
![Page 118: 1 GESA GE Substation Automation for the world. 2 Substation Automation > Requirements > Protective relay hardware > Protective relay logic > Relay to.](https://reader035.fdocuments.net/reader035/viewer/2022062321/56649db55503460f94aa66ce/html5/thumbnails/118.jpg)
120SCADA
Ordering On-line