1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab...

25
0 4 8 16 0 4 8 0 4 0 4 0 2 6" 0 2 6" 0 1 6" 6" one eighth inch = one foot one quarter inch = one foot three eighths inch = one foot one half inch = one foot three quarters inch = one foot one inch = one foot one and one half inch = one foot three inches = one foot 1 VA FORM 08-6231 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 A B C D E F A B C D E F Drawing Title Project Title Location Date Revisions: Date Building Number FULLY SPRINKLERED BID DOCUMENTS Checked Drawn Drawing Number Project Number 101 W. STATION SQUARE DRIVE, FOURTH FLOOR PITTSBURGH, PENNSYLVANIA 15219 PH: 412.287.7333 FAX: 412.287.7334 www.ae-works.com A E works Lab Consultant: Environmental Consultant: 21 Philadelphia, PA VA Philadelphia 2nd and 5th Floor Renovations JD AHK August 8, 2011 642-10-160 COVERSHEET X1 VA PHILADELPHIA MEDICAL CENTER BUILDING 21 LABORATORY RENOVATION PROJECT DIRECTORY DRAWING LIST OWNER: DEPARTMENT OF VETERAN AFFAIRS PHILADELPHIA VAMC UNIVERSITY AND WOODLAND AVENUE PHILADELPHIA, PA 19104 CONTRACTING OFFICER TECHNICAL REP: JEFF MACIEJEWSKI 215.823.5800 x6107 [email protected] PROJECT MANAGER: AE WORKS LTD. 101 W. STATION SQUARE DRIVE, FOURTH FLOOR PITTSBURGH, PA 15219 POINT OF CONTACT: MARK SHANNON, AIA 412.287.7333 x203 [email protected] ARCHITECT & MEP ENGINEERS: LOCATION MAP E1 LEGENDS AND GENERAL NOTES E2 SECOND FLOOR ELECTRICAL DEMOLITION PLAN E3 FIFTH FLOOR ELECTRICAL DEMOLITION PLAN E4 SECOND FLOOR LIGHTING PLAN - NEW WORK E5 FIFTH FLOOR LIGHTING PLAN - NEW WORK E6 SECOND FLOOR POWER AND SYSTEMS PLAN - NEW WORK E7 FIFTH FLOOR POWER AND SYSTEMS PLAN - NEW WORK E8 PENTHOUSE ELECTRICAL PLAN - NEW WORK E9 ELECTRICAL RISER DIAGRAM E10 LUMINAIRE DATA SHEETS E11 LUMINAIRE DATA SHEETS AND DETAILS E12 SECOND FLOOR ELECTRICAL PANEL SCHEDULES E13 FIFTH FLOOR ELECTRICAL PANEL SCHEDULES E14 ELECTRICAL DETAILS AE WORKS LTD. 101 W. STATION SQUARE DRIVE, FOURTH FLOOR PITTSBURGH, PA 15219 ARCHITECT POC: MARK SHANNON, AIA 412.287.7333 x203 [email protected] MECHANICAL POC: MICHAEL MCNABB, PE 412.287.7333 x207 [email protected] FIRE PROTECTION & PLUMBING POC: MICHAEL WELESKI 412.287.7333 x206 [email protected] ELECTRICAL POC: SHANE SEMPLE, PE 412.287.7333 x211 [email protected] LAB CONSULTANT: SMITHGROUP 500 GRISWOLD STREET, SUITE 1700 DETROIT, MI 48226 POINT OF CONTACT: JERRY SIENKIEWICZ, AIA 313.442.8360 [email protected] ARCHITECTURAL A1 DEMOLITION PLANS A2 DEMOLITION REFLECTED CEILING PLANS A3 SECOND FLOOR NEW WORK A4 FIFTH FLOOR NEW WORK A5 SECOND FLOOR REFLECTED CEILING PLAN A6 FIFTH FLOOR REFLECTED CEILING PLAN A7 SECOND FLOOR EQUIPMENT/CASEWORK PLAN A8 FIFTH FLOOR EQUIPMENT/CASEWORK PLAN A9 INTERIOR ELEVATIONS A10 CASEWORK AND INTERIOR ELEVATIONS A11 CASEWORK AND INTERIOR ELEVATIONS A12 CASEWORK AND INTERIOR ELEVATIONS A13 CASEWORK SECTIONS A14 CASEWORK GENERAL INFORMATION A15 ENLARGED PLANS AND DETAILS A16 FINISH PLANS A17 SCHEDULES AND DOOR DETAILS A18 EQUIPMENT SCHEDULE A19 SINK AND FIXTURE SCHEDULE H1 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES H2 FIRST FLOOR, DUCTWORK AND PIPING DEMOLITION PLAN H3 SECOND FLOOR, DUCTWORK DEMOLITION PLAN H4 SECOND FLOOR, PIPING DEMOLITION PLAN H5 PARTIAL THIRD FLOOR PLAN, DUCTWORK DEMOLITION H6 FOURTH FLOOR PIPING DEMOLITION PLAN AND BUILDING 21 LOW ROOF NEW WORK PLAN H7 FIFTH FLOOR, DUCTWORK DEMOLITION PLAN H8 FIFTH FLOOR, PIPING DEMOLITION PLAN H9 PENTHOUSE, DUCTWORK DEMOLITION AND NEW WORK PLAN H10 FIRST FLOOR DUCTWORK AND PIPING NEW WORK PLAN H11 SECOND FLOOR DUCTWORK NEW WORK PLAN H12 SECOND FLOOR PIPING NEW WORK PLAN H13 FIFTH FLOOR DUCTWORK NEW WORK PLAN H14 FIFTH FLOOR PIPING NEW WORK PLAN H15 PENTHOUSE NEW WORK PLAN H16 ROOF NEW WORK PLAN H17 HVAC DETAILS H18 HVAC DETAILS H19 HVAC LAB CONTROL SEQUENCES AND DETAILS H20 HVAC SUPPLY AND EXTERNAL EXHAUST AIR RISER DIAGRAMS H21 HVAC INTERNAL EXHAUST AIR RISER DIAGRAM H22 HVAC SUPPLY SHAFT SECTIONS H23 HVAC SCHEDULES H24 HVAC SCHEDULES MECHANICAL P1 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULES P2 SECOND FLOOR PLUMBING DEMOLITION PLAN P3 FOURTH FLOOR PLUMBING DEMOLITION PLAN P4 FIFTH FLOOR PLUMBING DEMOLITION PLAN P5 SECOND FLOOR, PLUMBING NEW WORK PLAN P6 FIFTH FLOOR, PLUMBING NEW WORK PLAN P7 PLUMBING SCHEMATIC DIAGRAMS P8 PLUMBING DETAILS P9 PLUMBING DETAILS PLUMBING X1 PROJECT COVERSHEET X2 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES X3 LIFE SAFETY PLANS X4 PHASING PLANS X5 PARTITION SCHEDULES & DETAILS GENERAL FIRE PROTECTION ELECTRICAL F1 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULES F2 FIRE PROTECTION DEMOLITION PLANS F3 FIRE PROTECTION NEW WORK PLANS N PROJECT LOCATION PHILADELPHIA, PENNSYLVANIA HALLWAY RENDERING LABORATORY RENDERING

Transcript of 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab...

Page 1: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

CO

VER

SHEE

T

X1

VA PHILADELPHIA MEDICAL CENTERBUILDING 21 LABORATORY RENOVATION

PROJECT DIRECTORY

DRAWING LIST

OWNER:

DEPARTMENT OF VETERAN AFFAIRSPHILADELPHIA VAMCUNIVERSITY AND WOODLAND AVENUEPHILADELPHIA, PA 19104

CONTRACTING OFFICER TECHNICAL REP:JEFF MACIEJEWSKI215.823.5800 [email protected]

PROJECT MANAGER:

AE WORKS LTD.101 W. STATION SQUARE DRIVE, FOURTH FLOORPITTSBURGH, PA 15219

POINT OF CONTACT: MARK SHANNON, AIA412.287.7333 [email protected]

ARCHITECT & MEP ENGINEERS:

LOCATION MAP

E1 LEGENDS AND GENERAL NOTESE2 SECOND FLOOR ELECTRICAL DEMOLITION PLANE3 FIFTH FLOOR ELECTRICAL DEMOLITION PLANE4 SECOND FLOOR LIGHTING PLAN - NEW WORKE5 FIFTH FLOOR LIGHTING PLAN - NEW WORKE6 SECOND FLOOR POWER AND SYSTEMS PLAN - NEW WORKE7 FIFTH FLOOR POWER AND SYSTEMS PLAN - NEW WORKE8 PENTHOUSE ELECTRICAL PLAN - NEW WORKE9 ELECTRICAL RISER DIAGRAME10 LUMINAIRE DATA SHEETSE11 LUMINAIRE DATA SHEETS AND DETAILSE12 SECOND FLOOR ELECTRICAL PANEL SCHEDULESE13 FIFTH FLOOR ELECTRICAL PANEL SCHEDULESE14 ELECTRICAL DETAILS

AE WORKS LTD.101 W. STATION SQUARE DRIVE, FOURTH FLOORPITTSBURGH, PA 15219

ARCHITECT POC: MARK SHANNON, AIA412.287.7333 [email protected]

MECHANICAL POC: MICHAEL MCNABB, PE412.287.7333 [email protected]

FIRE PROTECTION & PLUMBING POC: MICHAEL WELESKI412.287.7333 [email protected]

ELECTRICAL POC: SHANE SEMPLE, PE412.287.7333 [email protected]

LAB CONSULTANT:

SMITHGROUP500 GRISWOLD STREET, SUITE 1700DETROIT, MI 48226

POINT OF CONTACT: JERRY SIENKIEWICZ, [email protected]

ARCHITECTURAL

A1 DEMOLITION PLANSA2 DEMOLITION REFLECTED CEILING PLANSA3 SECOND FLOOR NEW WORKA4 FIFTH FLOOR NEW WORKA5 SECOND FLOOR REFLECTED CEILING PLANA6 FIFTH FLOOR REFLECTED CEILING PLANA7 SECOND FLOOR EQUIPMENT/CASEWORK PLANA8 FIFTH FLOOR EQUIPMENT/CASEWORK PLANA9 INTERIOR ELEVATIONSA10 CASEWORK AND INTERIOR ELEVATIONSA11 CASEWORK AND INTERIOR ELEVATIONSA12 CASEWORK AND INTERIOR ELEVATIONSA13 CASEWORK SECTIONSA14 CASEWORK GENERAL INFORMATIONA15 ENLARGED PLANS AND DETAILSA16 FINISH PLANSA17 SCHEDULES AND DOOR DETAILSA18 EQUIPMENT SCHEDULEA19 SINK AND FIXTURE SCHEDULE

H1 SYMBOLS, ABBREVIATIONS AND GENERAL NOTESH2 FIRST FLOOR, DUCTWORK AND PIPING DEMOLITION PLANH3 SECOND FLOOR, DUCTWORK DEMOLITION PLANH4 SECOND FLOOR, PIPING DEMOLITION PLANH5 PARTIAL THIRD FLOOR PLAN, DUCTWORK DEMOLITIONH6 FOURTH FLOOR PIPING DEMOLITION PLAN AND BUILDING 21 LOW

ROOF NEW WORK PLANH7 FIFTH FLOOR, DUCTWORK DEMOLITION PLANH8 FIFTH FLOOR, PIPING DEMOLITION PLANH9 PENTHOUSE, DUCTWORK DEMOLITION AND NEW WORK PLANH10 FIRST FLOOR DUCTWORK AND PIPING NEW WORK PLANH11 SECOND FLOOR DUCTWORK NEW WORK PLANH12 SECOND FLOOR PIPING NEW WORK PLANH13 FIFTH FLOOR DUCTWORK NEW WORK PLANH14 FIFTH FLOOR PIPING NEW WORK PLANH15 PENTHOUSE NEW WORK PLANH16 ROOF NEW WORK PLANH17 HVAC DETAILSH18 HVAC DETAILSH19 HVAC LAB CONTROL SEQUENCES AND DETAILSH20 HVAC SUPPLY AND EXTERNAL EXHAUST AIR RISER DIAGRAMSH21 HVAC INTERNAL EXHAUST AIR RISER DIAGRAMH22 HVAC SUPPLY SHAFT SECTIONSH23 HVAC SCHEDULESH24 HVAC SCHEDULES

MECHANICAL

P1 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULESP2 SECOND FLOOR PLUMBING DEMOLITION PLANP3 FOURTH FLOOR PLUMBING DEMOLITION PLANP4 FIFTH FLOOR PLUMBING DEMOLITION PLANP5 SECOND FLOOR, PLUMBING NEW WORK PLANP6 FIFTH FLOOR, PLUMBING NEW WORK PLANP7 PLUMBING SCHEMATIC DIAGRAMSP8 PLUMBING DETAILSP9 PLUMBING DETAILS

PLUMBINGX1 PROJECT COVERSHEETX2 SYMBOLS, ABBREVIATIONS AND GENERAL NOTESX3 LIFE SAFETY PLANSX4 PHASING PLANSX5 PARTITION SCHEDULES & DETAILS

GENERAL

FIRE PROTECTION

ELECTRICAL

F1 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULESF2 FIRE PROTECTION DEMOLITION PLANSF3 FIRE PROTECTION NEW WORK PLANS

N

PROJECT LOCATION

PHILADELPHIA, PENNSYLVANIA

HALLWAY RENDERING

LABORATORY RENDERING

Page 2: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

2'-5"

MIN

. 4'-4"

4'-0"

max

max

1'-9"

min1'-3"

top

of sp

out

3'-4"

top

of se

at1'-

10"2'-2"

