1. Foundations 5 pg - ikopluseco.eu file22 mm pipe for electrical ... Tyvek Anchor bolt Bottom plate...
Transcript of 1. Foundations 5 pg - ikopluseco.eu file22 mm pipe for electrical ... Tyvek Anchor bolt Bottom plate...
Construction
FOUNDATIONS
Hydro insulation
Utilities
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 01
DETAIL NAME:
22 mm pipe for electrical
Gypsum board/ MGO board
Floor panel
Tyvek
Anchor bolt
Bottom plate (wooden)
Wall panel
Screw nails according calculationbut no more than 150 mm
End panel connector thk 45 mm
45 x195 mm pressured treated wood
D.P.C. membrane
Green Panel SIP screws
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
D.P.C. membrane
Aerated concrete(acoustic insulation)
Floor support material
20 m
m
MGO board
Screw nails according calculation
Stan
dard
hei
ght o
f 350
mm
Up lift element(tie down element)
SIP WALL/ SIP FLOOR
UP LIFT ELEMENT ONLY ON THE CORNER OF THE BUILDING
Panel thk
Sealant
Construction
FOUNDATIONS
Hydro insulation
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 02
DETAIL NAME:
Construction
FOUNDATIONS
Hydro insulation
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 02
DETAIL NAME:
20 m
m
Gypsum board/ MGO board
Anchor bolt
Bottom plate (wooden)
Wall panel
Screw nails according calculationbut no more than 150 mm
End panel connector thk 45 mm
45 x195 mm pressured treated wood
D.P.C. membrane
Green Panel SIP screws
D.P.C. membrane
Aerated concrete(acoustic insulation)
Floor support material
MGO board
Screw nails according calculation
Panel thk
SIP WALL/ SIP FLOOR
Tyvek
Floor panel
Sealant
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
FOUNDATIONS
Hydro insulation
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 03
DETAIL NAME:
Tyvek
SIP WALL/ SIP FLOOR
Floor joist(perpendicular to wall)
22 mm pipe for electrical
Gypsum board/ MGO board
Anchor bolt
Bottom plate (wooden)
Wall panel
Screw nails according calculationbut no more than 150 mm
Blocking connector thk 45 mm
45 x195 mm pressured treated wood
D.P.C. membrane
D.P.C. membrane
Aerated concrete(acoustic insulation)
Floor support material
20 m
m
MGO board
Screw nails according calculation
Stan
dard
hei
ght o
f 350
mm
Up lift element(tie down element)
Panel thk
Sealant
Thermal insulation
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
FOUNDATIONS
Acoustic
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 04
DETAIL NAME:
Two rows attached or per local code
Min. 5 cm bearing
Green PanelSIP screws
SIP DROOP WALL/ SIP FLOOR
Tyvek
Floor joist
22 mm pipe for electrical
Gypsum board/ MGO board
Anchor bolt
Bottom plate (wooden)
Wall panel
45 x195 mm pressured treated wood
D.P.C. membrane
D.P.C. membrane
Aerated concrete(acoustic insulation)
Floor support material
20 m
m
MGO board
Screw nailsaccording calculation
Stan
dard
hei
ght o
f 350
mm
Sealant
Panel thk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 5
DETAIL NAME:
SIP WALL/ SIP FLOOR/ STEEL BEAM
Gypsum board/ MGO board
Floor panel
Tyvek
Bottom plate (wooden)
Wall panel
Screw nails according calculationbut no more than150 mm
End panel connector thk 45 mm
45 x 195 mm pressured treated wood
Green Panel S.I.P. screws
D.P.C. membrane
Floor support material
20 m
m
Screw nails according calculation
Aerated concrete(acoustic insulation)
MGO board
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Panel thk
Sealant
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 6
DETAIL NAME:
20 mm pipe for electricalhorizontal chase centered
Gypsum board/ MGO board
Wall panel
Screw nails according calculation
Screws nails according calculation
Bottom plate (wooden)
End panel connector
Header wrap (if required)
Extension top plate (wooden)
Gypsum board/MGO board
Top plate (wooden)
Floor Joist/ Posi-Joist/ I-Joist (perpendicular to wall)
SIP WALL/ FLOOR/ JOIST PARALLEL
Screws nails according calculationbut not less than 50 mm
D.P.C. membrane
Floor support material
20
mm
Aerated concrete(acoustic insulation)
Panel thk
Sealant
Sealant
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Utilities
