1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

Transcript of 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning...

Page 1: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

1

Entergy Transmission

Proposed Transmission Reliability Projects

Entergy Transmission Planning Summit

New Orleans, LA

July 10, 2003

Page 2: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

2

Topics

• 2004 - 2008 Transmission Reliability Projects• 2009 - 2013 Transmission Reliability Target Areas• 2004 Transmission Infrastructure Projects (Asset

Preservation)

Page 3: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

3

Caveats onProposed Transmission Reliability Projects

• Cost estimates provided, in most circumstances, are planning-level estimates. In addition, these costs do not include overhead and tax gross-up, which could be as high as 70% of the costs cited.

• Siting of new generation and load growth could affect the timing and necessity of the proposed projects.

• Most of the proposed projects, which are subject to Jurisdictional review and approval, have not yet been budgeted. External considerations (i.e., out-of-cycle projects or budget adjustments during the year) could impact the proposed in-service dates.

Page 4: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

4

Transmission Area Planners

A. ArkansasStacy Hamilton (504) 310-5451

B. MississippiMark Haydel (504) 310-5856

C. SE LouisianaBarry Canzoneri (504) 310-5813

D. SW LouisianaTerrence Griffin (504) 310-5817

E. TexasClay Adams (504) 310-5814

F. N. LouisianaDarrel Hotard (504) 310-5852

Manager: Doug Powell (504) 310-5810

BeaumontBaton Rouge

Jackson

Little Rock

New Orleans

W. MonroeFFFF

Note: Geographic boundaries are approximate.

Page 5: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

5

Transmission Project Development

Ozark

Northeast

Little Rock

Southeast

Hot Springs

Pine Bluff

West Central

East Central

Lake Charles

Baton Rouge

Northshore

Bayou

Gulf

Western

Northern

North Central

Central

Southern

El Dorado

Metro

A. ArkansasJerry Reed 501-490-4703

B. N. Louisiana & Mississippi Rick Bewley 601-368-2005

C. Texas Chuck Hughes 409-347-5118

C. Texas Ronnie Trevino 409-347-5117

D. Lake Charles / N. Louisiana Ed Brawner 337-593-7333

E. Southeast Louisiana Russell Saliba 504-310-5874

Manager:Tom Lanigan 504-310-5866

Note: Geographic boundaries are approximate.

Page 6: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

6

Transmission Services

A. Arkansas, N. MississippiMike Doyle (501) 490-5643

B. N. Louisiana, S. Mississippi,S. LouisianaGerald Gibson (504) 310-5867

C. TexasCarl Olson (936) 525-2040

D. SW LouisianaIPPs & Cogens Carl OlsonLaGen Coops Gerald Gibson

Interconnection Coordinator:Dennis Broussard (504) 310-5878

Sr. Wholesale Exec.:James Howard (504) 310-5881

Analyst: Kim Mitchell (504) 310-5879

Manager: Ollie Burke (504) 310-5864

BeaumontBaton Rouge

Jackson

Little Rock

New Orleans

W. Monroe

Note: Geographic boundaries are approximate.

Page 7: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

7

OASIS-Posted Information

http://oasis.e-terrasolutions.com/OASIS/EES

Planning models

Generation interconnection studies status

http://oasis.e-terrasolutions.com/documents/EES/trans_planning_summit_2003.htm Presentations from today’s meeting

Page 8: 1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

8

Load Growth Projections

Record System Peak: 22,052MW1

EAI 5,533MWwith AECC 6,865

EGSI 7,042MWELI 5,124MWEMI 3,130MWENOI 1,223MW

[1] This demand level is the all-time peak demand on the Entergy system less AECC, which occurred on 8-30-00. With AECC, the peak was 23,384MW.

Beaumont

Conroe New Orleans

Baton Rouge

Jackson

W. Monroe

Little Rock

Hot Springs