ACCESSIBLELAVATORY

PAPER TOWELDISPENSER

HDCPURINAL

HDCP ELECTRICWATER COOLER

TOILETPAPER

DISPENDER

HDCP TOILET

JANITOR'S CLOSETFRONT WALL

JANITOR'S CLOSETSIDE WALL

TACKBOARD/MARKERBOARD

FIRE HOSECABINET

FIREEXTINGUISHERCABINET

6'-0"

4'-8"

3'-0"

7'-0"

4'-8

3/4"

5'-0

3/4"

< 4

0#

3'-6

3/4"

>40

#

URINALSCREEN18" DEEP

8"x24" UTILITYSHELF

MOP HOLDER(TBA)

CONTROLS

SERVICERECEPTOR

FHC FEC

2'-10

"M

AX

HDCP COATHOOK

4'-6"

CONCRETE - CASTIN PLACE/PRECAST

RESLIENTTILE FLOORING

TILE (CERAMICOR QUARRY)PLASTER, SAND,GYPSUM BOARD,PARTICLE BOARD

WOOD (FINISH)

WOOD BLOCKING ORFRAMING

WOOD SHIM

PLYWOOD

INSULATION

METAL

ACOUSTICAL MATERIAL

EXPANSION MATERIAL

5

A1

1

N

N

A2001

A200OFFICE

1

SIXTH FLOOR - NEW WORK PLANSCALE: 1/4" = 1-0"

1

A2

DETAIL REFERENCE

AREA TO BE DETAILEDOR ENLARGED

DETAIL NUMBER

SHEET NUMBER

ELEVATION REFERENCE

A1

1DETAIL NUMBER

SHEET NUMBER

WALL FINISH REFERENCE

P1

KEYNOTE1

NORTH ARROWN

REVISION IDENTIFICATION

WORK POINT, CONTROLOR DATUM POINT

COLUMN GRID DESIGNATORS

D.1

SECTION REFERENCE

A1

1DETAIL NUMBER

SHEET NUMBER

ROOM IDENTIFICATIONROOM NAME

ROOM NUMBER

VIEW TITLE DESIGNATIONVIEW TITLE

VIEW SCALE

VIEW NUMBER

SHEET NUMBER

SHEET NUMBERING

A3DISCIPLINE SEQUENTIAL SHEET NUMBER

WINDOW TYPE

CORNER GUARD

CG

GRID OR CENTER LINE

BREAK LINE

LEADER

.

DOORS

PARTITIONS

EXISTING WALLTO REMAIN

EXISTING WALLTO BE REMOVED

NEW WALL

PARTITION TYPE

EXISTING DOORTO BE REMOVED

EXISTING DOORTO REMAIN

NEW DOOR

DOOR NUMBERROOM NUMBER

BATHROOM FIXTURE2

EXISTING WINDOWTO REMAIN

241Office

Room number ID signage ismounted at 2" for the edge of thedoor frame, mounted on the handleside of the door.

The top of the sign shall be mountedat 64" from the floor.

5'-4"

2"

9"

9"

9"

3"

9"

9"

9"

9"

9"

9"

Standard RoomIdentification Sign

Toilet RoomIdentificationSign

BiohazardSign

Stair Sign

9"

9"

AuthorizedPersonnelSign

1'-6"

1'-6"

Life Safety FireExit Plans

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

SYM

BOLS

, ABB

REV

IATI

ON

S AN

DG

ENER

AL N

OTE

S

X2

&

AAAPABACFLACOUSACTADADDADDLADJADJADMINAFFAHUALALTALUMAMAMENDANESANUNAPAPCAPROXARCHAUTOAWT

BABACTBASSBBDBCBDBFEBGBITBKTBLDGBLKGBLTBLWBMBOBOFBOTBPCBPGBRBRGBRLBSMTBTWNBUR

CC DISPCABCANTLCAPCATCBDCCTCCTVCDCDCGCHCHEMCJTCLCLCLGCLRCMCMUCOCOCO2COLCOMBCONCCONFCONNCONSTCONTCONTRCOORDCORRCPTCTCTCTRCTSKCUHCVCWCWCYLCYSTO

DDEMODEPRDEPTDETDFDIADIAGDICTDIFFDIMDIRDISPDISTDIVDIWDJTDNDPDPDRDRDSDSWDWDWGDWLS

EECECGEEGEENTEFEIFS

EJELELECELEVEMERGEMGENCLENTENTREOEPEQEQUIPESETREWCEXAEXCEXHEXISTEXPEXT

AND

AIR (CLINICAL)ALARM ANNUNCIATOR PANELANCHOR BOLTACCESSACOUSTICAL FIXTACOUSTICAL CEILING TILEAREA DRAINADDENDUMADDITIONALADJUST/ ABLEADJACENTADMINISTRATIONABOVE FINISH FLOORAIR HANDLING UNITALIGNALTERNATEALUMINUMANESTHESIA MONITORAMENDMENTANESTHESIOLOGYANNUNCIATORACCESS PANELARCHITECTURAL PRECASTCONCRETEAPPROXIMATEARCHITECTURALAUTOMATICACOUSTICAL WALL TREATMENT

BACTERIOLOGYBUILDING ACCESSORY\BASSINETBULLETIN BOARDBRICK COURSESBOARDBOTIOM FOOTING ELEVATIONBUMPER GUARDBITUMINOUSBRACKETBUILDINGBLOCKINGBORROWED LIGHTBELOWBEAMBY OWNERBY OWNER FUTUREBOTTOMBED PAN CABINETBLOOD PRESSURE GAUGEBRICKBEARINGBRICK LEDGEBASEMENTBETWEENBUILT-UP ROOFING

CHANNELCUP DISPENSERCABINETCANTILEVERCAPACITYCATEGORYCHALKBOARDCUBICLE CURTAIN TRACKCLOSED CIRCUIT TELEVISIONCOlLING DOORCOlLING GRILLECORNER GUARDCOAT HOOKCHEMISTRYCONTROL JOINTCENTER LINECLASSCEILINGCLEARCONSTRUCTION MANAGERCONCRETE MASONRY UNITCLEAN OUTCASED OPENINGCARBON DIOXIDECOLUMNCOMBINATION/-EDCONCRETECONFERENCECONNECT/-ED./-!ONCONSTRUCTIONCONTINUE/OUSCONTRACT/ORCOORDINATECORRIDORCARPETCERAMIC TILECAT SCANCENTERCOUNTERSUNKCABINET UNIT HEATERCARDIOVASCULARCURTAIN WALLCOLD WATERCYLINDERCYSTOSCOPY

DEPTH OR DEEPDEMOLITIONDEPRESSIONDEPARTMENTDETAIL/SDRINKING FOUNTAINDIAMETERDIAGONALDICTATIONDIFFUSERDIMENSIONDIRECTORDISPENSERDISTRIBUTIONDIVISIONDEIONIZED WATERDUMMY JOINTDOWNDEMOUNTABLE PARTITIONDATA PROCESSINGDOORDOCTORDOWNSPOUTDISTILLED WATERDUMBWAITERDRAWINGDOWELS

EXISTINGELECTRIC CABINETELECTROCARDIOGRAPHYELECTROENCEPHALOGRAPHYEYE EAR NOSE & THROATEXHAUST FANEXTERIOR INSULATIONAND FINISH SYSTEMEXPANSION JOINTELEVATIONELECTRICALELEVATOREMERGENCYELECTROMAYOGRAPHYENCLOSUREEAR NOSE THROATENTRANCEELECTRICAL OUTLETEXPLOSION PROOFEQUALEQUIPMENTEND SECTIONEXISTING TO REMAINELECTRIC WATER COOLEREXHAUST AIREXCAVATE/-ED/-IONEXHAUST HOODEXISTINGEXPANSIONEXTERIOR

FAFBFBRFDFDNFDVFEFECFGSFHFHCFHPFHVFINF!XTFLFLFLASHFLEXFLGFLUORFLUOROFPFRMGFRSFSFSFSTOPFTFTGFTRFURRFUTFV

GGAGALGALVGBGBGCGENGENGLGMUGRGYBGYNGYPSHGT

HHBHDHDCPHDRHOWHMHORIZHPTHRHSKPHTHTRHVACHWHWHWD

ICICCUICUlDININSULINTISOISOLPPIV

JANJBJSTJT

KO

LLLAVlBLCDLFLINKKRLLHLLVLMCLOCLPTLSLTLTGLVRLWC

MMANMATLMAXMBDMCMCUMECHMEDMEMBMETMEZZMFRMGAMHMHCMINMIRMISCMDMONOMPCMPUMRIMTDMTLMTRMULL

NANICNONOMNRCNTNTS

OOBOCODOFFOHOPOPOPEROPNGOPPORORDORTHOOT

FIRE ALARMFIRE BLANKETFACE BRICKFLOOR DRAINFOUNDATIONFIRE DEPARTMENT VALVEFIRE EXTINGUISHERFIRE EXTINGUISHER CABINETFOAM GASKET SEALFIRE HOSEFIRE HOSE CABINETFULL HEIGHT PARTITIONFIRE HOSE VALVEFINISHFIXTUREFLOORFLOW LINEFLASHINGFLEXIBLEFLANGEFLUORESCENTFLUOROSCOPY/FLUOROSCOPEFIRE PROOFINGFRAMINGFLUSHING RIM SINKFULL SIZEFLOOR SINKFIRESTOPP!NGFOOT/FEETFOOTINGFIN TUBE RADIATIONFURRINGFUTUREFILM VIEWER

GASGAUGEGALLONSGALVINIZEDGRAB BARGRADE BEAMGENERAL CONTRACTORGENERALGENERATORGLASSGLASS MASONRY UNITGRADEGYPSUM BOARDGYNECOLOGYGYPSUM SHEA THING

HIGHHOSE BIBHAND DRYERHANDICAPHEADERHARDWAREHOLLOW METALHORIZONTALHIGHPOINTHANDRAILHOUSEKEEPINGHEIGHTHEATERHEATING, VENTILATING, AIR CONDITIONINGHOT WATERHEAD WALLHARDWOOD

INTERCOMINTENSIVE CARDIAC CARE UNITINTENSIVE CARE UNITINSIDE DIAMETERINCHINSULATIONINTERIORISOLATIONISOLATED POWER PANELINTRA VENOUS

JANITORJUNCTION BOXJOISTJOINT

KNOCK OUT

L ANGLELAVATORYLAVATORYPOUNDLINEAR CEILING DIFFUSERLINE FIGUREDLINEARLOCKERLONG LEG HORIZONTALLONG LEG VERTICALLINEAR METAL CEILINGLOCATION OR LOCATELOW POINTLAWN SPRINKLINGLIGHTLIGHTINGLOUVERLINEAR WOOD CEILING

MIDDLEMANUALMATERIALMAXIMUMMARKER BOARDMEDICINE CABINETMODULAR COOLING UNITMECHANICALMEDICAL/TIONMEMBRANEMETALMEZZANINEMANUFACTURERMEDICAL GAS ALARMMANHOLEMATERIAL HANDLING CONVEYORMINIMUMMIRRORMISCELLANEOUSMASONRY OPENINGMONOLITHICMETAL PAN CEILINGMULTI-PURPOSE UNITMAGNETIC RESONANCE IMAGINGMOUNTEDMETALMOTORMULLION

NOT APPLICABLENOT IN CONTRACTNUMBERNOMINALNOISE REDUCTION COEFFICIENTNOTENOT TO SCALE

OXYGENOBSTETRICSON CENTEROUTSIDE DIAMETEROFFICEOVERHEADOPERABLE PARTITIONOUTPATIENTOPERATOROPENINGOPPOSITEOPERATING ROOMOVERFLOW ROOF DRAINORTHOPEDICSOCCUPATIONAL THERAPY

PARPARTPBPCPCDPEDPEDSPHARMPHYSPHYSICSPICUPLPLPLAMPLBGPLSPLWPNLPRPRELIMPREPPRESPRESSPRIMPROCPROJPRVPSYCHPTPTPTCPTRPTSPULMOPVC

QT

RRRARADRBRDRERECRECPREFREFRREGREHABREINFREMREQDRETREVREVRFRFRFIRHRMRORSRWCS

SANSCHEDSDSDSDISPSECTSECYSFSFSHSHDSHTSHTGSIMSLSLNTSLVSMSNCSNDSOGSPSPCSPECSPRSQSQ YDSRSSSSSSSTSTSTSTASTCSTDSTERSTLSTNSTNLSTORSTRUCTSTSSUPVSURGSUSPSWSWSWDSYM

TTANTBDTCTCABTDISPTORTELTEMPTERTGTHERTHRESTPHTRTRANSFTSTSCTVTYP

UUCUCUFOUGUHUNF!NUNOUSUTIL

VVBVCVCOVENTVERTVESTVIFVRVTR

WWW/W/0WCWCWDWEWDWWGWHWHCHWHTRWPWPSWRWSWSWSCTWTWTWWWWF

ZVBZBC

POST ANESTHESIA RECOVERYPARTITIONPUSH BUTIONPRECAST CONCRETEPAPER CUP DISPENSERPEDESTALPEDIATRICSPHARMACYPHYSICALPHYSIOLOGICIALPEDIATRIC INTENSIVE CARE UNITPLATEPROPERTY LINEPLASTIC LAMINATEPLUMBINGPLASTERPLYWOODPANELPAIRPRELIMINARYPREPARATIONPLASTIC RESINPRESSUREPRIMARYPROCEDUREPROJECTIONPOWER ROOF VENTILATORPSYCHOLOGYPHYSICAL THERAPYPAINTPNEUMATIC TUBE STATIONPAPER TOWEL CABINETPRINTERPULMONARYPOLYVINYL CHLORIDE

