1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet...

49
1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project Manager Michael S. Collins, Stan Kluz, Joseph Burrescia, and James V. Gagliardi, ESnet Leads and the ESnet Team Lawrence Berkeley National Laboratory

Transcript of 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet...

Page 1: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

1

ESnetTrends and Pressures

andLong Term Strategy

ESCC, July 21, 2004

William E. Johnston, ESnet Dept. Head and Senior Scientist

R. P. Singh, Project Manager

Michael S. Collins, Stan Kluz,Joseph Burrescia, and James V. Gagliardi, ESnet Leads

and the ESnet Team

Lawrence Berkeley National Laboratory

Page 2: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

2

DOE Science Bandwidth Requirements

• Bandwidth requirements are established by the scientific community by looking ato the increase in the rates at which supercomputers

generate data

o the geographic scope of the community that must analyze that data

o the types of distributed applications must run on geographically diverse systems

- e.g. whole system climate models

o the data rates, and analysis and collaboration style of the next generation science instruments

- e.g. SNS, Fusion, LHC/Atlas/CMS

Page 3: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

3

Evolving Quantitative Science Requirements for Networks

Science Areas Today End2End Throughput

5 years End2End Throughput

5-10 Years End2End Throughput

Remarks

High Energy Physics

0.5 Gb/s 100 Gb/s 1000 Gb/s high bulk throughput

Climate (Data & Computation)

0.5 Gb/s 160-200 Gb/s N x 1000 Gb/s high bulk throughput

SNS NanoScience Not yet started 1 Gb/s 1000 Gb/s + QoS for control channel

remote control and time critical throughput

Fusion Energy 0.066 Gb/s(500 MB/s burst)

0.198 Gb/s(500MB/20 sec. burst)

N x 1000 Gb/s time critical throughput

Astrophysics 0.013 Gb/s(1 TBy/week)

N*N multicast 1000 Gb/s computational steering and collaborations

Genomics Data & Computation

0.091 Gb/s(1 TBy/day)

100s of users 1000 Gb/s + QoS for control channel

high throughput and steering

Page 4: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

4

Evolving Qualitative Requirements for Network Infrastructure

In the near term applicationsneed high bandwidth

2-4 yrs requirement is for high bandwidth and QoS.

3-5 yrs requirement is for high bandwidth and QoS and network resident cache and compute elements.

4-7 yrs requirement is for high bandwidth and QoS and network resident cache and compute elements, and robust bandwidth (multiple paths)

C

S

C

C

S

I

C

S

C

C

S

I

C

S

C

C

S

IC&C

C&C

C&

C

C&

C

C&C

C&

C

C

S

C

C

S

IC&C

C&C

C&

C

C&

C

C&C

C&

CS

C

I

C&C

instrument

compute

storage

cache &compute

1-40 Gb/s,end-to-end

1-3

yrs

2-4

yrs

3-5

yrs

4-7

yrs

guaranteedbandwidthpaths

100-200 Gb/s,end-to-end

Page 5: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

5

Point to Point Connections

• 10 Gb/s connections between major data site provides the ability to move about 100 TBy/day – a petabyte every 10 days

• A few 10 Gb/s connections between ½ dozen Labs will be probably be feasible in the next few years

Page 6: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

6

ESnet’s Evolution over the Next 10-20 Years

• Upgrading ESnet to accommodate the anticipated increase from the current 100%/yr traffic growth to 300%/yr over the next 5-10 years is priority number 7 out of 20 in DOE’s “Facilities for the Future of Science – A Twenty Year Outlook”

Page 7: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

7

ESnet’s Evolution over the Next 10-20 Years

• Based on the requirements of the OSC High Impact Science Workshop and Network 2008 Roadmap, ESnet must address

I. Capable, scalable, and reliable production IP networking- University and international collaborator connectivity

- Scalable, reliable, and high bandwidth site connectivity

II. Network support of high-impact science- provisioned circuits with guaranteed quality of service

(e.g. dedicated bandwidth)