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 7
DETAIL NAME:
Sta
ndar
d he
ight
of 3
50 m
m
20 mm pipe for electricalhorizontal chase centered
Gypsum board/ MGO board
Wall panel
Screw nails according calculation
Green Panel approved sealant at locations shown
Screws nails according calculation
Bottom plate (wooden)
End panel connector
Header wrap (if required)
Green Panel approved sealant at locations shown
Extension top plate (wooden)
Top plate (wooden)
Floor Joist/ Posi Joist/ I-Joist (perpendicular to wall)
SIP WALL/ FLOOR/ JOIST PARALLEL
Screws nails according calculationbut not less than 50 mm
D.P.C. membrane
Floor support material20 m
m
Aerated concrete(acoustic insulation)
Gypsum board/ MGO board
Panel thk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 8
DETAIL NAME:
Gypsum board/ MGO board
Green Panel S.I.P. screwaccording calculation
SIP WALL CORNER
End panel connector (wooden)
Green Panel screw nails according calculation
O.S.B. boardAlternative top plate(wooden)
Gypsum board/ MGO board
Panel thk
Green Panel screw nails according calculation
Green Panel S.I.P. screwaccording calculation
Panel t
hk
Bottom plate (wooden)
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 9
DETAIL NAME:
Green Panel S.I.P. systeml
Gypsum board/ MGO board
Structural partition wall
Rockwool insulation
Gypsum board/ MGO board
Green Panel S.I.P. screw
End panel connector O.S.B.
P.I.R. foam
Panel thk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 10
DETAIL NAME:
Green Panel S.I.P. system
75 m
mP.I.R. foam
Galvanized metal plate75 x 0.4 mm
Galvanized metal angle37.5 x 0.4 mm
Green Panel D.I.P. systemnon structural wall
Gypsum board/ MGO board
Gypsum board/ MGO board 3,6,9 mm
Gypsum board/MGO board
(100
mm
)
Panel thk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 11
DETAIL NAME:
Gypsum board/ MGO board
Wall panel
Top plate (wooden)
Screw nails accordingcalculations
Green Panel SIP screw
Roof panel
Galvanized metallicangle 37.5 x 0.4 mm
Panel t
hk
O.S.B.
P.I.R. foam
End panelconnector 45 mm
Screw nails accordingcalculations
Panel thk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 12
DETAIL NAME:
Gypsum board/ MGO board
2 cm
Green Panel approved panel seal tape at roof panels only
Green Panel approved sealant at location shown
Joint wood plate
10-30O
SIP JOINT/ SINGLE LUMBER SPLINE
Screw nails accordingcalculations
Screw nails accordingcalculations
Panel edge sealantat roof panels only
Joint wood plate
Panel t
hk
Panel t
hk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 13
DETAIL NAME:
Gypsum board/ MGO board Green Panel approved sealant at location shown
Spline attached full round headsmooth shank nails both sides
Panel edge sealant atroof panels only
Green Panel galvanized metallic plate
SIP JOINT/ SPLINE
Screw nails accordingcalculations
Screw nails accordingcalculations
SIP joint element2 cm
Panel t
hk
Panel t
hk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 14
DETAIL NAME:
Gypsum board/ MGO boardGreen Panel approved
sealant at location shown
Joint wood plate
Panel edge sealant atroof panels only
Green Panel approved panel seal tape at roof panels only
SIP JOINT/ SINGLE 4 X LUMBER SPLINE
Joint wood plate
SIP panel
Screw nails according calculations
Screw nails according calculations
Panel t
hk
Panel t
hk
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 15
DETAIL NAME:
Top plate (wooden)
2 x lintel plate (wooden)
Green Panel screw nailsaccording calculations
2 x blockingA
A
BB
Pa
ne
l th
k
Panel thk
A A
B B
Green Panel approved sealant at location shown
End panel top plate45mm
SMALL OPENING INSIDE PANEL
Green Panel screw nailsaccording calculations
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 16
DETAIL NAME:
ΚΟΡΥΦΗΣ
SIP WALL/ ROOF/ RAKE
Top plate (wooden)
O.S.B. board
P.I.R. foam
Screw nails accordingcalculations
Bottom plate (wooden)
Screw nails accordingcalculations
Panel thk
Bottom plate (wooden)
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 17
DETAIL NAME:
D.P.C. membrane
Floor support material
20 m
m
P.I.R. foam
O.S.B.