QUARRY TILERADIUSRISERRETURN AIRRADIATION/OLOGYRESILIENT BASEROOF DRAINRELOCATE EXISTINGRECESSEDRECEPTIONREFERENCEREFRIGERA TORREGISTERREHABILITATIONREINFORCE/-ED/-INGREMOVEREQUIREDRETAININGREVERSEREVISERESILIENT FLOORRADIO FREQUENCYREQUEST FOR INFORMATIONROOF HATCHROOMROUGH OPENINGROUGH SLABRAIN WATER CONDUCTOR

SINKSANITARYSCHEDULESHOWER DRAINSMOKE DAMPERSOAP DISPENSERSECTIONSECRETARYSTORE FRONTSQUARE FOOTSHOWERSHOWER HEADSHEETSHEATHINGSIMILARSEALERSEALANTSLEEVESURFACE MOUNTEDSANITARY NAPKIN CABINETSANITARY NAPKIN DISPOSERSLAB ON GRADESTANDPIPESPECIMEN PASS THROUGH CABINETSPECIFICATIONSSINGLE PLY ROOFSQUARESQUARE YARDSERVICE RECEPTORSERVICE SINKSURGEONS SCRUB SINKSTAINLESS STEELSTREETSTONE TILESTATIONSOUND TRANSMISSIONSTANDARDSTERILIZERSTEELSTONESTONE LEDGESTORAGESTRUCTURALSTEEL STRUCTURESUPERVISORSURGERY/ICALSUSPENDEDSTEEL WINDOWSSWITCHSOFTWOODSYMMETRICALTOP

TOPTANGENTTACK BOARDTIME CLOCKTOWEL CABINETTISSUE DISPENSERTRENCH DRAINTELEPHONETEMPERATURETERRAZZOTONGUE & GROOVETHERAPIST/YTHRESHOLDTOILET PAPER HOLDERTREADTRANSFORMERTUBE SECTIONTOILET SEAT COVER DISPENSERTELEVISIONTYPICAL

URINALUNDERCUTUNDER COUNTERUNDER FLOOR DUCTUNDERGROUNDUNIT HEATERUNFINISHEDUNLESS NOTED OTHERWISEUTILITY SHELFUTILITY

VACUUMVACUUM BREAKERVALVE CABINETVACUUM CLEANING OUTLETVENTILATIONVERTICALVESTIBULEVERIFY IN FIELDVAPOR RETARDERVENT THROUGH ROOF

WIDTH/WIDEWIDE FLANGEWITHWITHOUTWATER CLOSETWALL COVERINGWOODWASHER EXTRACTORWINDOWWALL GUARDWALL HYDRANTWHEELCHAIRWATER HEATERWATERPROOFWALL PROTECTION SYSTEMWASTE RECEPTACLEWEATHERSTRIPWASHER STERILIZERWAINSCOTWINDOW TREATMENTWEIGHTWOOD WINDOWWELDED WIRE FABRIC

ZONE VALVE BOXZONE VALVE CABINET

ARCHITECTURAL ABBREVIATIONS GENERAL NOTESDO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. VERIFY ALL DIMENSIONS PRIOR TO START OF WORK.IN THE EVENT OF DISCREPANCY, NOTIFY THE ARCHITECT AND OBTAIN RESOLUTION BEFORE PROCEEDING.

NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONTRACTDOCUMENTS BEFORE PROCEEDING WITH THAT PORTION OF WORK. FAILURE TO NOTIFY THE ARCHITECT WILL NOTRELIEVE THE CONTRACTOR OF RESPONSIBILITY TO PERFORM THE WORK AS INTENDED BY THE CONTRACTDOCUMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL WORK ARISING FROM SUCH FAILURETO COORDINATE DISCREPANCIES TO THE SATISFACTION OF THE ARCHITECT.

VERIFY EXISTING DIMENSIONS, CONDITIONS, AND CLEARANCES PRIOR TO THE SUBMITTAL OF SHOP DRAWINGS.

WHERE WORK OCCURS IN AREAS WITH EXISTING FINISHES TO REMAIN, REFINISH DISTURBED AREAS TO MATCHEXISTING FINISHES AND MATERIALS U.N.O.

ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS WHERE INDICATED BY KEYED REFERENCE.LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.

PLAN DIMENSIONS ARE TO FINISHED FACE OF PARTITION EXCLUDING FINISH MATERIAL SUCH AS CERAMIC TILE,WOOD PANELING, ETC

PARTITION TYPES NOTED THUSLY: SEE SHEET X5 FOR DESCRIPTION OF PARTITION TYPES ANDOTHER INFORMATION.

WHERE NEW ROOMS ARE SCHEDULED WITHOUT CEILINGS, PARTITION SHALL EXTEND TO STRUCTURE ABOVE U.N.O..

VERIFY THE FOLLOWING WITH THE RESPECTIVE TRADES:A. SIZES AND LOCATIONS OF MECH. AND/OR ELEC. PENETRATIONS.B. LOCATIONS FOR BACKING/BLOCKING REQUIRED FOR MOUNTING MECH. AND/OR ELEC. EQUIPMENTC. CUTTING AND PATCHING FOR WORK REQUIRED BY MECH. AND/OR ELEC.

FOR TYPICAL MOUNTING HEIGHTS OF TOILET, BUILDING EQUIPMENT, AND ACCESSORIES, (SUCH AS PLUMBINGFIXTURES, FIRE EXTINGUISHER CABINETS, ELECTRICAL WATER COOLERS AND TOILET ACCESSORIES), SEE "TYPICALMOUNTING HEIGHTS" NOTES ON THIS SHEET.

THE FOLLOWING DIAGRAMS INDICATE HOW TO DIMENSIONALLY LOCATE METAL FRAMES U.N.O.

PROTECT AND PRESERVE ALL EXISTING ITEMS TO REMAIN AND REPAIR AND/OR REPLACE ANY ITEMS DAMAGEDDURING THE COURSE OF THE WORK TO THE SATISFACTION AND APPROVAL OF THE ARCHITECT WITHOUTADDITIONAL COST TO THE OWNER.

PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER INSTALLATION OF NEW WORK ITEMS ORITEMS TO BE REUSED.

SEE DOOR SCHEDULE ON A17 FOR SPECIFIC DOOR AND HARDWARE TYPES. SEE DRAWING A17 FOR INTERIORFRAME TYPES AND DOOR TYPE ELEVATIONS.

FURNITURE IS SHOWN ON THE PLANS FOR LOCATION AND DESIGN INTENT ONLY. FURNITURE IS N.IC. AND WILL BECOORDINATED AND PURCHASED BY OWNER.

ALL SLEEVES, OPENINGS, ETC. FOR CONDUIT, PIPES, DUCTS, ETC. (OUTSIDE OF RATED CHASES) THROUGH FLOORSLABS AND RATED PARTITIONS ARE TO BE FIRE SEALED IN ACCORDANCE WITH FIRE RATED ASSEMBLY DESIGNS,APPLICABLE CODES AND FIRE MARSHAL'S REQUIREMENTS.

WHERE CONDUIT, PIPES, DUCTS, ETC. ARE INDICATED TO BE INSTALLED IN EXISTING WALLS AND NO FURRING ISSHOWN, THE WALLS SHALL BE NEATLY CHASED, CONDUITS, ETC. INSTALLED, AND WALLS PATCHED TO MATCHEXISTING. IN AREAS OF NEW PARTITIONS WHERE CONDUITS, DUCTS, PIPING, ETC., PASS THROUGH FINISHEDSPACES, ENCLOSE WITHIN PARTITION CONSTRUCTION.

THE FACE OF EVERY CONTINUOUS PARTITION SHALL BE FLUSH WITHOUT OFFSET. CHANGES IN PARTITIONTHICKNESS SHALL OCCUR AT CORNERS OR OTHER FEATURES WHICH INTERRUPT THE PLANE OF THE PARTITION.FACES OF CORRIDOR PARTITIONS SHALL ALIGN ALONG THEIR ENTIRE LENGTH REGARDLESS OF CHANGES INPARTITION THICKNESS. ALL ADJUSTMENTS ARE TO BE MADE TO THE ROOM SIDE OF THE CORRIDOR PARTITIONS ANDAT CORNERS.

ALIGN FINISH FACE OF NEW PARTITION WHERE ABUITING EXISTING CONSTRUCTION U.N.O. ALIGN FINISH FACE ONNEW PARTITION ON BOTH SIDES WHERE ABUTTING EXTSTING PARTITION U.N.O.

SHOW NEW PARTITION AS REQUIRED TO ACHIEVE A FLUSH, SMOOTH TRANSITION.

ALL DEMOLITION AND NEW WORK TO BE DONE DURING SECOND SHIFT AND COORDINATED WITH THE COTR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

X

LINE FIGURED

5"

TYPICAL MOUNTING HEIGHTSTOILET FIXTURE AND ACCESSORIES

SYMBOLS INDICATION OFMATERIAL

A

B

C

D

E

G

H

I

J

KL

M

N

O

P

QR

S

T

U

V

W

Z

F

VA STANDARD SIGNAGE DETAILS

Page 3: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

F

F

S

F

S

F

F

S/S S/SS/S S/S

S/S

S/S

S/S

S/S

S/S S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

R

F

F

F

F

F

60

F

60

60

60

30

60

F

F

S

F

S

F

F

S/S S/SS/S S/S

S/S

S/S

S/S

S/S

S/S S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

R

F

F

F

F

F

60

F

60

60

60

30

60

F

F

S

F

S

F

F

S/S S/SS/S S/S

S/S

S/S

S/S

S/S

S/S S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

R

F

F

F

F

F

F

60 60

60

60

60

30

F

72' TRAVEL128' TRAVEL

106'

TRAV

EL

119'

TRAV

ELEXIT TOHOSPITAL

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

UPDN

EXISTING HOSPITAL

FEC

FEC

FHC

FHC

FEC

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

128' TRAVEL

119'

TRAV

EL

EXIT TOHOSPITAL

UPDN

EXISTING HOSPITAL

72' TRAVEL

106'

TRAV

EL

FEC

FEC

FHC

FHC

FEC

EXIT PATH

2-HOUR RATED WALL - EXISTING TO BE MAINTAINED

LEGEND

EXISTING WALL

NEW WALL

FIRE EXTINGUISHER CABINET

FIRE ALARM PULL SWITCH

CEILING MOUNTED FIRE ALARM/STROBE

WALL MOUNTED FIRE ALARM/STROBE

EXIT SIGN

S/S

F

F

S SMOKE DETECTOR

S R ELEVATOR RECALL SMOKE DETECTOR

FEC

FIRE HOSE CABINETFHC

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

LIFE

SAF

ETY

PLAN

S

X3

SCALE: 1/8" = 1'-0"X3

1 SECOND FLOOR LIFE SAFETY PLAN

GENERAL CODE REVIEW

SCALE: 1/8" = 1'-0"X3

2 FIFTH FLOOR LIFE SAFETY PLAN

KEY PLAN

BUILDING NO. 21

N

N

N

Page 4: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

PHASE 1E

ELEV.

3

PHASE 1C

ELEV.

3

PHASE 1D

ELEV.

3

12" X 12" WHITE, GRAYBEIGE, FLOOR TILE ANDASSOCIATED MASTIC(APPROXIMATELY 6176 SF)TO BE REMOVED

SEALED DUST AND DEBRISBARRIER

STICKY MAT

INGRESS/EGRESS

NO WORK AREA

LEGEND KEY NOTES1

2

ASBESTOS CONTAINING MATERIALS INCLUDEUNDER SINK COATINGS, TRANSITE FUME HOODS,AND EBONITE DRYER RACKS THROUGHOUT. REFERTO DRAWING 1/A1 AND 2/A1 FOR LOCATIONS

ASBESTOS TILE AND MASTIC TO BE REMOVED ASSHOWN

EXISTING CEILING ASSEMBLIES IN THIS PHASE ARETO BE REMOVED AND REINSTALLED AS REQUIREDTO ALLOW FOR DEMOLTIION OF EXISTING MEPSYSTEMS. REFER TO MEP DEMOLITION DRAWINGS.CEILING ASSEMBLIES ARE TO BE SALVAGED ANDREINSTALLED TO THE GREATEST DEGREEPOSSIBLE. THE CONTRACTOR MAY ELECT TOREPLACE WITH NEW TO MATCH EXISTING WHERESALVAGING IS NOT POSSIBLE OR PRUDENT.

3

PHASE 1F

ELEV.

PHASE 1A

2

1

PHASE 1B

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

PRO

POSE

D S

ECO

ND

FLO

OR

SEQ

UEN

CIN

G P

LAN

X4

PHASE 1E (FIRST FLOOR)

KEY PLAN

BUILDING NO. 21

N

1A REMOVE ASBESTOS MATERIAL FROM SECOND FLOOR

1B DEMO SECOND FLOOR

1C SELECTIVE DEMOLITION ABOVE FIRST FLOOR CEILING, PATCH AND FINISH

1D SELECTIVE DEMOLITION ABOVE FIRST FLOOR CEILING, PATCH AND FINISH

1E SELECTIVE DEMOLITION ABOVE FIRST FLOOR CEILING, PATCH AND FINISH

1F CONSTRUCT AND COMPLETE SECOND FLOOR (CONCURRENT WITH PHASES 3, 4 AND 5)

PHASE DESCRIPTION

PHASE 1C (FIRST FLOOR)

PHASE 1D (FIRST FLOOR) PHASE 1F (SECOND FLOOR)

PHASE 1A - ASBESTOS CONTAINMENT(SECOND FLOOR) PHASE 1B (SECOND FLOOR)

1. Obtain infection control permit before construction begins.

2. Physically isolate HVAC system in the area where renovation work is beingperformed; i.e. remove and cap ductwork leading to adjacent portions of thebuilding.