III. Evolution to optical switched networks- Partnership with UltraScienceNet

- Close collaboration with the network R&D community

IV. Science Services to support Grids, collaboratories, etc

Page 8: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

8

I. Production IP: University and International Connectivity

Connectivity between any DOE Lab and any Major University should be as good as ESnet connectivity between DOE Labs and Abilene connectivity between Universities

o Partnership with Internet2/Abilene

o Multiple high-speed peering points

o Routing tailored to take advantage of this

o Continuous monitoring infrastructure to verify correct routing

o Status: In progress- 4 cross-connects are in place and carrying traffic

- first phase monitoring infrastructure is in place

Page 9: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

9

ESnet/QwestAbileneORNL

DENDEN

ELPELP

ALBALB

DCDC

DOE Labs w/ monitorsUniversities w/ monitorsnetwork hubshigh-speed cross connects with Internet2/Abilene

Monitoring DOE Lab - University Connectivity• Normal, continuous monitoring (full mesh – need auto detection of bandwidth anomalies)

• All network hubs will have monitors• Monitors = network test servers (e.g. OWAMP) + stratum 1 time source

Japan

Japan

CERN/Europe Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

HOUHOU

KCKC

LALA

ATLATL

INDINDSNVSNV

Page 10: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

10

ESnet/QwestAbileneORNL

DENDEN

ELPELP

ALBALB

DCDC

DOE Labs w/ monitorsUniversities w/ monitorsnetwork hubshigh-speed cross connects with Internet2/Abilene

Monitoring DOE Lab - University Connectivity• Diagnostic monitoring (e.g. follow path from SLAC to IU)

Japan

Japan

CERN/Europe Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

HOUHOU

KCKC

LALA

ATLATL

INDINDSNVSNV

Page 11: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

11

ESnet/QwestAbileneORNL

DENDEN

ELPELP

ALBALB

DCDC

DOE Labs w/ monitorsUniversities w/ monitorsnetwork hubshigh-speed cross connects with Internet2/Abilene

Monitoring DOE Lab - University Connectivity• Initial set of site monitors

Japan

Japan

CERN/Europe Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

HOUHOU

KCKC

LALA

ATLATL

INDINDSNVSNV

Prototype site monitors

Page 12: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

12

Initial Monitor Results (http://measurement.es.net)

Page 13: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

13

Initial Monitoring Prototype LBNL/ESnet -> NCSU/Abilene

1 128.109.41.1 (128.109.41.1) 0.188 ms 0.124 ms 0.116 ms NCSU sentinel host

2 rlgh1-gw-to-nc-itec.ncren.net (128.109.66.1) 1.665 ms 1.579 ms 1.572ms

3 abilene-wash.ncni.net (198.86.17.66) 9.829 ms 8.849 ms 13.470 ms Abilene-regional peering

4 nycmng-washng.abilene.ucaid.edu (198.32.8.84) 13.096 ms 27.682 ms13.084 ms Abilene DC

5 aoa-abilene.es.net (198.124.216.117) 13.151 ms 13.154 ms 13.173 ms Abilene NYC

6 aoacr1-ge0-aoapr1.es.net (134.55.209.109) 13.269 ms 13.157 ms 13.166ms Abilene -> ESnet 1 GE

7 chicr1-oc192-aoacr1.es.net (134.55.209.57) 33.516 ms 33.589 ms 33.579ms ESnet CHI

8 snvcr1-oc192-chicr1.es.net (134.55.209.53) 81.528 ms 81.514 ms 81.499ms ESnet SNV

9 lbl-snv-oc48.es.net (134.55.209.6) 82.867 ms 82.853 ms 82.959 ms ESnet-LBL peering

10 lbnl-ge-lbl2.es.net (198.129.224.1) 85.412 ms 83.736 ms 84.405 ms LBNL

11 ir1000gw.lbl.gov (131.243.128.210) 83.243 ms 82.960 ms 82.906 ms

12 beetle.lbl.gov (131.243.2.45) 83.138 ms 83.075 ms 83.045 ms LBNL sentinel host

42 ms

41 ms

48 hour sample

Thanks! to Chintan Desai, NCSU, Jin Guojun, LBNL, Joe Metzger, ESnet, Eric Boyd Internet2