Gypsum board
Screw nails according calculations
S.I.P. system
Aerated concrete(acoustic insulation)
Panel thk
Solid Beam (for support andconnections seeDetail no. 48 - Floors chapter)
Screw nails according calculations
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 18
DETAIL NAME:
Max. 2800
Panel joint wood plate45 x 90 mm
Bottom plate45 x 90 mm
Green Panel S.I.P. system
Screw nails according calculations
O.S.B.
P.I.R. foam
1250
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 19
DETAIL NAME:
Screw nails according calculations
Bottom plate45 x 90 mm
Panel joint wood plate90 x 90 mm
Max. 3500
200
1250
Green Panel S.I.P. system
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 20
DETAIL NAME:
Hangers
Hangers 600 mm
Screw nails according calculations
Green Panel S.I.P. system
4 x 7.5/ 200
DETAIL ABottom plate
45 x 90 mm
Panel joint wood plate
For more th
an 4 m
DETAIL A
2001250
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 21
DETAIL NAME:
45x90
Bottom plate45x90mm
Lintel wood plate2 pieces of 45 x 90 mm
Green Panel S.I.P. system
window oppening
Lintel structure for openings more than 2.80maccording engineering calculations
Green Panel S.I.Psystem
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 22
DETAIL NAME:
Continue lintel wood plate 2 pieces of 38 x 89 mm
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 23
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Fire
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 24
DETAIL NAME:
GROUND FLOOR, ap. 1 GROUND FLOOR, ap. 2
FIRST FLOOR, ap. 1 FIRST FLOOR, ap. 2
LAST FLOOR, ap. 1 LAST FLOOR, ap. 2
D.P.C. membrane
Floor support material
20 m
m
D.P.C. membrane
Floor support material
20m
m
D.P.C. membrane
Floor support material
20 m
m
D.P.C. membrane
Floor support material
20 m
m
D.P.C. membrane
Floor support material
20m
m
D.P.C. membrane
Floor support material
20 m
m
O.S.B
S.I.P. system, roof panel
S.I.P. system, wall panel
S.I.P. system, wall panel
Fire protection Gyproc 50 mm
Fire protection Gyproc 50 mm
Fire protection Gyproc 50 mm
O.S.B
O.S.B
ROCKWOOL
Wood beamRockwool
RockwoolRockwool
S.I.P. system, roof panel
Gypsum board/MGO board
Gypsum board/MGO board
Gypsum board/MGO board
Wood beam
I beam wood + O.S.B.
I beam wood+O.S.B.
