1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The...

37
Fulvio TESSAROTTO CERN, 23/04/2008 - CERN, 23/04/2008 - Contribution from Trieste Contribution from Trieste 1 UPDATE UPDATE ON TRIESTE ON TRIESTE LAB. ACTIVITY LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS First measurements on 4 pieces Chamber for prototype test The set-up to measure signals Fulvio Tessarotto

Transcript of 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The...

Page 1: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 11

UPDATEUPDATE ON TRIESTE ON TRIESTE LAB. ACTIVITYLAB. ACTIVITY

The set-up to measure currents

THGEM prototypes from ELTOS

First measurements on 4 pieces

Chamber for prototype test

The set-up to measure signals

Fulvio Tessarotto

Page 2: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 22

The HV power supplyThe HV power supply

We used for this measurement one channel of the

CAEN N471A power supply, reading the voltage from

the LED display ( +- 1 V ) and the current from the

“current monitor” output (5 mV offset, 1 mV/nA)

We checked the stability of the power supply by looking

at signals on the HV output, using a HV cable, a 1 nF

capacitor and Le Croy oscilloscope

Typical ripple has ~ 30 μs period, 80 mV pp at HV=4kV,

the ripple amplitude being roughly linear with voltage

Page 3: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 33

Ripple on the oscilloscopeRipple on the oscilloscope

Page 4: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 44

HV – Power Supply: Ripples

HV= 2kV

HV= 4kV

Power Supply

HV cable

1nF

LEMOcableSCOPE

Page 5: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 55

HV – Power Supply: Ripples

Receiving a phone call

Page 6: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 66

Home-made Home-made picoamperometerpicoamperometer

Implemented scheme

CMOS Operational Amplifier: AD 8607

10 MΩ feedback resistor: VISHAY CNS020 (+- 0.02%, +- 10 ppm/ºC)

1 nF to 100 nF feedback capacitor

10 M protection resistor

Page 7: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 77

The home-made The home-made picoammeterspicoammeters

Several temporary arrangements were tested for the home-made picoamperometers, using solderless breadboard, micro pcb on ceramic insulators and customly designed pcb’s for home-made picomaperometers

- When powered by batteries they work fine at HV (tested up to 8kV), with stable offsets <10 pA

- Using a battery + resistor current source of ~60 pA we checked that the reading was correct at few pA level; the ultimate resolution is still to be determined

At ground, the agreement between Keithley measurements and home-made picoammeters values is roughly 1pA

Page 8: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 88

CMOS Operational Amplifier: AD 8607

Page 9: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 99

First tests of the set-upFirst tests of the set-up

1) PS – cable1 – PA – cable2

Oscillations with amplitudes proportional to L x V (cable length x PS voltage; no oscillations with PS off).

2) PS – cable1 – PA1 – cable2 – THGEM – cable3 – PA2

Oscillations are the same on PA1 and PA2

Decision: redundancy, shortest possible cables,

design final set-up but start measurements before it is ready

Page 10: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1010

Page 11: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1111

Page 12: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1212

What we observed

Power Supply

Box with ThickGEM – no holes

Page 13: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1313

Page 14: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1414

Reading the voltmetersReading the voltmeters

We decided to register picoammeter redings by saving pictures of the displays

CANON Camera programmed to shoot every 2 seconds: this allows registering measurements and all intermediate operations done by humans

From picture analysis the images on LED displays are translated into numbers (~ 40000 pictures so far)

This solution avoids electrical connections to the acquisition system

Page 15: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1515

Page 16: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1616

THGEM prototype THGEM prototype geometrygeometry

Size of active area: 30mm x 30 mmThickness: 0.4 mmHoles diameter: 0.4 mmPitch: 0.8 mm diametersMaterial: R-1566 Panasonic(halogen free, anti CAF)Cu thickness: 35 μm

Page 17: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1717

Summary tableSummary table

NameDrilling 0.4

mm Rim 1 (μm) Rim 2 (μm) rim production material

M1 Y 0 0 NO Panasonic

M2 Y 25 0 Drilling Panasonic

M3 Y 50 0 Drilling Panasonic

M4 Y 100 0 Drilling Panasonic

M5 Y 50 50 Two Sides Drilling Panasonic

R NO NO NO NO Panasonic

RI NO NO NO NO Isola

C1 Y 10 10 Etching Panasonic

C2 Y 25 25 Etching Panasonic

C3 Y 50 50 Etching Panasonic

C3I Y 50 50 Etching Isola

C4 Y 100 100 Etching Panasonic

C5 Y 10 10 Laser + Etching Panasonic

C6 Y 50 50 Laser + Etching Panasonic

C7 Y 10 10 Global Etching Panasonic

We received 10 samples per type

Page 18: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1818

Documentation example Documentation example C3C3

FASE DI LAVORAZIONE

QUADROTTO ELTOS = 0.38 35/35 320 X 375MATERIALE PANASONIC R-1566 HF

STABILIZZARE INNER 140° 4 ORE

PRIMA FORATURA ( SOLO FORI DI SERVIZIO)AGGIUNGERE LA SCRITTA C3 SUL BORDO

STAMPA ESTERNI INCISIONE INDIRETTAAGGIUNGERE LA SCRITTA C3 SUI CS

SECONDA GALVANICA ( SOLO STAGNO )STRIPPAGGIO RISTON

INCISIONE AMONIACALE RAME 35µ

NON STRIPPARE STAGNO

FORATURA PASSANTE ( DIAMETRO 0.4 )