3. Erect barriers between all interior areas off the project area and adjacent areas.Barriers will be constructed from floor to deck using wood/metal wall studs anddrywall or equivalent sheeting. Barriers will be constructed to ensure a complete sealof the construction areas from adjacent areas. Walls shall be dustproof with sealsmaintained at the full perimeter which allow for minimization of dust collection and spread.Barriers shall remain in place until the project area is satisfactorily cleaned by the VA’sEnvironmental Services Department.

4. Maintain negative air pressure within the construction area utilizing HighEfficiency Particulate Air (HEPA) machines; a minimum of two (2) – 2,000 cubicfeet per minute (cfm) rated air handlers shall be utilized at all times and ventedto outside the building.

5. The contractor shall ensure that during demolition and the transport/loading ofconstruction debris, no visible emissions are generated. The contractor shallkeep all windows and doors to the project area closed, and utilize covered cartsduring transport of debris. If necessary, use wet methods during dumpingactivities to minimize visible emissions, i.e. wetting of debris prior to transferinto roll off dumpster or dump truck. During transport, all dumpsters or dumptrucks shall be satisfactorily covered to avoid wind agitation of constructiondebris.

6. The contractor shall collect and properly dispose of liquid drain sludgeencountered during the demolition of plumbing.

7. The contractor shall implement satisfactory fire watch or hot work permit systemfor all hot work activities; i.e. welding, burning, grinding, etc. Fire extinguishers shall beprovided by the contractor.

8. The project area shall be secured and monitored by the contractor during allconstruction activities to minimize access of unauthorized personnel.

9. Disruption of utilities shall be coordinated with site personnel to minimizeddisruption to adjacent areas.

10. Medical waste, mold, and asbestos containing materials (ACM) should not beencountered during construction activities. The contractor shall stop work andimmediately notify site personnel if suspicious medical waste, mold or ACM isobserved.

GENERAL NOTES

* ALL HAZARDOUS MATERIALS SHALL BE TRANSPORTED THROUGH THE ELEVATOR ANDTO THE FIRST FLOOR, THEN OUT OF THE BUILDING THROUGH MAILROOM A-113.

*ALL DEMOLITION MATERIALS AND CONSTRUCTION WASTE, EXCLUDING HAZARDOUSMATERIALS, SHALL BE TRANSPORTED THROUGH THE ELEVATOR AND TO THE FIRSTFLOOR, THEN OUT OF THE BUILDING THROUGH CORRIDOR A-127, ADJACENT TO EXITSTAIR.

*ALL DEMOLITION AND NEW WORK TO BE DONE DURING SECOND SHIFT ANDCOORDINATED WITH THE COTR.

Page 5: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

DNUP

DNUP DNUP DNUP

PHASE 2C

ELEV.3

PHASE 2D

ELEV.

3

PHASE 2E

ELEV.

3

PHASE 2F

ELEV.

3

PHASE 2A

2

1

PHASE 2G

ELEV.

12" X 12" WHITE, GRAYBEIGE, FLOOR TILE ANDASSOCIATED MASTIC(APPROXIMATELY 6176 SF)TO BE REMOVED

SEALED DUST AND DEBRISBARRIER

STICKY MAT

INGRESS/EGRESS

NO WORK AREA

LEGEND KEY NOTES1

2

ASBESTOS CONTAINING MATERIALS INCLUDEUNDER SINK COATINGS, TRANSITE FUME HOODS,AND EBONITE DRYER RACKS THROUGHOUT. REFERTO DRAWING 1/A1 AND 2/A1 FOR LOCATIONS

ASBESTOS TILE AND MASTIC TO BE REMOVED ASSHOWN

EXISTING CEILING ASSEMBLIES IN THIS PHASE ARETO BE REMOVED AND REINSTALLED AS REQUIREDTO ALLOW FOR DEMOLTIION OF EXISTING MEPSYSTEMS. REFER TO MEP DEMOLITION DRAWINGS.CEILING ASSEMBLIES ARE TO BE SALVAGED ANDREINSTALLED TO THE GREATEST DEGREEPOSSIBLE. THE CONTRACTOR MAY ELECT TOREPLACE WITH NEW TO MATCH EXISTING WHERESALVAGING IS NOT POSSIBLE OR PRUDENT.

3

PHASE 2B

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

NORTH

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

PRO

POSE

D F

IFTH

FLO

OR

SEQ

UEN

CIN

G P

LAN

X5

PHASE 2C (FOURTH FLOOR)

PHASE 2D (FOURTH FLOOR)

PHASE 2E (FOURTH FLOOR) PHASE 2F (FOURTH FLOOR)

PHASE 2A - FIFTH FLOOR ASBESTOSCONTAINMENT

PHASE 13 (FIFTH FLOOR)

KEY PLAN

BUILDING NO. 21

N

2A REMOVE ASBESTOS MATERIAL FROM FIFTH FLOOR

2B DEMO FIFTH FLOOR

2C SELECTIVE DEMOLITION ABOVE FOURTH FLOOR CEILING, PATCH AND FINISH

2D SELECTIVE DEMOLITION ABOVE FOURTH FLOOR CEILING, PATCH AND FINISH

2E SELECTIVE DEMOLITION ABOVE FOURTH FLOOR CEILING, PATCH AND FINISH

2F SELECTIVE DEMOLITION ABOVE FOURTH FLOOR CEILING, PATCH AND FINISH

2G CONSTRUCT AND COMPLETE FIFTH FLOOR (CONCURRENT WITH PHASES 9-12)

PHASE DESCRIPTION

* ALL HAZARDOUS MATERIALS SHALL BE TRANSPORTED THROUGH THE ELEVATOR ANDTO THE FIRST FLOOR, THEN OUT OF THE BUILDING THROUGH MAILROOM A-113.

*ALL DEMOLITION MATERIALS AND CONSTRUCTION WASTE, EXCLUDING HAZARDOUSMATERIALS, SHALL BE TRANSPORTED THROUGH THE ELEVATOR AND TO THE FIRSTFLOOR, THEN OUT OF THE BUILDING THROUGH CORRIDOR A-127, ADJACENT TO EXITSTAIR.

*ALL DEMOLITION AND NEW WORK TO BE DONE DURING SECOND SHIFT ANDCOORDINATED WITH THE COTR.

PHASE 2B (FIFTH FLOOR)

Page 6: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

1

2

2

2

1

4

3

3

3

4

3

6

+80'-11"EXISTING +79'-9"

EXISTING

± 1'-10"

7

8

7

± 1'-10"

1111

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

5

4

4

4

6

9

10

10

1111

12

LEGEND

EXISTING WALL TO REMAIN

EXISTING STUD AND PLASTER WALL TO BE REMOVED

EXISTING DOOR AND FRAME ASSEMBLYTO BE REMOVED

EXISTING CASEWORK ASSEMBLY TO BE REMOVED(ASSEMBLY INCLUDES ASBESTOS UNDER SINKCOATINGS AND EBONITE DRYER RACKS)

EXISTING TRANSITE FUME HOOD ASSEMBLY TOBE REMOVED (ASSEMBLY CONTAINS ASBESTOS)

EXISTING BIOLOGICAL SAFETYCABINET ASSEMBLY TO BE REMOVED

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

DEM

OLI

TIO

N P

LAN

S

A1

SCALE: 1/8" = 1'-0"A1

1 SECOND FLOOR DEMOLITION PLANSCALE: 1/8" = 1'-0"A1

2 FIFTH FLOOR DEMOLITION PLAN

GENERAL NOTESREMOVE ALL EXISTING FLOORING FINISHES AND BASES, PREP AS REQUIRED TORECIEVE NEW FINISH

REMOVE ALL ACCESSORIES INCLUDING WALL PROJECTIONS & CORNER GUARDS.

WALLS TO BE DEMOLISHED ARE METAL STUD AND GWB CONSTRUCTION UNLESSNOTED OTHERWISE.

REMOVE EXISTING WINDOW STOOLS AND PREP AS REQUIRED FOR NEW STOOLS TOBE INSTALLED.

KEY PLAN

BUILDING NO. 21

N

KEY NOTESREMOVE EXISTING LEAD LINED WALL - SEE DETAIL A/A1

REMOVE EXISTING LEAD LINED WOOD DOOR AND FRAME ASSEMBLY -SEE DETAIL B/A1

REMOVE PLYWOOD AT EXISTING ALUMINUM WINDOW ASSEMBLY AND PREPOPENING TO RECIEVE NEW INSULATED GLASS UNIT TO MATCH ADJACENTWINDOWS

REMOVE ALL TILE WAINSCOTING, CERAMIC TILE, BATHROOM PARTITIONSAND ACCESSORIES

REMOVE EXISTING METAL LOCKERS

REMOVE EXISTING MOP SINK

REMOVE ±6" EXISTING LIGHTWEIGHT CONCRETE FILL - COORDINATE WITHRAMP AND OFFICE LAYOUT ON 1/A3.

REMOVE EXISTING LIGHTWEIGHT CONCRETE FILL RAMP (SLOPING FROM 0"TO ±14" AT CONNECTION TO EXISTING HOSPITAL)

RE-ROUTE EXISTING DUCT, REFER TO MECHANICAL DRAWINGS H-7 AND H-13.PATCH HOLE IN FLOOR TO MATCH EXISTING.

PRE=FABRICATED ROOM TO BE DEMOLISHED.

REMOVE EXISTING SHAFT DOORS AND PATCH WALL TO MATCH EXISTING.

PROVIDE FLOOR PENETRATION FOR DUCT, REFER TO MECHANICALDRAWING H13

1

2

3

4

5

NN

6

A

A1

LINED WALL DETAILN.T.S. - FOR REFERENCE ONLY

B

A1

LINED DOOR FRAME DETAILN.T.S. - FOR REFERENCE ONLY

7

8

9

10

11

1.

2.

3.

4.

EXISTING ORIGINAL LEADEXISTING ORIGINAL LEAD

12

Page 7: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

1

1

2

3

LEGEND

EXISTING WALL TO REMAIN

EXISTING WALL TO BE REMOVED

EXISTING 2x4 ACT ASSEMBLYTO BE REMOVED

EXISTING 2x2 ACT ASSEMBLYTO BE REMOVED

EXISTING GWB CEILING ASSEMBLYTO BE REMOVED

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

DEM

OLI

TIO

N R

EFLE

CTE

D C

EILI

NG

PLAN

S

A2

SCALE: 1/8" = 1'-0"A2

1 SECOND FLOOR RCP DEMOLITIONSCALE: 1/8" = 1'-0"A2

2 FIFTH FLOOR RCP DEMOLITION

KEY PLAN

BUILDING NO. 21

N

NN

DEMOLISH CEILING OF PRE-FABRICATED ROOM

EXISTING CEILING MOUNTED PROJECTOR TO BE REMOVED

EXISTING CHANGE IN CEILING HEIGHT TO BE REMOVED

1

2

KEY NOTES

GENERAL NOTESREMOVE ALL EXISTING CEILING ASSEMBLIES AND BULKHEADS

REFER TO MECHANICAL DEMOLITION DRAWINGS H3, H4, H7 AND H8 FOR DIFFUSERAND GRILL LOCATIONS

REFER TO ELECTRICAL DEMOLITION DRAWINGS E2 AND E3 FOR LIGHT FIXTURELOCATIONS

1.

2.

3.

3

Page 8: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

Equipment RoomNo. 1A208

Open LabA222

Radioactive PrepRoomA202

Animal RoomA203

Imaging RoomA203A

Animal RecoveryRoomA203B

Open LabA218

Instrument RoomA206

PI OfficeA214

PI OfficeA215

PI OfficeA216

PI OfficeA213 Cold Storage

RoomA209

Tissue CultureAnteroom

A207

Equipment RoomNo. 2A205

Tissue CultureA207B

Tissue CultureA207A

Post DocWorkstations

A217

Swing Lab No. 1A210

PI OfficeA212

handwashsink

1208

2208

2206

1222

1202

1C2-1

1214

1215

1216

1213

1211

1207B

1207

1205

1207A

1203

1217

1212

1210

1218

2218

1206

UPDN

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

LobbyC2-1

HACA201

Women's ToiletA219

ElecA223

DataA221

Stair 7ST 7-2

2222A15

1

1 1

1

8

7

1

1

1

1

1

1

1

1

1

1

1

1 1 1

1

7

1

1

1

11

1

1

1 11

1

1

66

66

66

666 6

6

6

5

5

2

22 3

3

Men's ToiletA220

1203B

1203A

2202

3202

CorridorC2-2

CorridorC2-3

4'-6"

4

1

1

1

A1514

33

1220

1219

2223

16A15

A1515

17A15

18A15

2

A9

1

A910 11

3

A9

5

6

9'-11 1/4" 10'-1 1/2" 10'-4 3/4" 12'-8" 40'-5" 27'-3 1/2"

7'-3 3/4" 5'-8 1/4" 7'-0"

6'-7 1/2"

9'-11 1/4" 10'-1 1/2" 9'-6" 10'-7 3/4" 9'-5"2'-0 1/2"

6'-0"

20'-9

1/2

"19

'-4 1

/2"

20'-3

"12

'-9 1

/4"

6'-4

1/2"

20'-5

"

ALIGNALIGN

10'-2 3/4" 10'-5 1/2" 18'-0 1/4" 3'-8 1/4" 9'-4 3/4" 28'-2"

9'-7"

ALIG

N

4

1ST 7-2

1223

3

3

33

3

3

3

3

3

5

5

5

+80'-11" +80'-8 1/2" +80'-4 "

+80'-0 1/2"

+79'-9"

4'-3" 4'-0" 7'-6" 4'-0"

SLOPE SLOPE SLOPE SLOPE

11

1111

9

10

6

6

6

6

6

6

6

7

1

66 56

171

6

10

A9 7

20'-9

1/4

"6'-

0"12

'-11

3/4"

10'-4

3/4

"20

'-0"

20'-2

1/2

"9'-

7 1/

4"

14'-4

1/4

"14

'-4 1

/4"

3'-7

1/4"

20'-9

1/4

"6'-

7 1/

2"12

'-3 1

/4"

9'-11

3/4

"10

'-4 1

/2"

13'-2

"6'-

0 1/

4"1'-

7 3/

4"3'-

10 3

/4"

7'-2

1/2"

7'-2

1/2"

10'-7 1/2" 10'-1 3/4" 6'-5" 25'-10 3/4" 26'-10 1/4"

1'-5"

1'-5"

ALIG

N

2'-3"

1'-3"

7'-8"1'-11 1/4"

7'-10"

3

1C2-3

1:20 MAX 1:20 MAX 1:20 MAX 1:20 MAXSLOPE1:48 MAX

12

13 13

CLEAR6'-0"

8 8

ALIGN W/ CORRIDOR6'-0" 1'-2"

INSIDE CLEAR11'-11 3/4"

ALIGNW/ BENCH

A1511

A99

C.G.