Page 14: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

14

ESnet/QwestAbileneORNL

DENDEN

ELPELP

ALBALB

DCDC

DOE Labsnetwork hubshigh-speed cross connects with Internet2/Abilene

I. Production IP: University and International Connectivity

Japan

Japan

CERN/Europe Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

HOUHOU

KCKC

LALA

ATLATL

INDIND

ESnet/Qwest

Starlight/NW

CERN

AsiaPac

10Gb/sESnet core

10Gb/s

10Gb/s

2.5Gb/s 10Gb/sESnet core

ESnet/

Qw

est

MAN LAN

JAPAN

Europe

10Gb/s

2.5Gb/s10Gb/s

10Gb/sAbilene core

SNVSNV

Page 15: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

15

I. Production IP: University and International Connectivity

• 10 Gb/s ring in NYC to MANLAN foro 10 Gb/s ESnet – Abilene x-connect

o international links

• 10 Gb/s ring to StarLight for CERN link, etc.o 10 GE switch for ESnet aggration at Starlight in the

procurement process

o 10 GE interface in ESnet Chi router in the procurement process

o will try and get use of second set of fibers from ESnet Chi router to Starlight so that we

• Status: Both of these are in progress

Page 16: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

16

I. Production IP: A New ESnet Architecture

Local rings, architected like the core, will provide multiple paths for high reliability and scalable bandwidth from the ESnet core to the sites

o No single points of failure

o Fiber / lambda ring based Metropolitan Area Networks can be built in several important areas- SF Bay Area

- Chicago

- Long Island

- maybe VA

- maybe NM

Page 17: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

17

MAN Rings

• The ESnet Metropolitan Area Networks (MANs) rings are a critical first step in addressing both increased bandwidth and reliability

• The MAN architecture approach is to replace the current hub and tail circuit arrangement with local fiber rings that provideo diverse paths to the Labs

o multiple high-speed configurable circuits

Page 18: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

18

site gateway routercircuits to

site equip.site gateway router

Qwest hubs

Vendor neutralfacility

ESnet core

network

ANLFNAL

ESnet MAN ArchitectureDOE funded CERN link

monitor

ESnet management and

monitoring

monitor

circuits tosite equip.

ESnet production IP service

ESnet managedcircuit services

T320

StarLight

other international

peerings

Site LAN Site LAN

circuit services

ESnet production IP service

ESnet managedcircuit services

local fiber ring

Chicago hub

Core ring – MAN intersection

circuits to site equip.

production IP

spare capacity

Page 19: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

19

Site gateway routersite equip. Site gateway router

Qwest hub

Vendor neutraltelecom facility

ESnet core

ANLFNAL

New ESnet Architecture – Chicago MAN as ExampleCERN

(DOE funded link)

monitor monitor

site equip.

ESnet production IP service

T320

StarLight

other high-speed

international peerings

Site LAN Site LAN

all interconnects from the sites

back to the core ring are high

bandwidth and have full module

redundancy

No single point failure can

disrupt

Current approach of

point-to-point tail circuits from hub

to site

Page 20: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

20

The Case for ESnet MANs – Addressing the Requirements

• All paths are based on 10 Gb/s Ethernet interfaces that are about ½ the cost of the 10 Gb/s OC192 interfaces of the core networko This addresses the next increment in site access

bandwidth (from 622 Mb/s and 2.5 Gb/s today to 10 Gb/s in the MANs)

• Logically the MAN ring intersects the core ring twice (though at one physical location)o This means that no single component or fiber failure can

disrupt communication between any two points in the network

- Today we have many single points of failure

Page 21: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

21

SF BA MAN – Engineering Study ConfigurationOAK Level3 POP (Emeryville)

1380 Kifer(Level3 Comm. hub)

LBNL

JGI

PAIX(Palo Alto peering point)

SLAC

NERSC

ESnet T320core router

10GE

1400 Kifer(Qwest Comm., ESnet hub)

Optoelectronics

10G Ethernet switch

the logical ring

existing CENIC fiber pathsStanford

Berkeley

Walnut Creek

Oakland

Sunnyvale

ESnetcore network

NationalLambda

Rail

Phase 2 adds LLNL and SNLL

Page 22: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

22

Site gateway router

one optical fiber pairDWDM

site equip. Site gateway router site equip.