INCISIONE AMONIACALE RAME 35µINCIDERE USANDO LA VELOCITA ADEGUATA IN MODO DA CREARE UN ISOLAMENTO DI 50µ

INTORNO ALLA CORONA DEL FORO

STRIPPARE STAGNO

SCONTORNATURA

LAVAGGIO CIRCUITI AD ULTRASUONI IN ACQUA DEMINERALIZZATA

IMBALLO E SPEDIZIONE

Page 19: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 1919

TheThe

FR4 FR4

materialmaterial

Page 20: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2020

Page 21: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2121

Page 22: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2222

Page 23: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2323

Page 24: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2424

Page 25: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2525

ProcedureProcedure

THGEM prototypes are kept under vacuum before and after measurement

Handling is done with polyethylene gloves only

Mounting at the centre of the test box, soldering cables and screwing nylon screws on ~5 cm nylon columns: ~ 10 min

HV provided to “TOP” of THGEM prototype, “BOTTOM” at ground (some field above while no field below THGEM)

Flushing with N2 at ~20 l/h for more than 3 hours before switching HV on

Page 26: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2626

Page 27: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2727

Page 28: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2828

Page 29: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 2929

Maximum Maximum voltage in voltage in

NN22 Vmax: highest value of HV

which has been applied for more than 3 min without discharges.

V maxtype rim sample I sample II

50µm (TOP)

M5 50µm (BOTTOM) 2590 V 2400 V

no

M1 -test 1 no 2200 V 2000 V

M1 -test 2 2300 V 2120 V

50µm

C3 50µm 2050 V 1700 V

E1 -test 1 no 2600 V

E1 -test 2 no 2650 V

50µm

M4 0µm 2100 V

0µm

M4 50µm 2270 V

100µm

C4 100µm 3370 V

Preliminary conclusions:

C3 seems to be the worst (50 μm)

C4 seems to be the best (100 μm)

E1 and M5 are very good

M1 and M4 are similar

Reversing M4 rim makes a difference

We provide negative voltage to the “top” of the THGEM

Page 30: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3030

We are building a more compact set-up

Box for 4 THINGS- HV connectors will be on the back side

PCB

OEM44 voltmeter

Connectors for batteriesResistor (10Mohm)Capacitor (10nF)OA - AD8607Guarding “ring”Connectors for OEM44 voltmeter

Page 31: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3131

Test of analog r/o chainTest of analog r/o chain

Single photon signals are generated by a picosecond laser providing ~20 ps long pulses and a correlated timing signalLaser amplitudes are reduced by geometric selection and laser tune down to a probability of 95% no photon pulses. One pixel of a Hamamtsu R7600-03-M16 MAPMT is used to provide signal to our analog r/o chain through a resistive divider (reducing the signal by a factor 4).The ORTEC 142 preamp coupled to the ORTEC 450 amplifier and the CAEN N957 was used to collect amplitude spectra a rough calibration was performed for several gain factors, showing evidence of non linearities for large signals: only signals in the linear range have been used Spectra were taken at various gains and combined in a single plot to increase the dynamic range of the measurement

Page 32: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3232

Single photon amplitude spectra from Single photon amplitude spectra from MAPMTMAPMT

825 V

0

500

1000

1500

2000

2500

0 1 2 3 4 5V out from preamp

cou

nts

850 V

0

500

1000

1500

2000

2500

3000

3500

4000

0 1 2 3 4 5V out preamp

co

un

ts

875 V

0

500

1000

1500

2000

2500

3000

0 1 2 3 4 5V out preamp

cou

nts

900 V

0

500

1000

1500

2000

2500

3000

3500

4000

0 1 2 3 4 5

V out from preamplifier

coun

ts

925 V

0

500

1000

1500

2000

2500

3000

3500

0 1 2 3 4 5V out from preamplifier

co

un

ts

Page 33: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3333

THGEM test THGEM test chamberchamber

Page 34: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3434

Page 35: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3535

Very first spectrum of THGEM Very first spectrum of THGEM signals from Fe source seen signals from Fe source seen

in TSin TS

Page 36: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3636

Page 37: 1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from TriesteCERN, 23/04/2008 - Contribution from Trieste 3737