C.G.

C.G. C.G.

C.G.

C.G.C.G.

C.G. C.G.

C.G.

C.G.C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

+80'-8 1/2"(+80'-3" EXISTING)

+80'-8 1/2"

+80'-4 "(+80'-3" EXISTING)

+80'-4 "(+80'-3" EXISTING)

+80'-0 1/2"(+79'-9" EXISTING)

+80'-0 1/2"(+79'-9" EXISTING)

2

2

1221

1201

15 15 15

151515

4

4

14

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

SEC

ON

D F

LOO

R N

EW W

OR

K PL

AN

A3SCALE: 1/4" = 1'-0"A3

1 SECOND FLOOR NEW WORKN

KEY NOTES

PROVIDE AND INSTALL NEW INSULATED GLASS UNIT IN EXISTING ALUMINUM WINDOWASSEMBLY, TO MATCH EXISTING

FIRE EXTINGUISHER CABINET

INTEGRATED CARD SWIPE AND ELECTRIC STRIKE FOR DOOR

EXISTING FIRE HOSE CABINET LOCATION. REMOVE EXISTING CABINET AND PROVIDE ANDINSTALL NEW

FLUSH MOUNTED ELECTRICAL PANEL

LABORATORY BENCH AND CASEWORK, SEE SHEETS A7, A8, AND A10-14 FOR DETAILS.

PRE-MANUFACTURED COLD ROOM

INFILL EXISTING DOOR OPENING

PROVIDE 1/8" LEAD SHIELDING TO A HEIGHT OF 10'-0" A.F.F. SEE DOOR SCHEDULE FORDOOR AND FRAME REQUREMENTS.

PROVIDE AN ADDITIONAL 1/16" LEAD SHIEDLING ON WALLS TO A HEIGHT OF 10'-0" A.F.F.(3/16" TOTAL). SEE DOOR SCHEDULE FOR DOOR AND FRAME REQUIREMENTS. INADDITION, INSTALL 1/16" LEAD AND OVERLAP IT AT LEAST 2" WITH THE LEAD IN THE 2SIDEWALLS AND BACK WALL SHARED WITH STAIRWELL.

PROVIDE 1/16" LEAD SHIELDING TO A HEIGHT OF 8'-0" A.F.F. SEE DOOR SCHEDULE FORDOOR AND FRAME REQUIREMENTS.

PROVIDE ADA COMPLIANT AUTOMATIC DOOR OPENER AND ACTIVATOR AT EXISTING PAIROF DOORS

PROVIDE TRIM CLOSURE TO MATCH COLD STORAGE ROOM EXTERIOR SKIN.

PROVIDE AND INSTALL NEW RAMP AND LANDINGS AS SHOWN. SEE 1/A9, 3/A9

PROVIDE FINISH FLOORS AT HEIGHTS SHOWN

1

2

GENERAL NOTES1. SEE DRAWING A-7 FOR EQUIPMENT LAYOUT

3

4

5

6

7

8

9

10

11

12

13

14

15

Page 9: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

Equipment RoomNo. 1A508

Open LabA522

Conference RoomA502

PI OfficeA514

PI OfficeA515

PI OfficeA516

PI OfficeA513

Work RoomA511

Cold LabA509

Tissue CultureAnteroom

A507

Equipment RoomNo. 2A505

Tissue CultureA507B

Tissue CultureA507A

Swing Lab No. 2A503

Open LabA518

Post DocWorkstations

A517

Swing Lab No. 1A510

Glassware WashRoomA504

PI OfficeA512

Equipment RoomNo. 3

A503A

Instrument RoomA506

Shaft

Shaft

handwashsink

1516

1508

2508

2506

2522

1502

1C5-1

1514

1515

1513

1511

1507B

1507

1505

1507A

1517

1512

1510

1518

2518

1503A

1504

1506

Shaft

Shaft

1ST 7-5

UPDN

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

Women's ToiletA519

Elec.A523

DataA521

Stair 7ST 7-5

LobbyC5-1

1522

1 1

1

1

7

1

1

1

1

1

1

1

1

1

1 1

1

1

1 1 1 1

1

7

1

1

1

1

1

1

1

1 17

171

1

1

66

66

66

666 6

6

66 6

65

5

5

2

2

3

1520

Men's ToiletA520

CorridorC5-3

CorridorC5-2

11

11

23

3

3

1503

A1520 1

A9

12

13

3

3

3

33

3

4

5

5

5

1519

2523

1523

6

6

6

6

6

66

7

88

3

3

3

5" 10'-4 1/4" 10'-1 1/2" 10'-4 3/4" 12'-8 1/4" 40'-5" 26'-10 1/4"

5" 10'-4 1/4" 10'-1 1/2" 9'-6" 10'-5" 9'-9 1/2" 1'-6 1/4" 5'-11 1/2" 1'-11" 7'-4" 1'-11 1/4" 7'-10" 7'-3 3/4" 4'-6" 22'-4 1/4"

14'-4

1/4

"6'-

0"14

'-4 1

/4"

17'-4

"12

'-6"

20'-0

"10

'-4 3

/4"

12'-6

1/2

"6'-

5"20

'-9 1

/4"

6'-11 1/2" 4"

3'-7

1/2"

26'-9 1/2" 15'-7 3/4" 9'-4 1/2" 28'-1 3/4"

ALIGNALIGN

ALIG

N

10'-7 3/4" 10'-1 3/4" 6'-5" 25'-11" 26'-10 1/4"

19'-1

1 3/

4"6'-

0"13

'-2"

10'-4

3/4

"9'-

11 1

/2"

4'-9

1/4"

8'-1

1/2"

6'-9

3/4"

19'-1

1 1/

2"

10'-0

"

20'-1

0"6'-

4 1/

2"12

'-4 1

/4"

20'-7

1/2

"19

'-4 3

/4"

20'-4

1/2

"

1C5-3

ALIGN W/ CORRIDOR6'-0" 1'-2"

INSIDE CLEAR11'-11 3/4"

ALIGNW/ BENCH

A151913

21A15

22A15

23A15

16

17

18

A152415

9

9

C.G.

C.G.

C.G. C.G.

C.G.

C.G. C.G.

C.G. C.G.

C.G.

C.G. C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

C.G.

11

2

1501

1521

4

4

10

10 10 10

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

FIFT

H F

LOO

R N

EW W

OR

K PL

AN

A4SCALE: 1/4" = 1'-0"A4

1 FIFTH FLOOR NEW WORKN

KEY NOTES(NOT USED)

EXISTING FIRE HOSE CABINET LOCATION. REMOVE EXISTING CABINET AND PROVIDEAND INSTALL NEW.

INTEGRATED CARD SWIPE AND ELECTRIC STRIKE FOR DOOR

PATCH HOLE IN FLOOR FROM DUCT RE-ROUTING TO MATCH EXISTING

FLUSH MOUNTED ELECTRICAL PANEL

LABORATORY BENCH AND CASEWORK, SEE SHEETS A7, A8 AND A10-14 FORDETAILS.

PRE-MANUFACTURED COLD ROOM

INFILL DOOR WITH NEW WALL TO MATCH ADJACENT EXISTING WALL

PROVIDE TRIM CLOSURE TO MATCH COLD STORAGE ROOM EXTERIOR SKIN

PROVIDE BLOCKING AS REQUIRED FOR MOUNTING MAGNETIC GLASSMARKERBOARD.

FIRE EXTINGUISHER CABINET

1

2

GENERAL NOTES1. SEE DRAWING A-8 FOR EQUIPMENT LEGEND AND LAYOUT

3

4

5

6

7

8

9

10

11

Page 10: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

CLG

. HT. -

8'-0

"

CLG. HT. - 8'-0"

CLG. HT. - 8'-0"

CLG. HT. - 8'-0"

CLG. HT. - 8'-0"

CLG

. HT. -

9'-0

"

A

A

A

A

A

A

A A

A

A

3

4

5

6

CLG. HT. - 7'-8"

1'-0"

1'-0"

S/S S/P

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/PS/PS/P

S/P

S/P S/S

S/S S/P

LEGEND

GWB CEILING

DIFFUSERS

EXHAUST GRILL

2x4 LIGHT FIXTURE

1x4 LIGHT FIXTURE

9"x4 LIGHT FIXTURE

RECESSED LIGHT FIXTURE

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

ACCESS PANEL

LINEAR DIFFUSER

A

KEY NOTES(NOT USED)

(NOT USED)

RECESSED LIGHTING - SEE DETAIL 16/A15

RECESSED LIGHTING - SEE DETAIL 17/A15

COLD LAB PRE-FABRICATED CEILING

2" THICK FREE FLOATING DRYWALL CEILING PANEL WITH DRYWALL BOTTOM TRIM.PROVIDE +/- 12" OVERLAP OF ACT AND GWB.

1

2

GENERAL NOTESALL CEILING HEIGHTS TO BE 9'-0" UNLESS NOTED OTHERWISE

3

4

5

6

EXIT SIGN

S/S

S/P PAGER SPEAKER

SPEAKER STROBE

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

NORTH

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

SEC

ON

D F

LOO

R R

EFLE

CTE

DC

EILI

NG

PLA

N

A5SCALE: 1/4" = 1'-0"A5

1

SECOND FLOOR REFLECTED CEILINGPLAN

Page 11: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

CLG. HT. - 8'-0" CLG. HT. - 8'-0"

CLG. HT. - 8'-0"

CLG. HT. - 8'-0"

CLG. HT. - 8'-0"

A

A

A

A

A

3

4

5

6

CLG. HT. - 7'-8"

21A15

22A15

23A15

1'-0"

1'-0"

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/P

S/PS/PS/P

S/P

S/P S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/S

S/P

LEGEND

GWB CEILING

DIFFUSERS

EXHAUST GRILL

2x4 LIGHT FIXTURE

1x4 LIGHT FIXTURE

9"x4 LIGHT FIXTURE

RECESSED LIGHT FIXTURE

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

ACCESS PANEL

LINEAR DIFFUSER

A

KEY NOTES(NOT USED)

(NOT USED)

RECESSED LIGHTING - SEE DETAIL 16/A15

RECESSED LIGHTING - SEE DETAIL 17/A15

COLD LAB PRE-FABRICATED CEILING

2" THICK FREE FLOATING DRYWALL CEILING PANEL WITH DRYWALL BOTTOM TRIM.PROVIDE +/- 12" OVERLAP OF ACT AND GWB.

1

2

GENERAL NOTESALL CEILING HEIGHTS TO BE 9'-0" UNLESS NOTED OTHERWISE

3

4

5

6

EXIT SIGN

S/S

S/P PAGER SPEAKER

SPEAKER STROBE

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

NORTH

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions MJS

AHK

August 8, 2011

642-10-160

FIFT

H F

LOO

R R

EFLE

CTE

DC

EILI

NG

PLA

N

A6SCALE: 1/4" = 1'-0"A6

1 FIFTH FLOOR REFLECTED CEILING PLAN

Page 12: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

casework typical

exhaust enclosuretypical

equipment/cabinets/instruments - typical

18" deepadjustableshelving(full height)

18" deepadjustableshelving(full height)

cylinders

cylinders

adjustable shelving

sit-down stations -typical

4' mobile instrumentbench (MIB)

4' MIB 3' MIB

4' MIB 3' MIB

4' MIB

4' MIB

Elevator

ShaftShaft Shaft

Shaft

6' BSC (Class II-B2);LA, LV, G

6' FH ADA;LA, LV, G, CSK, CW

5' FH;LA, LV, G, CSK, CW

6' BSC (Class II-A2);LA, LV, G

6' FH ADA;LA, LV, G, CSK, CW

6' BSC (Class II-B2);LA, LV, G

emergency shower andeyewash (ESEW)

ADA sink, HW, CW, EW

sink, HW, CW, eyewash(EW) typical

ADA sink,HW, CW, EW

sink, HW, CW,eyewash (EW) typical

scintillation counter

sit-down stations -typical

Equipment RoomNo. 1A208

Open LabA222

Radioactive PrepRoomA202

Animal RoomA203

Imaging RoomA203A

Animal RecoveryRoomA203B

Open LabA218

Instrument RoomA206

PI OfficeA214

PI OfficeA215

PI OfficeA216

PI OfficeA213 Cold Storage

RoomA209

Tissue CultureAnteroom

A207

Equipment RoomNo. 2A205

Tissue CultureA207B

Tissue CultureA207A

Post DocWorkstations

A217

Swing Lab No. 1A210

PI OfficeA212

LobbyC2-1

HACA201

Women's ToiletA219

ElecA223

DataA221

Stair 7ST 7-2

Men's ToiletA220

A10

10

1 2 3 4 5 6

F

E

D

C

B

A

C.9

D.7

E.8

A126

5

A12 23

A1122

4' FH Radioisotope;LA, LV, G

7

8

12" deepadjustableshelving(full height)

TYPE 1

TYPE 3

TYPE 1

TYPE 1

TYPE 1

TYPE 1

TYPE 3

TYPE 2TYPE 2

TYPE 2

TYPE 2

EQ1.02.101

TU 7230XX

TU 6030XX

EQ1.02.102EQ1.02.101

EQ1.06.101

EQ1.06.102

EQ3.01.102

EQ3.01.101

EQ3.01.104EQ3.01.103

EQ3.01.104

EQ1.0

6.103

EQ1.0

6.104

EQ3.02.101 EQ3.03.101

EQUIPMENT ZONE

EQUIPMENT ZONE

EQ3.04.101

EQ3.05.101

EQ3.06.101EQUIPMENT ZONE

EQ3.07.101

EQ3.07.102

EQ1.01.101 EQ1.02.105

EQ1.01.102

ESEW

ESEW

EQ1.01.103

EQ1.02.106

EQ1.01.104

EQ1.02.107

ESEW

EQUIPMENT ZONEEQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

4' MIB

EQ3.02.103

LALGLV

LA

EQUIPMENT ZONE

?

