Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Small Diameter Bomb (SDB)Small Diameter Bomb (SDB)Program Program
Public Overview BriefingPublic Overview Briefing
Current As of: 24 August 2001Current As of: 24 August 2001
Air Armament CenterLethal Strike JPOEglin Air Force Base, FL
2
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Disclosure & DisclaimerStatements
DISTRIBUTION A: This briefing has been cleared by AAC/PA (Public Affairs) for public release.
This is briefing is UNCLASSIFIED.
This presentation is for information only. No US Government commitment to sell, loan, lease, co-develop or co-produce defense articles or services is implied or intended.
3
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
OVERVIEWOVERVIEW
PROGRAM BACKGROUNDPROGRAM BACKGROUND OPERATIONAL REQUIREMENTSOPERATIONAL REQUIREMENTS PROGRAM SCHEDULEPROGRAM SCHEDULE
4
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Program BackgroundProgram Background MMC Mission Need Statement, ACAT Level II, Oct 97MMC Mission Need Statement, ACAT Level II, Oct 97
– Increase kills per sortieIncrease kills per sortie– Increase aircraft loadoutIncrease aircraft loadout
– Accommodate current and future aircraftAccommodate current and future aircraft
– Kill fixed, relocatable and mobiles targetsKill fixed, relocatable and mobiles targets Milestone 0 decision Feb 98Milestone 0 decision Feb 98
– Perform concept and trade studiesPerform concept and trade studies
– Evaluate both weapons and carriage systemsEvaluate both weapons and carriage systems HQ ACC, AAC, and AFRL performed Analysis of HQ ACC, AAC, and AFRL performed Analysis of
Alternatives (AoA) 1998-2000Alternatives (AoA) 1998-2000
– 22 approaches evaluated22 approaches evaluated
– Government and Industry proposed methods Government and Industry proposed methods
5
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Program Background (con’t)Program Background (con’t) Air Force Research Lab Munitions Directorate (Eglin Air Force Research Lab Munitions Directorate (Eglin
AFB FL) demonstrated technologies 1990-2000AFB FL) demonstrated technologies 1990-2000 Four Concept Study Contracts awarded 1999 ($250K Four Concept Study Contracts awarded 1999 ($250K
each) each)
– Boeing, Lockheed Martin, Northrop Grumman, Boeing, Lockheed Martin, Northrop Grumman, RaytheonRaytheon
– Conducted trade studies, defined conceptsConducted trade studies, defined concepts Four contracts modified 2000 (adding $1.3M each)Four contracts modified 2000 (adding $1.3M each)
– Develop and tested seeker and ATR algorithms Develop and tested seeker and ATR algorithms
– Characterized seeker/ATR in operational Characterized seeker/ATR in operational environmentenvironment
– Continue algorithm developmentContinue algorithm development
7
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
MMC Umbrella
SDBFixed
SDB Mobile
Miniaturized Munitions ConceptMiniaturized Munitions Concept
Phase IPhase I
Phase IIPhase II
Wide AreaSearch Autonomous
Attack MiniatureMunition
(WASAAMM)
FutureFuture
Common Common
Carriage SystemCarriage System
SDB Program Covers Phase I and Phase IISDB Program Covers Phase I and Phase II
8
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
RequirementsRequirements
Schedule #1 Priority: field systems soonest Schedule #1 Priority: field systems soonest Cost #2: Affordability, obtain price commitmentsCost #2: Affordability, obtain price commitments Performance #3Performance #3
– Phase I: GPS/INS-like accuracy (fixed/stationary)Phase I: GPS/INS-like accuracy (fixed/stationary)
– Phase II: Seeker/ATR-like accuracy Phase II: Seeker/ATR-like accuracy (mobile/relocatable)(mobile/relocatable)
2 KPPs:2 KPPs:
– LoadoutLoadout– 4 weapons per 1760 aircraft station is threshold4 weapons per 1760 aircraft station is threshold
– InteroperabilityInteroperability– Common carriage system & interface across aircraftCommon carriage system & interface across aircraft
– Compatible with C4ISR infrastructureCompatible with C4ISR infrastructure
9
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Requirements (con’t)Requirements (con’t)
Evolutionary approach to fielding systemsEvolutionary approach to fielding systems
– Phase I: Effective in GPS Jammed Environment Phase I: Effective in GPS Jammed Environment
– Phase II: Target Recognition for Autonomous Phase II: Target Recognition for Autonomous Engagement in Limited Search AreaEngagement in Limited Search Area
ORD Will Remain DRAFT until Milestone B decisionORD Will Remain DRAFT until Milestone B decision
– KPPs are only non-tradablesKPPs are only non-tradables
– CAIV : performance trades between MS A and MS BCAIV : performance trades between MS A and MS B
– HQ ACC finalize performance “thresholds” after HQ ACC finalize performance “thresholds” after seeing cost & schedule impacts to programseeing cost & schedule impacts to program
10
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Requirements (con’t)Requirements (con’t) Aircraft IntegrationAircraft Integration
– Threshold Aircraft: Threshold Aircraft: – Phase I: F-15E Phase I: F-15E
– Phase II: F-15E, F-16C/D and B-1B Phase II: F-15E, F-16C/D and B-1B
– Objective Aircraft: Objective Aircraft: – Phase I: A-10, F-16, F-117, F-22, JSF, B-1, B-52, B-2, UCAVPhase I: A-10, F-16, F-117, F-22, JSF, B-1, B-52, B-2, UCAV
– Phase II: A-10, F-117, F-22, JSF, B-52, B-2, UCAVPhase II: A-10, F-117, F-22, JSF, B-52, B-2, UCAV
Aircraft Loadouts Aircraft Loadouts A-10 F-15E F-16 F-22 F-117 JSF B-1 B-2 B-52 UCAV
Stations 4 3 2 2 2 2 24 16 12 TBD
Threshold* 16 12 8 8 8 8 96 64 48 TBD
Objective 48 36 24 12 24 24 288 192 144 TBD
*Threshold: 4 SDB weapons per 1760 interface
11
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Commonality across all threshold and objective Commonality across all threshold and objective aircraftaircraft– Standard test equipment, training, containers, loading Standard test equipment, training, containers, loading
procedures, etc.procedures, etc.
