What is PATN ?What is PATN ?
PATN is an implementation of the ATN that PATN is an implementation of the ATN that supported data-link communications for the 3rd supported data-link communications for the 3rd PHARE DemonstrationPHARE Demonstration
PATN is a collaborative work, carried out by:PATN is a collaborative work, carried out by: CENA in France,CENA in France, DERA/NATS in the United Kingdom,DERA/NATS in the United Kingdom, DLR in Germany,DLR in Germany, EEC for Eurocontrol,EEC for Eurocontrol, NLR in the Netherlands.NLR in the Netherlands.
33
PATN Infrastructure: Inter-connection of ATN routersPATN Infrastructure: Inter-connection of ATN routers
SITA X.25 Network
Transpac X.25 Network
44
DERA/NATS
DERA/NATS
NLR
CENA ATH
CENA TLS
EEC
EEC
NLRSITA X.25 Network
Transpac X.25 Network
PATN Infrastructure: Inter-connection of ATN routersPATN Infrastructure: Inter-connection of ATN routers
55
PATN Infrastructure:PATN Infrastructure:
DERA/NATS
DERA/NATS
NLR
CENA ATH
CENA TLS
EEC
EEC
NLR
The end-systemsThe end-systems
SITA X.25 Network
Transpac X.25 Network
66
Data-Link Services supported by PATNData-Link Services supported by PATN
Downlinking of Aircraft Parameters (DAP)Downlinking of Aircraft Parameters (DAP) Frequency Change (FC)Frequency Change (FC) Position Reporting (PR)Position Reporting (PR) Trajectory Negotiation (TN)Trajectory Negotiation (TN)
77
Main Phases of the PATN ProjectMain Phases of the PATN Project
PATN in stand-by during the external development of PATN in stand-by during the external development of the ATN Router by the EURATN projectthe ATN Router by the EURATN project
Development of ATN Upper-LayersDevelopment of ATN Upper-Layers Development of PATN Application Service ElementsDevelopment of PATN Application Service Elements Deployment of the PATN infrastructure:Deployment of the PATN infrastructure:
RoutersRouters PATN end systemsPATN end systems
Integration in the air and ground platforms of the Integration in the air and ground platforms of the partnerspartners
88
Technical Choices for PATNTechnical Choices for PATN
Compliance with International Civil Aviation Compliance with International Civil Aviation Organisation (ICAO) standards for the Organisation (ICAO) standards for the Aeronautical Telecommunication Network Aeronautical Telecommunication Network whenever applicablewhenever applicable
Aeronautical Mobile Satellite Services (AMSS) Aeronautical Mobile Satellite Services (AMSS) retained as the mobile subnetwork for air-retained as the mobile subnetwork for air-ground communicationsground communications
99
PATN Approach to DevelopmentsPATN Approach to Developments
Use of the EURATN routerUse of the EURATN router Use of commercial off-the-shelf industrial productsUse of commercial off-the-shelf industrial products
ATN Upper-LayersATN Upper-Layers
ICAO Standard ATN application:ICAO Standard ATN application: Controller-Pilot Data-Link CommunicationsController-Pilot Data-Link Communications
PHARE-Specific applications:PHARE-Specific applications: Downlinking of Aircraft Parameters ; Position Reporting ; Downlinking of Aircraft Parameters ; Position Reporting ;
Trajectory NegotiationTrajectory Negotiation
Access to the mobile subnetwork:Access to the mobile subnetwork: Interface between AMSS avionics and PATN workstationsInterface between AMSS avionics and PATN workstations
1010
PATN Spin-OffsPATN Spin-Offs
ATN ValidationATN Validation AATMS project with the involvment of DERA AATMS project with the involvment of DERA
and NLRand NLR CHARME project for CENACHARME project for CENA
1111
ATN ValidationATN Validation
First prototype implementation of ATN upper-layers First prototype implementation of ATN upper-layers communication servicescommunication services
Agreement between PHARE and an industrial partner:Agreement between PHARE and an industrial partner: The PATN upper-layers were re-engineered as an industrial The PATN upper-layers were re-engineered as an industrial
productproduct PATN partners are entitled free source and binary licencesPATN partners are entitled free source and binary licences Free maintenance on the ATN upper-layers productFree maintenance on the ATN upper-layers product
First deployment of a full-stack ATN infrastructure with First deployment of a full-stack ATN infrastructure with air and ground componentsair and ground components