ESnet Qwest hub

Starlight

ESnet core

ANL

Shared w/ FNAL

Shared w/ IWire

ESnet

Chicago MAN – Engineering Study Configuration

FNAL

CERN

T320

optoelectronics

Ethernetswitch

Page 23: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

23

I. Production IP: A New ESnet Architecture

• Status: In progresso Migrate site local loops to ring structured Metropolitan

Area Networks and regional nets in some areas

o Preliminary engineering study completed forSan Francisco Bay Area and Chicago area

Have received funding to build the San Francisco Bay Area ring

Page 24: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

24

I. Production IP: Long-Term ESnet Connectivity Goal

• The case for dual core ringso For high reliability ESnet should not depend on a single

core/backbone because of the possibility of hub failure

o ESnet needs high-speed connectivity to places where the current core does not provide access

o A second core/backbone would provide both redundancy for highly reliable production service and extra bandwidth for high-impact science applications

- The IP production traffic would normally use the primary core/backbone (e.g. the current Qwest ring)

Page 25: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

25

ESnet/QwestNLRORNL

DENDENSNVSNV

ELPELP

ALBALBATLATL

DCDC

MANs

High-speed cross connects with Internet2/Abilene

Major DOE Office of Science Sites

I. Production IP: Long-Term ESnet Connectivity Goal• Connecting MANs with two cores to ensure against hub failure (for example, NLR is shown as the second core – in blue – below)

Japan

Japan

CERN/Europe

Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

Page 26: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

26

The Need for Multiple Backbones

• The backbones connect to the MANs via “hubs” – the router locations on the backbone ring

• These hubs present several possibilities for failure that would isolate the MAN rings from the backbone, thus breaking connectivity with the rest of ESnet for significant lengths of time

• The two most likely failures are thato the ESnet hub router could suffer a failure that take it completely out of

service (e.g. a backplane failure) – this could result in several days of isolation of all of the sites connected to that hub

o The hub site could be disabled by fire, physical attack, physical damage from an earthquake or tornado, etc. – this could result in several weeks or more of isolation of all of the sites connected to that hub

• A second backbone would connect to the MAN ring at a different location from the first backbone, thus mitigating the impact of a backbone hub failure

Page 27: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

27

ESnet MAN Architecture with Single Core Ring

MetropolitanArea

Networkring

corering

site

site

site

production IPprovisioned circuits carriedover lambdasOptical channel (λ)

management equipment

one optical fiber pairDWDM

Layer 2 management

equipment (e.g. 10 GigEthernet

switch)

Layer 3 (IP)management

equipment (router)

provisioned circuits carriedas tunnels through the ESnetIP backbone

one POS flow between ESnet

routers

hub site

hub router

Page 28: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

ESnet MAN Architecture withOptimally Connected Dual Core Rings

MetropolitanArea

Networkring

corering #1

site

site

production IPprovisioned circuits carriedover lambdas

site

provisioned circuits carriedas tunnels through the ESnetIP backbone

hub site #1

hub router

hub site #2

corering #2

Page 29: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

29

I. Production IP: Long-Term ESnet Connectivity Goal

• What we want

Qwest hubLevel3 hub

ESnet coreNLR core

SF BAMAN

• What we will probably get

Qwest hubLevel3 hub

ESnet core

NLR core

SF BAMAN

SF BAMAN

A or B

Page 30: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

30

I. Production IP: Long-Term ESnet Connectivity Goal

• Using NLR as a second backbone improves the reliability situation with respect to sites connected to the two proposed MANs, but is not a complete solution because instead of each core ring independently connecting to the MAN ring, the two core hubs are connected together, and the MAN is really intersected by only one ring (see below) – true for both SF Bay and Chicago MANs

• For full redundancy, need to keep some current circuits in place to connect both cores to the MAN ring, as below

Qwest hubLevel3 hub

ESnet coreNLR core

North Bay site(NERSC, JGI, LBNL)

SF BAMAN

Existing Qwest circuitSF Bay Area example

Page 31: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

31

Tactics

• The planned Southern core route upgrade from OC48 (2.5Gb/s) to OC192 (10Gb/s) will cost nearly $3Mo This is the equipment cost for ESnet

o This has nothing to do with the So. Core route per se – that remains absolutely essential to ESnet

o Qwest optical ring (“Qwave service”) - what I refer to as the No. core route and the So. core route - is the basis of ESnet high-speed, production IP service. And this ring, or something like it, will continue to be at the heart of ESnet's production service.