S.I.P. system, wall panel
S.I.P. system, wall panel
S.I.P. system, wall panel
Aerated concrete(acoustic insulation)
Aerated concrete(acoustic insulation)
Aerated concrete(acoustic insulation)
Aerated concrete(acoustic insulation)
Aerated concrete(acoustic insulation)
Aerated concrete(acoustic insulation)
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Fire
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 25
DETAIL NAME:
D.P.C. membrane
Floor support material
20 m
m
Aerated concrete(acoustic insulation)
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Fire
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 26
DETAIL NAME:
S.I.P. panel
Beam
Rockwool 30 mm
Rockwool 30 mm
GAP, 12 mm
Beam
O.S.B. 12 mm for insulation support
Sound absorption tape
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 27
DETAIL NAME:
screw nail typesGreen Panel
SCREW NAIL TYPESGREEN PANEL
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 28
DETAIL NAME:
CUTTING LIST
1.4
00.8
0
2.8
0 B1
B2
B3
B4
0.6
01.6
00.6
0
0.6
02.2
0
0.35
0.70 0.80 0.55 0.60 1.25
0.30
1.25 0.80 1.25 1.05 1.25
B5
B6
B7
B8 B9 B10
B11
B12 B13 B14
CUTTING LIST
2.8
0
0.6
0
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 29
DETAIL NAME:
Lintel plate45 x 90 mm
Base plate45 x 90 mm
Lateral plate45x90mm
Lateral plate45 x 90 mm
125 cm
NOTE! If the window opening more then 60 x 60 cm, structural frame is needed.NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 30
DETAIL NAME:
NOTE! If the window opening position has in top of the panel less then 60cm, it needs engineering calculations; for more than 60x60cm, it needs structural frame
Less
than 6
0 c
m
125 cm
Lintel plate45 x 90 mm
Base plate45 x 90 mm
Lateral plate45x90mm
Lateral plate45 x 90 mm
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 31
DETAIL NAME:
125 cm Top plate45 x 90 mm
Bottom plate45 x 90 mm
280 c
m
End panel plate45 x 90 x 2665 VIEW
PLAN
End panel plate45 x 90 x 2665
Joint panel plate90 x 90 x 2665
Joint panel plate90 x 90 x 2665
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Acoustic
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 32
DETAIL NAME:
Extension plateTop plate
Brick
Brick
Rendering
Wood eave board
Fascia board
Roof tileRockwool
Wood slate
TyvekRafter
Purlin
S.I.P. system
Gypsum board/MGO board
Window
LintelTop plate
Lintel
300
22
5200
13 112 50 100 20
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Acoustic
Fire
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 33
DETAIL NAME:
Brick/ concrete
S.I.P. panel
O.S.B.Rockwool
Acoustic slide concrete
TOP VIEW
O.S.B.
Gypsum board/ MGO board
Rockwool
Steam barrier
Plastic profile
S.I.P. system
O.S.B.
O.S.B.
P.I.R. foam
Fire protection,Gyproc 50 mm
Brick/ concrete
Gypsum board/MGO board
O.S.B.
Screw nails accordingcalculations
End panel plate (wooden)
End panel plate (wooden)
Fire protection,Gyproc 50 mm
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Thermal insulation
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 34
DETAIL NAME:
S.I.P. system
O.S.B.
Bottom plate (wooden)
Pressured treated wood
Slide concrete
Anchor bold
P.I.R. foam
O.S.B.
Slide concrete
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Thermal insulation
Fire
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 35
DETAIL NAME:
Gypsum board/MGO board
O.S.B.
P.I.R. foam
Double gypsum board/ MGO board
Tyvek
S.I.P. systemScrew nails accordingcalculations
Fire protection,Gyproc 50 mm
Fire protection,Gyproc 50 mm
Brick/ concrete
Gypsum board/ MGO board
APARTMENT 1
APARTMENT 2
O.S.B.
Tyvek
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Thermal insulation
Fire
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 36
DETAIL NAME:
Fire protection,Gyproc 50 mm
Brick fixing system
Tyvek
Up lift element (wooden)
O.S.B.
Screw nails accordingcalculation
Rockwool
Wood beam
Gypsum board/ MGO board
O.S.B.
Extension plate (wooden)
Top plate (wooden)
P.I.R. foam O.S.B.
Finished brick
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Screw nails accordingcalculation
Construction
Fire
Hydro insulation
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 37
DETAIL NAME:
Gypsum board/ MGO board
Gypsum board/MGO board
Chimney
Hydroinsulation
Fire protection
Roof S.I.P. panel
O.S.B.
P.I.R. foam
O.S.B.
5 cm
5 cm
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Hydro insulation
Fire
Construction
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 38
DETAIL NAME:
S.I.P. system
Fire protection
Fire place concrete structure
Gypsum board/MGO board
S.I.P. system
Chimney
Fire protection
Fire place concrete structure
Fire place concrete structure
Concrete base
SECTION
TOP VIEW Stone mask
End panel connector(wooden)
S.I.P. system, wall panel
Concrete box
Fire protection
FIRE PLACE
Fire place - structure
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
Utilities
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 39
DETAIL NAME:
Utilities pipes
O.S.B.
Wood slate
End panel connector
Screw nails accordingcalculations
End panel connector
O.S.B.