Kernel of an ATN infrastructure for the PATN partnersKernel of an ATN infrastructure for the PATN partners
1212
AATMS ProjectAATMS Project
Validation of advanced Flight Management SystemsValidation of advanced Flight Management Systems Implementation of a data-link infrastructure:Implementation of a data-link infrastructure:
Adapted ATN based on PATNAdapted ATN based on PATN Connection of:Connection of:
DERA BAC 1-11 experimental aircraftDERA BAC 1-11 experimental aircraft NLR Cessna Citation experimental aircraftNLR Cessna Citation experimental aircraft AATMS ground infrastructureAATMS ground infrastructure
Transparently « switchable » access to:Transparently « switchable » access to: Aeronautical Mobile Satellite Services (AMSS)Aeronautical Mobile Satellite Services (AMSS) VHF Digital Link (VDL) mode 2VHF Digital Link (VDL) mode 2
1313
CHARME ProjectCHARME Project
Experimental ATN platform of the French DGACExperimental ATN platform of the French DGAC Support of data-link experimentations, such as:Support of data-link experimentations, such as:
EOLIA (European pre-operational data-link application)EOLIA (European pre-operational data-link application) COCLICO (internal CENA project on the co-operation of COCLICO (internal CENA project on the co-operation of
collaborative tools and data-link for the control)collaborative tools and data-link for the control)
Contribution to the validation of the ICAO standards for Contribution to the validation of the ICAO standards for the ATN:the ATN: Future data-link applicationsFuture data-link applications ATN Security & System ManagementATN Security & System Management Connectionless ATN servicesConnectionless ATN services
1414
Existing PATN EnhancementsExisting PATN Enhancements
For AATMS:For AATMS: access to VDL mode 2access to VDL mode 2 Automatic Dependent Surveillance (ADS) Automatic Dependent Surveillance (ADS)
applicationapplication For CHARME:For CHARME:
Automatic Dependent Surveillance (ADS) Automatic Dependent Surveillance (ADS) application and ADS Report Forwardingapplication and ADS Report Forwarding
Flight Information Services (FIS) applicationFlight Information Services (FIS) application Context Management applicationContext Management application
1515
Experimental ResultsExperimental Results
Requirements per aircraft for the PD/3 scenario:Requirements per aircraft for the PD/3 scenario: 100 bytes every 10 seconds for Position Reporting100 bytes every 10 seconds for Position Reporting up to 3000 bytes for a Trajectory Negotiationup to 3000 bytes for a Trajectory Negotiation around 100 bytes per clearance Good behaviour of loopback around 100 bytes per clearance Good behaviour of loopback
configurations of upper-layers used for the simulated air-trafficconfigurations of upper-layers used for the simulated air-traffic
Good behaviour of loopback configurations of ATN upper-layers Good behaviour of loopback configurations of ATN upper-layers used for the simulated air-trafficused for the simulated air-traffic
Problems with the reliability of the AMSS for data-link Problems with the reliability of the AMSS for data-link communications with the actual aircraftcommunications with the actual aircraft
Better performances were stated by AATMS with VDL mode 2Better performances were stated by AATMS with VDL mode 2
1616
ConclusionConclusion
PATN provided the realistic data-link infrastructure PATN provided the realistic data-link infrastructure required for PD/3required for PD/3
PATN contributed to the validation of the ATN protocol PATN contributed to the validation of the ATN protocol suitesuite
The quality of service provided by the mobile The quality of service provided by the mobile subnetwork is critical for the perceived quality of ATN subnetwork is critical for the perceived quality of ATN services: AMSS did not perform as expected at the time services: AMSS did not perform as expected at the time of PD/3of PD/3
The PATN components and infrastructure can be The PATN components and infrastructure can be successfully built-upon by the partnerssuccessfully built-upon by the partners
1717
CENTRE D'ETUDESDE LA NAVIGATIONAERIENNE
PHARE Aeronautical Telecommunication Network:
PATN
PHARE Aeronautical Telecommunication Network:
PATN
By Gérard Mittaux-BironBy Gérard Mittaux-Biron
PATN Project LeaderPATN Project Leader
CENACENAnextnext