Page 32: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

32

Tactics

• What benefit will this upgrade have for ESnet science users?

• The answer - now that ORNL will be peering with ESnet at 10 Gb/s in Chicago – is that this upgrade will have zero positive impact on OSC science users. o With ORNL connecting at Atlanta, there was a strong case for

OC192 on the So. core route. However, their strategy has changed, and they are now connecting to the No. core route.

o Therefore, while originally the upgrade made sense, it no longer does. 2.5Gb/s on So. route is adequate for foreseeable future.

o All that is happening here is that the networking situation with the OSC Labs has changed fairly significantly over the last several years, and we are just adapting our planning to accommodate those changes.

Page 33: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

33

Northern core route

Southerncore route

Page 34: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

34

Tactics

• ESnet will postpone the southern route upgrade1) Pursue getting a lambda on NLR from Chicago to Seattle

to Sunnyvale to San Diego

o This will have considerable positive impact on our science users. It will give us

- a) a high-speed link from SNV to Seattle and San Diego (we currently have a ridiculous OC3)

- b) the potential to provide alternate backbone service to the MANs

- c) the ability to get PNNL on the ESnet core at high speed

- d) another resource on which we can provision end-to-end circuits for high impact science

2) Collaborate with NYSERNet to build a MAN around Long Island, which will give us the means to get BNL on the ESnet core network at high-speed.

Page 35: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

35

Tactics

• If it turns out that the NNSA labs in the SW need more bandwidth to the ESnet core in the future, we can always upgrade the So. core route piecemeal, starting with the El Paso to Sunnyvale link.

Page 36: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

• When ESnet has not been able to afford to increase the site bandwidth, the Labs have sometimes gotten their own high-speed connections

• ESnet can take advantage of this to provide reliable, production high-speed access to the Labs

When possible, incorporate the existing non-ESnet connections into the new ESnet architecture to provide a better and more capable service than the Labs can provide on their own

• ANL, SLAC, LANL, PNNL, FNAL, ORNL

• BNL, JLab

TacticsLeverage and Amplify

Non-ESnet Network Connectivity to Labs

Page 37: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

ESnet/QwestNLRORNL

DENDENSNVSNV

ELPELP

ALBALB ATLATL

DCDC

MANs

High-speed cross connects with Internet2/Abilene

Major DOE Office of Science Sites

Tactics ORNL Connection to ESnet

Japan

Japan

CERN/Europe

Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

The ORNL contributed circuit

+ the existing ESnet circuit

effectively incorporate ORNL into a secondary ESnet core ring

Page 38: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

38

Outline

• Trends, Opportunities, and Pressures

• ESnet is Driven by the Needs of DOE Science

• New Strategic Directions for ESneto I. Capable, scalable, and reliable production IP

networking

o II. Network support of high-impact science

o III. Evolution to optical switched networks

o IV. Science Services to support Grids, collaboratories, etc

• Draft Outline Strategy, 2005-2010

Page 39: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

39

II. Network Support of High-Impact Science

Dynamic provisioning of private “circuits” in the MAN and through the core can provide “high impact science” connections with Quality of Service guarantees o A few high and guaranteed bandwidth circuits and many

lower bandwidth circuits (e.g. for video, remote instrument operation, etc.)

o The circuits are secure and end-to-end, so if

- the sites trust each other, and

- they have compatible security policies

then they should be able to establish direct connections by going around site firewalls to connect specific systems – e.g. HPSS <-> HPSS

Page 40: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

40

II. Hi-Impact Science Bandwidth

New York (AOA)

Atlanta (ATL)

Washington

El Paso (ELP)

Site gateway router

SiteLAN

DMZ

Site

MANoptical fiber ring

ESnet border

circuit cross

connect

ESnetcore

Site gateway

routerSiteLANDMZ

Site

MANoptical fiber ring

ESnet border

circuit cross

connect

Private “circuit” from one system to another

Specific host, instrument,

etc.