P.I.R. foam
S.I.P. system
S.I.P. system
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
Utilities
Acoustic
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 40
DETAIL NAME:
Concrete slab
Base concrete
Tyvek
Floor tiles
Plinth
O.S.B.
Gypsum board/MGO board
Utilities pipe
P.I.R. foam O.S.B.
Anchor bold
Screw nails accordingcalculations
Finishing material
Base concrete
Top plate (wooden)
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
Utilities
WALLS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 41
DETAIL NAME:
Concrete slab
Base concrete
Tyvek
Floor tiles
Plinth
O.S.B.
Gypsum board/MGO board
Utilities pipe
P.I.R. foam
O.S.B.
Anchor bold
Screw nails accordingcalculations
M.G.O. board
Top plate (wooden)
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 41
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
SIP WALL/ SIP FLOOR/ STEEL BEAM
Gypsum board/ MGO board
Floor panel
Tyvek
Bottom plate (wooden)
Wall panel
Screw nails according calculationbut no more than 150 mm
End panel connector thk 45 mm
45 x 195 mm pressured treated wood
Green Panel S.I.P. screws
D.P.C. membrane
Floor support material
20
mm
Screw nails according calculation
Aerated concrete(acoustic insulation)
MGO board
Panel thk
Acoustic
Construction
Hydro insulation
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 42
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
20 mm pipe for electricalhorizontal chase centered
Gypsum board/ MGO board
Wall panel
Screw nails according calculation
Green Panel approved sealant at locations shown
Screws nails according calculation
Bottom plate (wooden)
End panel connector
Header wrap (if required)
Green Panel approved sealant at locations shown
Extension top plate (wooden)
Gypsum board/MGO board
Top plate (wooden)
Floor Joist/ Posi-Joist/ I-joist (perpendicular to wall)
SIP WALL/ FLOOR/ JOIST PARALLEL
Screws nails according calculationbut not less than 50 mm
D.P.C. membrane
Floor support material2
0 m
m
Aerated concrete(acoustic insulation)
Panel thk
Hydro insulation
Construction
Utilities
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 43
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Wall panel
Screw nails according calculation
Green Panel approved sealant at locations shown
Height extension top plate
End panel connector 45 mm
D.P.C. membrane
Green Panel approved sealant at locations shown
Screw nails according calculation
Top plate (wooden)
Gypsum board/ MGO board
Gypsum board/ MGO board
20 mm pipe for electricalhorizontal chase centered
SIP WALL/FLOOR/ JOIST PARALLEL
Bottom plate (wooden)
Wood andO.S.B. joist
D.P.C. membrane
Floor support material
Aerated concrete(acoustic insulation)
Panel thk
20
mm
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 44
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
D.P.C. membrane
Floor support material
Galvanized metal angle 37.5 x 0.4 mm
100 mm
P.I.R. foam
Gypsum board/MGO board 3,6,9 mm
Floor panel
Tyvek
D.P.C. membrane
Anchor bolt
D.I.P. systemnonstructural wall
S.I.P. wall
45 x 195 mm pressured treated wood
Aerated concrete(acoustic insulation)
S.I.P. wall
Acoustic
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 45
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Acoustic absorption tape
O.S.B. floor support
S.I.P. systemGreen Panel
Top plate2 plies x 45mm x 90 mm
Screw nailsaccording calculations
“I” type beamGreen Panel
Hanger as per calculation
Acoustic
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 46
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Beam
Acoustic absorption tape
O.S.B. floor support
S.I.P. systemGreen Panel
Top plate2 plies x 45mm x 90 mm
Screw nailsaccording calculations
Screw nailsaccording calculations
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 47
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Wood beam Top plate45 x 90 mm
O.S.B.
S.I.P. panel
P.I.R. foam
O.S.B.
Hanger as per calculation
Acoustic
Fire
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 48
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Fire protectionGyproc 50 mm
Concrete
Rockwool 50 mm
O.S.B. 18 mm
S.I.P. systemBeam
Double gypsum board/MGO board
Gypsum board/MGO board
End panel connector
Screw nails accordingcalculations
Gyproc 50 mm
Bottom plate (wooden)
Gypsum board/MGO board
O.S.B.