– Compatibility with B-2 Smart BRACompatibility with B-2 Smart BRA
MIL-STD-1760 interfaceMIL-STD-1760 interface
– Minimize aircraft OFP impact, single updateMinimize aircraft OFP impact, single update
– Must support individual weapon targeting, fuze Must support individual weapon targeting, fuze programming, weapon release initialization, weapon programming, weapon release initialization, weapon status reporting and weapon software reprogrammingstatus reporting and weapon software reprogramming
Individual and ripple release against one or more targetsIndividual and ripple release against one or more targets
– No single use devices for wNo single use devices for weapon ejection systemeapon ejection system
Carriage System RequirementsCarriage System Requirements
12
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
PROGRAM SCHEDULEPROGRAM SCHEDULE
13
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
SDB Program ScheduleSDB Program ScheduleFY02 FY04 FY05 FY06FY03 FY07 FY08
LRIP
FY01OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL
CAD Development& System Integration
SystemDevelopment &
Demo – 1
LRIP
Phase 1Fixed Target SDBCommon CarriageSystem
Phase 2Mobile Target SDB
SystemDevelopment &
Demo – 2
LRIP
Production
Prod
Seeker/ATR AdvancedDevelopment
SysSys
IntIntSeeker DesignSeeker Design
& Maturation& Maturation
GPS/INS VariantGPS/INS Variant
MS AMS A MS BMS B MS C2MS C2MS C1MS C1
= Decision Review= Decision Review
DownselectDownselect
RFPRFP CACA
14
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Development & System Development & System IntegrationIntegration
2 Contractors = 24 months2 Contractors = 24 months
– Design and test warhead, fuze, Design and test warhead, fuze, GPS/INS guidance, carriage for GPS/INS guidance, carriage for fixed target SDBfixed target SDB
– Develop common aircraft ICDDevelop common aircraft ICD
– Verify system level Verify system level performance requirements are performance requirements are achievable for fixed target achievable for fixed target variant variant
– Concurrent development and Concurrent development and maturation of seeker/ATR maturation of seeker/ATR algorithmsalgorithms
– Develop and test Seeker/ATRDevelop and test Seeker/ATR
– Verify costs are below Verify costs are below threshold amount for fixed threshold amount for fixed target SDB and delta for mobile target SDB and delta for mobile target varianttarget variant
1DRAFT - For Official Use Only
Pr oposed SDB Pr ogr amPr oposed SDB Pr ogr amFY02 FY04 FY05 FY06FY03 FY07 FY08
LRIP
FY01OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL OCT JAN APR JUL
ComponentAdvanced
Development
SystemDevelopment &
Demo – 1
LRIP
Phase 1Fixed Target SDBSMER
Phase 2Mobile Target SDB
SystemDevelopment &
Demo – 2
LRIP
Production
Prod
Seeker/ATR AdvancedDevelopment
SysSys
IntIntSeeker DesignSeeker Design
& Maturation& Maturation
GPS/INS VariantGPS/INS Variant
SysSys
IntInt
Free FltFree Flt
Skr Skr CFTCFT
MS AMS A MS BMS B MS C2MS C2MS C1MS C1
= Decision Review= Decision Review
DownselectDownselect
15
Dist A: UNCLASSIFIED, Cleared for unlimited Public Release AAC/PA 01-186
Further Questions & InquiryFurther Questions & Inquiry
Mail to: AAC/YVMail to: AAC/YV
Attn: Small Diameter Bomb Program OfficeAttn: Small Diameter Bomb Program Office
Suite 300Suite 300
102 West D. Ave.102 West D. Ave.
Eglin AFB FL 32542-6808Eglin AFB FL 32542-6808
DSN Prefix: 872DSN Prefix: 872
Voice Phone: (850) 882-7321 x2233Voice Phone: (850) 882-7321 x2233
Data Fax 850-882-0657Data Fax 850-882-0657