Specific host, instrument,

etc.

common security policy

Production IP network

Page 41: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

41

II. Network Support of High-Impact Science

• Status: Initial progresso Proposal funded by MICS Network R&D program for initial

development of basic circuit provisioning infrastructure in ESnet core network (site to site)

o Will work with UltraScience Net to import advanced services technology

Page 42: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

ESnet On-Demand Secure Circuits and Advance Reservation System (OSCARS)

• The procedure of a typical path setup will be as follows

• A user submits a request to the ESnet Reservation Manager (RM) (using an optional web front-end) to schedule an end-to-end path (e.g. between an experiment and computing cluster) specifying start and end times, bandwidth requirements, and specific source IP address and port that will be used to provide application access to the path.

• At the requested start time, the RM will configure the ESnet router (at the start end of the path) to create a Label Switched Path (LSP) with the specified bandwidth.

• Each router along the route receives the path setup request (via RSVP) and commits bandwidth (if available) creating an end-to-end LSP. The RM will be notified by RSVP if the end-to-end path cannot be established. The RM will then pass on this information to the user.

• Packets from the source (e.g. experiment) will be routed through the LAN’s production path to ESnet’s edge router. On entering the edge router, these packets are identified and filtered using flow specification parameters (e.g. source/destination IP address/port numbers) and policed at the specified bandwidth. The packets are then injected into the LSP and switched (using MPLS) through the network to its destination (e.g. computing cluster).

Page 43: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

43

ESnet On-Demand Secure Circuits and Advance Reservation System

Page 44: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

44

ESnet On-Demand Secure Circuits and Advance Reservation System

• Issueso Scalability in numbers of paths may require shapers as

part of the architecture

o Allocation management (!)

o In a single lambda MAN, may have to put a router at the site (previous thinking was no router at the sites as a cost savings – just Ethernet switches) – otherwise you cannot carry the circuit all the way to the site

Page 45: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

45

III. Evolution to Optical Switched Networks

• Optical transparencyo On-demand, rapid setup of “transparent” optical paths

o G.709 standard optical interfaces – evolution of SONET for optical networks

Page 46: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

46

III. Evolution to Optical Switched Networks

Partnership with DOE’s network R&D programo ESnet will cross-connect with UltraNet / National Lambda

Rail in Chicago and Sunnyvale, CA

o ESnet can experiment with UltraScience Net virtual circuits tunneled through the ESnet core (up to 5 Gb/s between UltraNet and appropriately connected Labs)

o One important element of importing DOE R&D into ESnet

o Status: In progress- Chicago ESnet – NLR/UltraNet x-connect based on the IWire

ring is engineered

- Qwest – ESnet Sunnyvale hub x-connect is dependent on Qwest permission, which is being negotiated (almost complete)

Page 47: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

47

III. Evolution to Optical Switched Networks

• ESnet is building partnerships with the Federal and academic R&D networks in addition to DOE network R&D programs and UltraScienceNeto Internet2 Hybrid Optical Packet Internet (HOPI) and

National Lambda Rail for R&D on the next generation hybrid IP packet – circuit switched networks

- ESnet will participating in the Internet2 HOPI design team (where UltraScience Net also participates)

o ESnet co-organized a Federal networking workshop on the future issues for interoperability of Optical Switched Networks

o Lots of good material at JET Web site

• These partnerships will provide ESnet with direct access to, and participation in, next generation technology for evaluation and early deployment in ESnet

Page 48: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

III. Evolution to Optical Switched NetworksUltraNet – ESnet Interconnects

ESnet/QwestNLRORNL

DENDENSNVSNV

ELPELP

ALBALBATLATL

DCDC

High-speed cross connects with Internet2/Abilene

Major DOE Office of Science Sites

Japan

Japan

CERN/Europe

Europe

SDGSDG

Japan

CHICHI

AsiaPacSEASEA

NYCNYC

MANs

ESnet – UltraScienceNet cross connects

UltraNet

Page 49: 1 ESnet Trends and Pressures and Long Term Strategy ESCC, July 21, 2004 William E. Johnston, ESnet Dept. Head and Senior Scientist R. P. Singh, Project.

49

Conclusions• ESnet is working hard to meet the current and future

networking need of DOE mission science in several ways:o Evolving a new high speed, high reliability, leveraged

architecture

o Championing several new initiatives that will keep ESnet’s contributions relevant to the needs of our community