?

6' BSC (Class II-A2);LA, LV, G

A10

20

21

A10 1913 A1018 17 A1016 15 A1014 12

A10

11

A1022

A1023

A10

6

A10

5

4

A10

3

2

A10

G, LA, LV - typical1

8

A10 7

A114 4A112 1

A11

5

6

A11 7

A11

9

EQUIPMENT ZONE

6' BSC (Class II-B2);LA, LV, G

LA, LV, G

G, LA, LV- typical

LA, LV, G

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

NORTH

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

SEC

ON

D F

LOO

REQ

UIP

MEN

T/C

ASEW

OR

K PL

AN

A7SCALE: 1/4" = 1'-0"1

SECOND FLOOR EQUIPMENT ANDCASEWORK PLAN

Page 13: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

A11

17

16

A118

A11

6

A10 12

5

casework typical

equipment/cabinets/instruments - typical

Elevator

Stair

exhaust enclosuretypical

18" deepadjustableshelving(full height)

cylinders

18" deepadjustableshelving(full height) new door

cylinders

6' BSC (Class II-B2);LA, LV, G

6' FH ADA;LA, LV, G, CSK, CW

adjustable shelving

sit-down stations -typical

4' mobile instrumentbench (MIB)

4' MIB 3' MIB

4' MIB 3' MIB

4' MIB

4' MIB 4' MIB

ShaftShaft Shaft

ShaftA11 3

A10 7

6' BSC (Class II-B2);LA, LV, G

5' FH;LA, LV, G, CSK, CW

6' FH ADA;LA, LV, G, CSK, CW

6' BSC (Class II-B2);LA, LV, G

ADA sink, HW, CW, EW

sink, HW, CW, eyewash(EW) typical

ADA sink,HW, CW, EW

sit-down stations -typical

sink, HW, CW,eyewash (EW) typical

sit-downstations

Equipment RoomNo. 1A508

Open LabA522

Conference RoomA502

PI OfficeA514

PI OfficeA515

PI OfficeA516

PI OfficeA513

Work RoomA511

Cold LabA509

Tissue CultureAnteroom

A507

Equipment RoomNo. 2A505

Tissue CultureA507B

Tissue CultureA507A

Swing Lab No. 2A503

Open LabA518

Post DocWorkstations

A517

Swing Lab No. 1A510

Glassware WashRoomA504

PI OfficeA512

Equipment RoomNo. 3

A503A

Instrument RoomA506

Women's ToiletA519 Elec.

A523

DataA521

Stair 7ST 7-5

LobbyC5-1

Men's ToiletA520

6'-0"

7

A10

1

A10

2

A10

5

A10

6

3

4

8

A10

11

14A10 1516

A10 1718

A1013

A10

20

21

A1022

A10

9

1 2 3 4 5 6

F

E

D

C

B

A

C.9

D.7

E.8

G, LA, LV- typical

19

A11

9

A11

14

15

4A11 12

A1023

TYPE 1TYPE 3

TYPE 2

TYPE 2

TYPE 2

TYPE 1TYPE 3

TYPE 1

TYPE 1

TYPE 1

TYPE 1

EQ1.04.102

EQ1.06.105

EQ1.06.106

EQ3.01.106

EQ3.01.105

EQ1.0

6.107

EQ1.0

6.108

EQ3.01.108

EQ3.01.107

ESEW

EQ1.02.114

EQ1.01.107

EQUIPMENT ZONEEQUIPMENT ZONE

ESEW

EQ1.02.113

EQ1.01.106

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQ1.02.110

EQ1.02.108 EQ1.02.109

EQ1.02.111

EQ3.02.102 EQ3.03.102

EQUIPMENT ZONE

EQUIPMENT ZONE

EQ1.03.101

EQ1.05.101

EQ3.08.101

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQUIPMENT ZONE

EQ1.02.112

EQ1.01.105

ESEW

ESEW

TU 7230XX

TU 6030XX

GC2 LVGC2 LAGC2 G

GC2 LV

GC2 GGC2 LA

GC2 LV

GC2 GGC2 LA

LALGLV

LA

LA

Canopy Hood, SeeMechanical Dwgs.

EQUIPMENT ZONE

6' BSC (Class II-A2);LA, LV, G

6' BSC (Class II-A2);LA, LV, G

LA, LV, G

G, LA, LV- typical

LA, LV, G

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

NORTH

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

FIFT

H F

LOO

REQ

UIP

MEN

T/C

ASEW

OR

K PL

AN

A8SCALE: 1/4" = 1'-0"1

FIFTH FLOOR CASEWORK ANDEQUIPMENT PLAN

Page 14: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

SECOND FLOOR79' - 9"

3RD FLOOR91' - 9"

2ND FLOOR79' - 9"

3RD FLOOR91' - 9"

SECOND FLOOR79' - 9"

16A15

2A9

4A9

AUTOMATIC DOOROPENER PUSH BUTTON

FIRE HOSECABINET, E.T.R.

VA STANDARDSIGNAGE, SEEDETAIL ON X2, TYP.

4" RUBBER BASE

FIRE EXTINGUISHER CABINET

TACKBOARD SURFACEPROVIDE LEVEL5 GWB FINISHTHIS AREA

PROVIDE AUTOMATICDOOR HARDWAREASSEMBLY

B.O.D.91' - 1"

CARD READER

PROVIDELEVEL 5 FINISHAT GWB THISAREA

SEE DETAIL16/A15

8"11

'-4"

SECOND FLOOR79' - 9"

3RD FLOOR91' - 9"

2ND FLOOR79' - 9"

3RD FLOOR91' - 9"

SECOND FLOOR79' - 9"

FIRE EXTINGUISHER CABINET

LIGHTWEIGHTCONCRETE FILL

METAL STUDAND GWBBULKHEAD

VA STANDARD SIGNAGE, SEE DETAIL ON X2

EXISTING DOOR AND FRAME ASSEMBLY

4"

WOOD FRAMINGWITH 2 LAYERSOF 5/8" T & GSHEATHING

PROVIDE AUTOMATIC DOOR HARDWARE ASSEMBLY

LOCKERS

B.O.D.91' - 1"

CARD READER

18A15

COLOR B

COLOR A

COLOR C

8"11

'-4"

CARD READER

VA STANDARDSIGNAGE

FIRE HOSECABINET, E.T.R.

FIFTH FLOOR115' - 9"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

MAGNETIC GLASSMARKERBOARD ANDPROJECTIONSURFACE, PROVIDEBLOCKING AT WALL

ALUMINUM INTEGRATEDREVEAL WITH CHARTRAILINSERT, SEE DETAIL 9/A9

5'-0"

4'-0"

3'-6"

FRAME FLOOR ASREQUIRED TO ACHEIVENECESSARY FLOOR DEPTH,SEE PLAN A3 FORELEVATIONS

4" RUBBER BASENEW EPOXY RESINWINDOW STOOL

COLOREDMAGNETIC GLASS,PROVIDE BLOCKINGAT ENTIRE WALL

ALUMINUM INTEGRATEDREVEAL TRIM WITHCHARTRAIL INSERT, SEEDETAIL 8/A9

2'-6"

4"

4'-6" 4'-6"

5/8" GWB

1/2" PLYWOOD BACKER

ALUMINUM EDGE PIECE, FRYREGLET #DRMZ-625-625 OR

APPROVED EQUAL

1/4 TACK BOARD

ACOUSTICAL CEILING TILE GRID

ACOUSTICAL CEILING TILE

METAL STUD

RUBBER BASE

5/8" GWB

ALUMINUM EDGE PIECE, FRYREGLET #DRMZ-625-625 OR

APPROVED EQUAL

1/4" TACK BOARD

1/2" PLYWOOD BACKER

METAL STUD

3/16" W X 1/2" DCURF CUT

1'-0"1 1/4"

A916

EPOXY RESIN BENCH TO MATCHLABORATORY COUNTERTOPS

RECESS FOR LIGHT ABOVE

1"

1/2" RADIUSCORNER, TYP.

2" CHARTRAIL INSERT

ALUMINUM INTEGRATEDFUNCTION REVEAL RAIL, FRYREGLET OR APPROVED EQUAL

3 3/4"2"

5/8"

RUBBER GASKET

2 1/4"

4"MAGNETIC GLASS MARKERBOARD MOUNTED ON Z CLIPS

AXONOMETRIC VIEW

CORNERGUARD1 1/4"

1 1/

4"

CORNER TRIM, FRY REGLET#DMCT-1250 OR APPROVEDEQUAL

OVERHANG

1"

+/- 3/16" W X 1/2" DEEP CURF CUTBENCH TOP

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

INTE

RIO

R E

LEVA

TIO

NS

A9

SCALE: 1/4" = 1'-0"A9

1 CORRIDOR C2-3 - NORTH

SCALE: 1/4" = 1'-0"A9

11 CORRIDOR C2-2 AND C5-2 - EAST

SCALE: 1/4" = 1'-0"A9

3 CORRIDOR C2-3 SOUTH

SCALE: 1/4" = 1'-0"A9

10 CORRIDOR C2-2 AND C5-2 - WEST

SCALE: 1/4" = 1'-0"A9

5 LOBBY - SOUTHSCALE: 1/4" = 1'-0"A9

6 LOBBY - NORTH

SCALE: 1/4" = 1'-0"A9

12 CONFERENCE ROOM - NORTHSCALE: 1/4" = 1'-0"A9

13 CONFERENCE ROOM - SOUTH

SCALE: 1/4" = 1'-0"A9

7 TYPICAL OFFICE ELEVATION

SCALE: 3" = 1'-0"A9

2 TACKBOARD TOP

SCALE: 3" = 1'-0"A9

4 TACKBOARD BASE

SCALE: 1" = 1'-0"A9

9 DETAIL AT BENCH TOPSCALE: 3" = 1'-0"A9

8

ALUMINUM INTEGRATED REVEAL WITHCHARTRAIL INSERT

SCALE: 12" = 1'-0"A9

16 CORNER DETAIL AT BENCH TOP

Page 15: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

G, LA, LV

KS 422230

SC 12

BB 302233BB 302233BE 182233

BD 182233

SC 24

WC 301331 WC 361331 WC 411331

SR

FILLER

TL 21 TL 21 TL 21

WC 241331SLOPED TOP

MOBILE INSTRUMENT BENCHES

TL 10

7A13

7A13

3A13

3A13

4A13

4A13

LA, LV, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

MOBILE INSTRUMENT BENCHES

SC 12

SC 24

KS 422230 BB 302233 BB 302233BE 182233

BD 182233

WC 301331WC 361331WC 411331

SR TL 21TL 21TL 21

WC 241331

SLOPED TOP

TL 10LV, LA, G

7A13

7A13

3A13

3A13

4A13

4A13

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

LALVGCSKCW

FIFTH FLOOR115' - 9"

G, LA, LV

6LF ADA FUMEHOOD

BA 101635KS 422230

SC 12

BB 362235BB 422235BE 182235

BD 182235

SC 24

WC 361331WC 361331 WC 361331 WC 411331

SR TL 21TL 21 TL 21 TL 21

SLOPED TOP

BS 122233

BNM 302328

BB 122233FHS 482934FILLER

EQ1.01.105

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"BA 101635

SC 12

SC 24

KS 422230

WC 411331

TL 21

BB 362235 BB 422235BE 182235

BD 182235

WC 361331WC 361331

SRTL 21 TL 21TL 21

WC 361331

SLOPED TOP

FILLER

LV, LA, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"KS 422230

SC 12

BB 302235BB 302235BE 182235

BD 182235

SC 24

WC 301331WC 241331 WC 361331 WC 411331

SRTL 21TL 21 TL 21

SLOPED TOP

TL 10G, LA, LV

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

SC 12

SC 24

KS 422230 BB 302235 BB 302235BE 182235

BD 182235

WC 301331 WC 241331WC 361331WC 411331

SRTL 21 TL 21TL 21

SLOPED TOP

TL 10LV, LA, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

ELECTRICAL

EWADA MFEW MF

TYPE 1

DR 2430

TYPE 3

SC 24

ADA STATION

DR 2430

SC 24

BS 582235 BB 122233

SC 24

LA, LV, G

5TH FLOOR115' - 9"

LALVG

FIFTH FLOOR115' - 9"

BSC 783235

BSCS 783236

WFA 30XX31

AS 301206

AS 301206

TL 21SR

WFA 36XX31

AS 361206

AS 361206

TL 21

WFA 36XX31

AS 361206

AS 361206

AS 361206

AS 361206

WFA 36XX31WFA 36XX31

AS 361206

AS 361206

TL 21TL 21

KS 422230 BD 182235BE 182235

BB 362235 BB 362235 BB 362235 BB 302235FILLER

TL 21TL 21

WFA 42XX31

AS 421206

AS 421206

BA 101635

EQ1.02.112

5TH FLOOR115' - 9"