O.S.B.
Tyvek
P.I.R foam
Plastic profile
Aerated concrete(acoustic insulation)
Acoustic
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 49
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Gypsum board/MGO board
P.I.R. foam
O.S.B.
Brick/ concrete
Bottom plate (wooden)
Screw nails accordingcalculations
Up lift element
Extension plate(wooden)
Top plate (wooden)
O.S.B.
Screw nails accordingcalculations
Rockwool
Wood beam
O.S.B.
Gypsum board/MGO board
Screw nails accordingcalculations
S.I.P. system
Construction
FLOORS
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 50
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Wood beam
Double gypsum board or otherapproved thermal barrier
O.S.B.
P.I.R. foam
Gypsum board/ MGO board
O.S.B.
O.S.B.
Metallic profile
P.I.R. foam
Bottom plate (wooden)
Utilities pipe
End beam connector(wooden)
Screw nails accordingcalculations
Aerated concrete(acoustic insulation)
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 51
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
O.S.B. panelGypsum board/ MGO board
Green Panel screw nailsaccording calculation
Beveled lumber attached, full round head smooth shank nails both sides
10d nails two rows staggered or per local code
SIP WALL ANGLED CORNER
O.S.B. panel
P.I.R. foamS.I.P. roof panel
Green Panel approved sealant at locations shown
Pan
el th
k
Panel thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 52
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Green Panel approved sealant at locations shown
Beveled lumber attached, fullround head smooth shank
nails both sides
Green Panel S.I.P. screw
SIP WALL ANGLED CORNER/ OVERLAY
Green Panel screw nailaccording calculation
Gypsum board/ MGO board
O.S.B. panel
P.I.R. foam
Pan
el th
k
Panel thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 53
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Gypsum board/ MGO board
Roof panel S.I.P. system
Wall panel S.I.P. system
Top plate 45 mm
Green Panel approved galvanized metal angle
Green Panel S.I.P. screw
Green Panel approvedsealant at locations shown
End panel plate
SIP WALL/ ROOF/ SQUARECUT EAVE
Screw nails according tocalculations
P.I.R. foam
O.S.B. panel
Panel thk
Pan
el th
k
Gypsum board/ MGO board
Green Panel screw nailsaccording calculation
P.I.R. foam
O.S.B. panel
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 54
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Gypsum board or otherapproved thermal barrier
Roof panel S.I.P. system
Wall panel S.I.P. system
Screw nail accordingcalculations
SILI top plate
Green Panel screw
Green Panel approvedgalvanized metal angle
Panel thk
SIP WALL/ ROOF/ BLOCKING/ SQUARE CUT EAVE
Gypsum board/MGO board
P.I.R. foam
Screw nails accordingcalculations
End panel plate
Pan
el th
k
P.I.R. foam
O.S.B. panel
O.S.B. panel
Green Panel approvedsealant at locations shown
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 55
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
SIP WALL/ ROOF/ PLUMB CUT EAVE
Gypsum board or otherapproved thermal barrier
Roof panel S.I.P. system
Wall panel S.I.P. system
Screw nail accordingcalculations
SILI top plate
Green Panel screw
Green Panel approvedgalvanized metal angle
Gypsum board/MGO board
P.I.R. foam
Screw nails accordingcalculations
End panel plate
Pan
el th
k
P.I.R. foam
O.S.B. panel
O.S.B. panel Green Panel approvedsealant at locations shown
Panel thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 56
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
SIP WALL/ ROOF/ BLOCKING/ PLUMB CUT EAVE
Panel thk
Gypsum board or otherapproved thermal barrier
Wall panel S.I.P. system
Screw nail accordingcalculations
SILI top plate
Green Panel approvedgalvanized metal angle
Gypsum board/MGO board
P.I.R. foam
Pan
el th
k
O.S.B. panel
Roof panel S.I.P. system
Green Panel screw
Screw nails accordingcalculations
End panel plate
P.I.R. foam
O.S.B. panel
Green Panel approvedsealant at locations shown
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 57
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Height extension top plate (wooden)
Pre-engineered wood trusses
Screw nails according calculations
Top plate (wooden) 45 mm
Green Panel screw nails according calculations
SIP WALL/ PRE-ENGINEERED WOOD TRUSSES
Galvanized metallic platefor joint pieces with nails
Galvanized metallic platefor joint pieces with nails
Gypsum board /MGO board
Wall panel S.I.P. system
Wood beam/ joist
Pan
el th
k
Panel thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 58
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Ridge beam
Gypsum board or otherapproved thermal barrier
Galvanized metallic profile
O.S.B.
