1
Entergy Transmission
Proposed Transmission Reliability Projects
Entergy Transmission Planning Summit
New Orleans, LA
July 10, 2003
2
Topics
• 2004 - 2008 Transmission Reliability Projects• 2009 - 2013 Transmission Reliability Target Areas• 2004 Transmission Infrastructure Projects (Asset
Preservation)
3
Caveats onProposed Transmission Reliability Projects
• Cost estimates provided, in most circumstances, are planning-level estimates. In addition, these costs do not include overhead and tax gross-up, which could be as high as 70% of the costs cited.
• Siting of new generation and load growth could affect the timing and necessity of the proposed projects.
• Most of the proposed projects, which are subject to Jurisdictional review and approval, have not yet been budgeted. External considerations (i.e., out-of-cycle projects or budget adjustments during the year) could impact the proposed in-service dates.
4
Transmission Area Planners
A. ArkansasStacy Hamilton (504) 310-5451
B. MississippiMark Haydel (504) 310-5856
C. SE LouisianaBarry Canzoneri (504) 310-5813
D. SW LouisianaTerrence Griffin (504) 310-5817
E. TexasClay Adams (504) 310-5814
F. N. LouisianaDarrel Hotard (504) 310-5852
Manager: Doug Powell (504) 310-5810
BeaumontBaton Rouge
Jackson
Little Rock
New Orleans
W. MonroeFFFF
Note: Geographic boundaries are approximate.
5
Transmission Project Development
Ozark
Northeast
Little Rock
Southeast
Hot Springs
Pine Bluff
West Central
East Central
Lake Charles
Baton Rouge
Northshore
Bayou
Gulf
Western
Northern
North Central
Central
Southern
El Dorado
Metro
A. ArkansasJerry Reed 501-490-4703
B. N. Louisiana & Mississippi Rick Bewley 601-368-2005
C. Texas Chuck Hughes 409-347-5118
C. Texas Ronnie Trevino 409-347-5117
D. Lake Charles / N. Louisiana Ed Brawner 337-593-7333
E. Southeast Louisiana Russell Saliba 504-310-5874
Manager:Tom Lanigan 504-310-5866
Note: Geographic boundaries are approximate.
6
Transmission Services
A. Arkansas, N. MississippiMike Doyle (501) 490-5643
B. N. Louisiana, S. Mississippi,S. LouisianaGerald Gibson (504) 310-5867
C. TexasCarl Olson (936) 525-2040
D. SW LouisianaIPPs & Cogens Carl OlsonLaGen Coops Gerald Gibson
Interconnection Coordinator:Dennis Broussard (504) 310-5878
Sr. Wholesale Exec.:James Howard (504) 310-5881
Analyst: Kim Mitchell (504) 310-5879
Manager: Ollie Burke (504) 310-5864
BeaumontBaton Rouge
Jackson
Little Rock
New Orleans
W. Monroe
Note: Geographic boundaries are approximate.
7
OASIS-Posted Information
http://oasis.e-terrasolutions.com/OASIS/EES
Planning models
Generation interconnection studies status
http://oasis.e-terrasolutions.com/documents/EES/trans_planning_summit_2003.htm Presentations from today’s meeting
8
Load Growth Projections
Record System Peak: 22,052MW1
EAI 5,533MWwith AECC 6,865
EGSI 7,042MWELI 5,124MWEMI 3,130MWENOI 1,223MW
[1] This demand level is the all-time peak demand on the Entergy system less AECC, which occurred on 8-30-00. With AECC, the peak was 23,384MW.
Beaumont
Conroe New Orleans
Baton Rouge
Jackson
W. Monroe
Little Rock
Hot Springs