5 6

FIFTH FLOOR115' - 9"

LALVG

BSC 783235

BSCS 783236

BA 101635KS 422230

SR

BB 242235BB 362235BB 362235BB 362235 FILLER

WFA 36XX31WFA 36XX31 WFA 24XX31WFA 36XX31WFA 36XX31

TL 21TL 21TL 21TL 21TL 21

WFA 42XX31

BE 182235BD 182235

TL 21

AS 361206

AS 361206

AS 361206

AS 361206AS 241206

AS 361206

AS 361206

AS 361206

AS 361206

AS 421206

AS 421206

5A13

5A13

1A13

1A13

6A13

6A13

2A13

2A13

EQ1.02.113

FILLER

AS 241206

2ND FLOOR79' - 9"

5 6

SECOND FLOOR79' - 9"

BSC 783235

BSCS 783236

BA 101635KS 422230

SR

BB 242235BB 362235FILLER

WFA 36XX31WFA 24XX31WFA 36XX31

TL 21TL 21TL 21

WFA 42XX31

BE 182235BD 182235BB 362235BB 362235FILLER

AS 361206

AS 361206AS 241206

AS 361206

AS 361206

AS 421206

AS 421206

LALVG

TL 21

EQ1.02.106

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

LALVGCSKCW

5LF FH

BP 242235 BN 242235BS 122235

EQ1.01.106

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

BSC 783235

BSCS 783236

6LF ADA FUMEHOOD

BS 122233

BNM 302328

BB 122233FHS 482934

EQ1.02.114

EQ1.01.107

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"KS 422230

SR

BB 302235BB 302235

WFA 36XX31WFA 30XX31WFA 30XX31

TL 21TL 21TL 21

WFA 42XX31

BE 182235BD 182235

TL 21

AS 301206

AS 301206

AS 301206

AS 301206

AS 361206

AS 361206

AS 421206

AS 421206

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"FILLER BB 362233 BD 182233

WC 301331WC 181331

TL 21

SLOPED TOP

BA 122233KS 422230

WC 411331

SRTL 21

SC 24

TL 10

G, LA, LV SC 12

LA, LV, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"BB 362233BD 182233

WC 301331WC 181331

TL 21

SLOPED TOP

KS 422230

WC 411331

TL 21SR

SC 24

TL 10

LA, LV, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"KS 422230BB 302235

BE 182235BD 182235

SC 24

WC 301331 WC 361331 WC 411331

SRTL 21TL 21 TL 21

SLOPED TOP

BB 302235

WC 241331

SC 12G, LA, LVTL 21

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

LV, LA, G

SC 24

KS 422230 BB 302235BE 182235

BD 182235

WC 301331WC 361331WC 411331

SRTL 21 TL 21TL 21

SLOPED TOP

BB 302235

WC 241331

SC 12

TL 21

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"BB 302235 BD 182235

WC 301331WC 181331

SLOPED TOP

BA 122235KS 422230

WC 411331

SRTL 21

SC 24

TL 21SC 12

TL 10G, LA, LV

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

LV, LA, G

BB 302235BD 182235

WC 301331WC 181331

SLOPED TOP

KS 422230

WC 411331

TL 21SR

SC 24

TL 21SC 12

TL 10

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EWADA MF

TYPE 3

ADA STATION

DR 2430

BB 122233

SC 24

EW MF

TYPE 1

DR 2430

BS 582235

SC 24 SC 24

LA, LV, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EQUIPMENT ZONE EQUIPMENT ZONE

ESEW

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

ESEW

EQUIPMENT ZONE

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EQUIPMENT ZONE

ESEW

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

CAS

EWO

RK

AND

INTE

RIO

REL

EVAT

ION

S

A10

SCALE: 1/4" = 1'-0"1

10 Module Open Lab ADA PeninsulaSouth

SCALE: 1/4" = 1'-0"2 10 Module Open Lab ADA Peninsula NorthSCALE: 1/4" = 1'-0"3

10 Module Open Lab Column PeninsulaSouth

SCALE: 1/4" = 1'-0"4

10 Module Open Lab Column PeninsulaNorthSCALE: 1/4" = 1'-0"5 10 Module Open Lab Sink Peninsula South

SCALE: 1/4" = 1'-0"6 10 Module Open Lab Sink Peninsula NorthSCALE: 1/4" = 1'-0"7 10 Module Open Lab Peninsula West

SCALE: 1/4" = 1'-0"8 10 Module Open Lab Wall SouthSCALE: 1/4" = 1'-0"9

10 Module Open Lab Wall North (5thFloor)

SCALE: 1/4" = 1'-0"10

10 Module Open Lab Wall North (2ndFloor)

SCALE: 1/4" = 1'-0"11

Open Lab 10 Module View of Fume HoodSouth

SCALE: 1/4" = 1'-0"12 4 Module Open Lab Wall EastSCALE: 1/4" = 1'-0"13 4 Module Open Lab Wall West

SCALE: 1/4" = 1'-0"14

4 Module Open Lab Peninsula ADA SinkEast

SCALE: 1/4" = 1'-0"15

4 Module Open Lab Peninsula ADA SinkWest

SCALE: 1/4" = 1'-0"16

4 Module Open Lab Peninsula No SinkEast

SCALE: 1/4" = 1'-0"17

4 Module Open Lab Peninsula No SinkWest

SCALE: 1/4" = 1'-0"18 4 Module Open Lab Peninsula Sink East

SCALE: 1/4" = 1'-0"19 4 Module Open Lab Peninsula Sink WestSCALE: 1/4" = 1'-0"20 4 Module Open Lab Peninsula South

SCALE: 1/4" = 1'-0"21 4 Module Open Lab South

SCALE: 1/4" = 1'-0"22 10 Module Open Lab West (North EWES)SCALE: 1/4" = 1'-0"23 10 Module Open Lab West (South EWES)

Page 16: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

TU 7230XX TU 6030XX

LA LG LV

3' - 0"8"8"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

D.7

FIFTH FLOOR115' - 9"

WFA 42XX85WFA 42XX85WFA 42XX85

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

COLD LAB

EW MF

TYPE 2

BS 362235BB 362235 BB 362235

FILLER FILLER

WFA 36XX31 WFA 36XX31

SR SR

AS 361206

AS 361206

AS 361206

AS 361206

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

COLD LAB

WFA 36XX80WFA 42XX85WFA 36XX80

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 421806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

AS 361806

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

BSC 783235 BSC 783235

CYLINDERRESTRAINT

BSCS 783236 BSCS 783236

EQ1.02.108 EQ1.02.109LALVG

LALVG

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EW MF

TYPE 2

WC 361331

BS 362235 BB 362235BB 362235

WC 361331

SR TL 21 TL 21

SLOPED TOP

EQ3.01.106

EQ3.01.105

LA

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

BSC 783235BSC 783235

BSCS 783236 BSCS 783236

EQ1.02.110 EQ1.02.111LALVG

LALVG

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EW MF

TYPE 2

BS 362235 BB 302235BB 362235

EQ3.01.108

EQ3.01.107

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EQUIPMENT ZONEEQUIPMENT ZONE

EQ3.03.102 EQ3.02.102

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EW MFLA

EQ3.08.101

Stainless Steel Sink

3' - 2"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

STERILIZERGLASSWARE

WASHER

Canopy Hood

EQ1.05.101 EQ1.03.101

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EQUIPMENT ZONEEQUIPMENT ZONE

SC 12

SC 24

KS 422230 BB 362235 BB 422235BE 182235

BD 182235

WC 361331 WC 361331WC 361331WC 411331

SRTL 21 TL 21TL 21

SLOPED TOP

TL 21LV, LA, G

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

EQUIPMENT ZONE

BA 101635

SR

BB 362235BB 302235BB 302235

WFA 36XX31WFA 36XX31WFA 30XX31WFA 30XX31

TL 21TL 21TL 21TL 21

KS 422230

WFA 42XX31

BE 182235BD 182235

TL 21

AS 301206

AS 301206

AS 301206

AS 301206

AS 361206

AS 361206

AS 361206

AS 361206

AS 421206

AS 421206

2ND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SECOND FLOOR79' - 9"

EW MF

BS 362235BB 302235 BB 362235FILLER

EQ3.01.103

EQ3.01.104

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

CAS

EWO

RK

AND

INTE

RIO

REL

EVAT

ION

S

A11SCALE: 1/4" = 1'-0"1 Swing Lab No. 1 East

SCALE: 1/4" = 1'-0"2 Swing Lab No. 1 WestSCALE: 1/4" = 1'-0"3 Cold Lab East

SCALE: 1/4" = 1'-0"4 Cold Lab WestSCALE: 1/4" = 1'-0"5 Tissue Culture North

SCALE: 1/4" = 1'-0"6 Tissue Culture SouthSCALE: 1/4" = 1'-0"7 Tissue Culture East

SCALE: 1/4" = 1'-0"8 Tissue Culture West (5th Floor)

SCALE: 1/4" = 1'-0"9 Tissue Culture Anteroom SouthSCALE: 1/4" = 1'-0"14 Glassware Wash Room South

SCALE: 1/4" = 1'-0"15 Glassware Wash Room WestSCALE: 1/4" = 1'-0"16 Swing Lab No. 2 Peninsula South

SCALE: 1/4" = 1'-0"17 Swing Lab No. 2 South

SCALE: 1/4" = 1'-0"22 Tissue Culture West (2nd Floor)

Page 17: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

2ND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SECOND FLOOR79' - 9"

EQUIPMENT ZONE

EW MF

TYPE 2

WFA 36XX31

SR

BB 362235BS 362235

WFA 36XX31

BB 362235 FILLER

AS 361206

AS 361206

AS 361206

AS 361206

TL 21 TL 21

DR 2430

2ND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SECOND FLOOR79' - 9"BB 362229 BE 182229KS 362229KS 362229 BD 182229

2ND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SECOND FLOOR79' - 9"

EW MF

TYPE 2

REFRIGERATOR

WFA 42XX31

SR

BB 422235 BS 362235

AS 421206

AS 421206

WFA 42XX31

BB 422235

AS 421206

AS 421206

TL 21TL 21

EQ3.02.103

2ND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SECOND FLOOR79' - 9"

4LF FH

MOBILESCINTILLATION

COUNTERGAMMA

BN 242235 BP 242235

L TABLE

EQ3.06.101 EQ3.05.101EQ3.04.101

EQ1.01.101

2ND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SECOND FLOOR79' - 9"

SAFE SAFE

SR

WFA 42XX31

AS 421206

AS 421206

EQ3.07.101EQ3.07.102

EQUIPMENT ZONE

WFA 42XX85WFA 42XX85WFA 42XX85

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

AS 421206

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

CAS

EWO

RK

AND

INTE

RIO

REL

EVAT

ION

S

A12SCALE: 1/4" = 1'-0"2 Animal Room East

SCALE: 1/4" = 1'-0"3 Animal Room Seating Area EastSCALE: 1/4" = 1'-0"5 Radioactive Prep Room North

SCALE: 1/4" = 1'-0"6 Radioactive Prep Room West

SCALE: 1/4" = 1'-0"7 Radioactive Prep Room EastSCALE: 1/4" = 1'-0"8 Radioactive Prep Room South

Page 18: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

F

FIFTH FLOOR115' - 9"

2' - 6

"

6"

4' - 5

"

2' - 6"

2- Adjustable Shelveson Wall Mountedstandard.

Knee space

Lab Work Station Chairby Owner

Open Shelving UnitBeyond.4'

- 6"

1' - 10"7"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

Bio Safety Cabinet

Bio Safety CabinetStand

See Equipment/Caseworkplans and Equipmentschedule for location ofducts. See Mechanicaldrawings for additional ductinformation.

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

2- Adjustable Shelveson Wall Mountedstandard.

Base Cabinets - SeeElevations for Type.

Lab Work Station Chairby Owner

Task Lighting

Pipe Chase, Provideclosure panels at allsides.

Lab gasses, for GasQuantity and type seemechanical dwgs.

2' - 1

0"1'

- 8"

2' - 7

"

7' - 1

"

1' - 1" 1' - 1"

1' - 10" 1' - 1 1/2" 1' - 10"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

Upper Cabinets wtihadjustable shelving.

Base Cabinets, SeeElevations for Type..

Service Raceway. SeeElectrical Dwgs.

Sloped Tops

Pipe Chase, ProvideClosure Panels at allSides.2'

- 10"

1' - 8

"2'

- 7"

7' - 1

"

2' - 6" 2' - 6"

1' - 1" 1' - 1"

1' - 10" 1' - 1 1/2" 1' - 10"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

2- Adjustable Shelveson Wall Mountedstandard.

Base Cabinets - SeeElevations for Type.

Task Light

Service Raceway, SeeElectrical Dwgs

Pipe Chase, ProvideClosure Panels at AllSides.

1' - 10"

3' - 0

"2'

- 7"

7' - 0

"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

F

FIFTH FLOOR115' - 9"

2- Adjustable Shelveson Wall Mountedstandard.

Base Cabinets - SeeElevations for type.

Lab Work Station Chairby Owner

Task Light

7' - 0

"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

2' - 6

"2'

- 0"

2' - 7

"

7' - 1

"

Upper Cabinets, SeeElevations for Type.

Knee space

Lab Work Station Chairby Owner

Task Lighting, SeeElectrical Dwgs.

Pipe Chase, Provideclosure panels at allsides.

