1 EiT - Art and software Group 2. 2 Trond Engum Godfrey Mayende Christophe Lebègue Adrien...

16
1 EiT - Art and software Group 2

description

3 Presentation of the flounder The flounder is a metal- sculpture made by Nils Aas. It is placed in Muustrøparken at Inderøy. Besides it`s visual expression it will also have an aural interaction between audience and physical parameters provided by the environment in which it stands. The sculpture as a whole will be finished in may 2006.

Transcript of 1 EiT - Art and software Group 2. 2 Trond Engum Godfrey Mayende Christophe Lebègue Adrien...

Page 1: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

1

EiT - Art and software

Group 2

Page 2: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

2

Group 2 Trond Engum Godfrey Mayende Christophe Lebègue Adrien Garioud Henrik M. Gundersen Mari Lie Hæreid

Page 3: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

3

Presentation of the flounderThe flounder is a metal-sculpture made by Nils Aas. It is placed in Muustrøparken at Inderøy. Besides it`s visual expression it will also have an aural interaction between audience and physical parameters provided by the environment in which it stands. The sculpture as a whole will be finished in may 2006.

Page 4: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

4

The work was already started through a dialog with Nils Aas in 2003, and is placed at its destination showed in the picture. The sound installation will express itself by excite the metal of the sculpture to provide sound. The music from the sculpture will go through continuously changing, by getting input from time of year, temperature changes, and changes in light, and also by how many people there are present, and how close they are to the statue. The sound installation will be present for a ten year period before it will be removed, and the statue will take its original form.

Presentation of the flounder

Page 5: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

5

Functionality:

The flounder will provide sound but also record itself and store it by time and date. In that way it will be possible to go back to a specific time during this decade to find out what was happening then. The music will be provided by Øyvind Brandsægg`s improsculpt. (Live sampler) and will do all the processing real-time through the internet. There will also be a webpage that can be visited during this time period.

Presentation of the flounder

Page 6: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

6

Techniques:

As earlier mentioned the improsculpt will receive parameters and recordings from different surroundings in the statues environment, this in order to provide the aesthetics of the sound and how it proceeds during time.

Weather station - changes in weather Date and time - changes in time Measurements of light - changes in light Theremin principle - changes by audience.

Presentation of the flounder

Page 7: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

7

Art piece

Art piece

Art piece

• Different systems

• Different location

• One common software

Technical concepts

Page 8: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

8

Internet

Art piece

Art piece

Art piece

• Use internet to communicate

• One common server’s place

Technical concepts

Page 9: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

9

Internet

Art piece

Art piece

Art piece

• Management

• Website

Technical concepts

Page 10: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

10

Internet Art system

1

3

2

Technical concepts

Page 11: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

11

Our proposed product

A prototype of a general solution that fits the flounder project and other projects with the need for remote processingNumerous inputs of various kindDifferent outputs

A concrete demonstrational implementation of the prototype

Page 12: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

12

System overview

network

input

input

inputinput

Remote input encoder TransportProcessing

software on local server

Local input

Output stream

Stream decoding

network

Content display/playback

Page 13: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

13

We agreed on a contract for our team A fair and intelligent repartition of the tasks The meeting notes Personnal notes

THE RULES

Page 14: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

14

Why a process ? Team rules Team tools

The process or how we can achieve our product

Page 15: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

15

Sharing of the sources with Concurrent Version System (CVS)

Sharing of the documentation with our group area on it's learning

Mailing list Time planning: Gantt Diagram

THE TOOLS

Page 16: 1 EiT - Art and software Group 2. 2  Trond Engum  Godfrey Mayende  Christophe Lebègue  Adrien Garioud  Henrik M. Gundersen  Mari Lie Hæreid.

16

Project Plan

Key♦represents the project deliverables

ID Task Name Start Finish Duration2006

1/8 1/15 1/22 1/29

1 6w 24h2/24/20061/11/2006Planning – Analysis & Design

3 6w4/7/20062/27/2006Implementation

5 5w4/14/20063/13/2006Testing

7 14w 16h5/9/20061/30/2006Documentation & refining

10 8h5/10/20065/10/2006Presentation

2/5 2/12 2/19 2/26 3/5 3/12 3/19 3/26 4/2 4/9 4/16 4/23 4/30 5/7 5/14 5/21

4 0w4/10/20064/10/2006Finished product

0w2/27/20062/27/2006Requirements specification document2

0w4/17/20064/17/2006Test report6

0w4/19/20064/19/2006Deliver product and product-report

8

0w5/3/20065/3/2006Deliver process report9