Panel edge sealant End panel connector 45 mm
Green Panel S.I.P. screw
Min. 5 cm bearing
SIP ROOF/ RIDGE BEAM/ RIDGE PLATES
Green Panel approvedsealant at locations shown
Panel thk
Pan
el th
k
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 59
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Ridge beam
Gypsum board/MGO board
Panel edge sealantGreen Panel SIP screw
End panel connector
Rafter
SIP ROOF/ RAFTER/ RIDGE PLATES
Galvanizedmetallic profile
Screw nails according calculations
Green Panel approvedsealant at locations shown
Panel thk P
anel
thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 60
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Green Panel screw
Panel edge sealant
Two part polyurethanefoam sealant
Ridge beam
Gypsum board/ MGO board
1 cm min.
O.S.B.
Min. 5 cm bearing
SIP ROOF/ RIDGE BEAM/ TWO PART FOAM
Panel thk
Pan
el th
k
Galvanizedmetallic profile
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 61
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Galvanizedmetallic profile
O.S.B.
Min. 5 cm bearing
Ridge beam
Gypsum board/ MGO board
Panel edge sealantGreen Panel approved sealant
at locations shown
End panel connector45mm
Green Panel S.I.P. screw
SIP ROOF/ RIDGE BEAM/ OVERLAY
Screw nails according calculation
Panel th
kPanel thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 62
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Panel edge sealant
Gypsum board /MGO board
O.S.B.
Green Panel galvanized metallic angle
Valley beam (min. 5c m bearing each panel)
Engineered lumber valley plates attachedfull round head smooth shank nails top side
SIP ROOF/ VALLEY BEAM PLATES
Screw nails according calculations
Green Panel S.I.P. screw
Green Panel approvedsealant at locations shown
Panel thkP
anel
thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 63
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Gypsum Board/ MGO board
O.S.B.
Green Panel galvanized metallic angle
Valley beam (min. 5 cm bearing each panel)
Green Panel S.I.P. screw
Panel edge sealant
Green Panel approved two part polyurethane foam sealant
SIP ROOF/ VALLEY BEAM/ TWO PART FOAM
Pan
el th
kP
anel thk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 64
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Green Panel S.I.P. screws
Panel edge sealant
O.S.B. surface spline attachedfull round head smooth shank nails top side
Green Panel approved two part polyurethane foam sealant
Gypsum board/ MGO board
Beam
O.S.B.Green Panel approved panel seal tape at roof panels only
SIP JOINT/ BEAM/ OSB SURFACE SPLINE
Screw nails according calculation
Panel t
hk
Panel t
hk
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 65
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Panel edge sealantat roof panels only
Spline attached full round head smoothshank nails top side
SIP JOINT/ BEAM/ INSULSPLINE
Panel t
hk
Panel t
hk
Green Panel approved two part polyurethane foam sealant
Gypsum board/ MGO board
BeamO.S.B.
Screw nails according calculation
Green Panel S.I.P. screws
ROOF
Construction
INTEGRATED CONSTRUCTION SYSTEM
SCALE:
LAST UPDATE: DETAIL 66
DETAIL NAME:
NOTES:
1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.
Green Panel S.I.P. screws
Gypsum board/MGO boardBeam
O.S.B.
SIP PANEL/ INTERMEDIATE BEAM
Panel t
hk
Panel t
hk
INTEGRATED CONSTRUCTION SYSTEM
The Grand Complex, 7th Floor Office 7.1490 Calea 13 Septembrie 5th district
Bucharest, Romania, 050726Tel.: +40 (21) 311.24.78 Fax: +40 (21) 311.24.82
[email protected] www.green-panel.eu