1' - 10" 1' - 1 1/2" 1' - 10"

5TH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

FIFTH FLOOR115' - 9"

7- Adjustable Shelving

Wall MountedShelving SupportStandard

7' - 1

"

1' - 6"

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

CAS

EWO

RK

SEC

TIO

NS

A13

SCALE: 1/2" = 1'-0"1

Section thru Wall Mounted Knee Space /Shelving

SCALE: 1/2" = 1'-0"2 Section Thru BSCSCALE: 1/2" = 1'-0"3

Section thru Open Lab peninsula BaseDoor Unit

SCALE: 1/2" = 1'-0"4

Section Thru Open Lab pennisula Drawerbase

SCALE: 1/2" = 1'-0"5 Section thru Wall Mounted Door / ShelvingSCALE: 1/2" = 1'-0"6

Section Thru Wall Mounted Drawer /ShelvingSCALE: 1/2" = 1'-0"7 Section Thru ADA Peninsula

SCALE: 1/2" = 1'-0"8 Section Thru Adjustable Shelving

Page 19: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

BB 182235

Base cabinet - doorStanding height1 door

TYPICAL NOMENCLATURE DIAGRAM

DIAGRAMMATICFRONTELEVATION.PLAN/SIDEELEVATION, ASREQUIRED

CASEWORKIDENTIFIERAND SIZE

CASEWORKDESCRIPTION

PLAN

ELEVATION SIDE

SITTINGHEIGHT

STANDINGHEIGHT

BASE CABINET HEIGHT DEFINITION

ADAHEIGHT

1' - 1

0"

1' - 6"

PROVIDE LOCKS ASREQUIRED BYGENERALCASEWORK NOTENUMBER 9

1' - 6"

2' - 1

1"

1' - 10"

2' - 1

1"

2' - 9

"

2' - 5

"

GENERAL CASEWORK NOTES1. CASEWORK IS IDENTIFIED WITH A FOUR PART TAG: CT WWDDHH

CT=CASEWORK TYPEWW=NOMINAL WIDTH IN INCHESDD=NOMINAL DEPTH IN INCHESHH=NOMINAL HEIGHT IN INCHES

2. PROVIDE FINISHED SIDE/BACK CLOSURE/INSERT PANELS AT ALLKNEE SPACE UNITS AND KNEE SPACE DRAWER UNITS AND UNDERCOUNTER EQUIPMENT. COORDINATE RECEPTACLES INDICATEDWITH ELECTRICAL DIVISION.

3. RUBBER BASE TO BE APPLIED TO FIXED CASEWORK/COMPONENTS ANDKNEE SPACES IN THE FUME HOOD ALCOVES.

4. PROVIDE TASK LIGHTS AT UNDERSIDE OF SHELVES WHERE INDICATEDON ELEVATIONS. FIXTURES TO BE CENTERED ON UNIT. PROVIDEFIXTURES IN LENGTHS AS NOTED ON ELEVATIONS. NO VALANCE UNLESSOTHERWISE NOTED ON ELEVATION.

5. PROVIDE SURFACE RACEWAYS BENEATH LOWEST SHELF AS INDICATEDON ELEVATIONS.

6. PROVIDE RAIL COVERS AT ALL WALL FRAME ASSEMBLIES.

7. ALL SINK ACCESSORIES TO BE OWNER PROVIDED AND CONTRACTORINSTALLED UON.

8. FACEPLATES FOR RECEPTACLES BY CASEWORK MANUFACTURER(SECTION 12 30 00). DEVICES BY DIVISION 16.

9. PROVIDE LOCKS AT ALL CASEWORK NOTED WITH * (ASTERISK).

10. SEE EQUIPMENT PLANS AND EQUIPMENT SCHEDULES FOR EQUIPMENTAND SERVICES REQUIRED FOR THIS PROJECT.

11. ALL COUNTERTOPS AND SINKS ARE MOLDED RESIN UON. SEESPECIFICATION SECTION 12 30 00.

120V 120 voltage electrical receptacle208V 208 voltage electrical receptacleA Air (LA)AS Adjustable shelfADA Americans with disabilities actAFF Above finished floorBA Base cabinet - open shelfBB Base cabinet - doorBBM Base cabinet - door - mobileBC Base cabinet - door drawerBCM Base cabinet - door drawer - mobileBD Base cabinet - drawersBDM Base cabinet - drawers - mobileBE Base cabinet - drawersBEM Base cabinet - drawers - mobileBN Base cabinet - acidBP Base cabinet - flammableBQ Base cabinet - baseBS Base cabinet - sinkBSM Base cabinet - sink - mobileBSC Biological Safety CabinetCA Compressed AirCG Cylinder GasCFCI Contractor furnished contractor installedCHW Chilled waterCO2 Carbon dioxideCP Closure panelCR Cylinder restraintsCSK Cup sinkCSP Ceiling Service PanelCT Casework TypeCW Cold waterDC Base cabinet - suspendedDD DepthD Data receptacleDI Deionized waterDR Drying RackEP Emergency PowerEQ EqualER Epoxy resinESEW Emergency shower eye washEW Eye wash/Drench hoseEXH ExhaustFA Faucet assemblyFC File cabinetFD Floor drainFF&E Furniture, Fixtures, & EquipmentFH Fume hoodFP Foot pedal or sensor operatedFS Fixed ShelfG Gas (Fuel Gas)GC Gas CockGFI Ground fault interrupterGR Counter grommetHB Hose BibbHH HeightHP High PressureHW Hot waterIFA Island frame assemblyIS Inner shelfKS Knee spaceKSD Knee space drawerKSR Knee space railLA Lab AirLS Light switchLM Lab moduleLV Lab VentMB MarkerboardMF Mixing faucetMIB Mobile Instrument BenchNIC Not in contractOFCI Owner furnished contractor installedOFOI Owner furnished owner installedOH Opposite HandPB Glassware PegboardPE Point ExhaustPT Potting benchPC Pipe chasePTD Paper towel dispenserRB Rubber baseRO Reverse osmosis waterRO/DI Reverse osmosis deionized waterSA Overhead shelvingSC Service ChaseSCG Sink cabinet groupSD Soap dispenserSF Square footageSG Specialty gasSIM SimilarSK Sink SKA Sink fixture assemblySPC Suspended CaseworkSR Surface racewaySS Stainless steelTBD To be determinedTC Tall case - glass doorsTL Task lightTP Tall cabinet - flammableTR Trash receptacleTT Table - adjustable heightTTB Table - adjustable height - backsplashTTS Table - adjustable height - sinkTTM Table - adjustable height - mobileTU Table - fixed heightUC Under counterUON Unless Otherwise NotedV Vacuum (LV)VB Vacuum breakerVIF Verify in fieldWC Wall case - doorWG Wall groupWS Wire shelvingWW WidthWFA Wall frame assemblyBA 122235

Base cabinet - open shelf2 adjustable shelves

Similar: BA 101635, BA 122233

BB 182235Base cabinet - door1 adjustable shelf

Similar: BB 122233, BB182229, BB 182233, BB 242235

BB 362235Base cabinet - door1 adjustable shelf

Similar: BB 302233, BB 302235,BB 362229, BB 422235

BD 182235Base cabinet - drawers3 even drawers1 file cabinetPullboard

Similar: BD 182233

BD 182229Base cabinet - drawers2 even drawers1 file cabinet

BE 182235Base cabinet - drawers5 even drawers

Similar: BE 182229, BE 182233

BS 582235Base cabinet - sink

BE 362235Base cabinet - sink

KS 422230Knee space

cutout for electrical

2' - 1

1"

2' - 5

"

2' - 5

"

7' - 1

"

WC 241331Wall case - doorglass

Similar: WC 181331

WC 361331Wall case - doorglass

Similar: WC 301331, WC 421331

sloped top

7' - 7

"

MIBMobile Instrument Bench withSPC Suspended Casework

WFA 30XX31Wall frame assembly

Similar: WFA 24XX31, WFA36XX31, WFA42XX31

TL 21Task Light -see elevationsfor locations

Similar TL 10

TL 21Task Light -seeelevations forlocations

Similar TL 10

WFA 30XX31AS 301206Adjustable shelves

Similar: AS 241206,AS 361206, AS 421206

WFA 36XX80Wall frame assembly

Similar: WFA 42XX80

WFA 36XX80

AS 361806Adjustable shelves

Similar: AS 421806,AS 361206

TU 6030XXTable - fixed height

Similar: TU 7230XX

2' - 1

1"5'

- 2 3

/16"

6' BSC Biosafety Cabinet5' FH Fume Hood6' FH ADA Fume Hood

ADA sink station

TYPE 3SinkEpoxy Resin25"L x 18"W x 16"D

2' - 1

0"

3' - 0

"

3' - 0

"

TYPE 3SinkEpoxy Resin14"L x 10"W x 06"D

EW Eyewashdrench hose fixture

ADA mixing faucet(CW/HW)

Electrical outlet

TYPE 2SinkEpoxy Resin18"L x 14"W x 10 1/2"D

EW Eyewashdrench hose fixture

MF mixing faucet(CW/HW)

EW Eyewashdrench hose fixture

MF mixing faucet(CW/HW)

AdjustableShelving

SuspendedCabinet with 3Drawers

BSC Bio SafetyStand

2 BS Base Cabinet - Sink 1DoorFume Hood Stand

2 BS Base Cabinet - Sink 1DoorBP Base Cabinet - FlammableStorage 1 doorBP Base Cabinet - CorrosiveStorage 1 door.

CSCS

2' - 1

0"

3' - 0

"

2' - 8

"

CRCylinder Restraint

SRService Raceway

ESEWEmergency Shower adnEyewash (see plumbing)

SCService Chase

7' - 3

"

6"

2' - 0"

Plan

2' - 0"

PBPegboard

7' - 1

"

1' - 6"SS trough with drain

Plan 4' - 6

"

GW1Wall Mounted GascockLA Lab AirLV Lab VentLG Lab Gas

Coordinate with ServiceRaceway

3' - 9

"

Sink Types

Refer to Equipment/Casework plans and Equipmentschedule for location of ducts. Refer to Mechanicaldrawings for additional duct information.

Closure panel

GC 1:LA, LV, G

EQUIPMENT NOTE1. REFER TO SHEET A13 FOR THE EQUIPMENT SCHEDULE.

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

CAS

EWO

RK

GEN

ERAL

INFO

RM

ATIO

N

A14

SCALE: 1/4" = 1'-0"TYPICAL NOMENCLATURE DIAGRAM SCALE: 1/4" = 1'-0"1 GENERAL CASEWORK NOTES

SCALE: 1/4" = 1'-0"2 ABBREVIATIONSSCALE: 1/2" = 1'-0"CASEWORK

SCALE: 1/4" = 1'-0"3 GENERAL EQUIPMENT NOTE

Page 20: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

12 2

5

122

3

5

1'-0"

6"

4'-7

1/4"

1'-0"

2'-6"

1'-6 1/2" 2'-9"

2'-9"

A15

3

2

5

4

A15 6

7

8

9

6 6

5'-0"

1'-6"

4

3

4

5'-5"

7

7

2

1

3'-4"

2'-11

"

5

4

2'-3

1/2"

2'-10

" MAX

2'-3"

MIN

.

30" x 54" x 1/4"MIRROR MOUNTED

ON 'Z' CLIPSWALL TILE

ALUM. FLUSH MOUNT SUPPORT BRACKET2"x2"x1/4" L-SHAPED. VERTICAL LEGMOUNTED TO STUD BEHIND DRYWALL.

RAKKS "EH" BRACKET OR EQUAL.

6" CERAMICCOVE BASE

GLASS TILE

WALL TILE

2

1

3

4

GWB

WALLTILE

6" CERAMICCOVE BASE

GLASSTILE

BULLNOSEWALL TILE

3

4GWB

6" CERAMICCOVE BASE

5

6

4"

RECESSEDSUPPORTBRACKET

WALL TILE

GWB

6" CERAMICCOVE BASE

GLASS TILE

BULLNOSEWALLTILE

3

4

GWB

CERAMIC BASE

1

2

TILE

CERAMIC BASE

GWB

1

2

5

6

GWB

TILE

CERAMICBASE

5 3

4

CERAMICBASE

TILE

GWB1

2

3

4

GRAB BAR, C.C.

TOILET PAPER DISPENSER, V.C.

AUTOMATIC PAPER TOWEL DISPENSER, V.C.

SEMI-RECESSED WASTE RECEPTICAL, C.C.

TOILET ACCESSORIES LEGEND

5 SOAP DISPENSER, V.C.

6 MIRROR, C.C.

V.C. - VA SUPPLIED, CONTRACTOR INSTALLEDC.C. - CONTRACTOR SUPPLIED, CONTRACTOR INSTALLED

7 DOOR MOUNTED COAT HOOK, C.C.

RESILIENT FLOORING ASSCHEDULED

RESILIENT FLOORING ASSCHEDULED

ALIGN

HEAT WELDING RODSAS SCHEDULED NOTE:

NO INDEPENDENT TRANSITION STRIP USED.HEAT WELD ALL SEAMS AS SCHEDULED.

4"

PARTITION AS SCHEDULED

ROUND RESILIENT COVE CAP STRIP

RESILIENT FLOORING ASSCHEDULED

COVE FILLER STRIP

FACE OF SCHEDULEDPARTITION

1 1/

4"

1 1/4"

7/8"

7/8" CORNER TRIM, FRY REGLET#DMCT-1250 OR APPROVEDEQUAL

TAPE

AND

JOIN

T CO

MPOU

ND

6"

5/8" GWB

1 1/8" FURRING

NEW GWB ANDFURRING BELOW

NEW EPOXY RESINWINDOW STOOL

EXISTING WINDOW

EXISTING WALL AND COLUMN

SEALANT

3/4"

5/8" GWB

FULL OVERLAYFLUSH DOOR

MUD IN ALUMINUM CORNERGUARD

MUD IN ALUMINUM"L" TRIM

CONCEALED EUROPEANSTYLE HINGE

7/8"

3/8"

ACOUSTICAL CEILING TILE ASSEMBLY

LIGHT FIXTURE

5/8" SLOPED GWBLEVEL 5 FINISH

METAL STUDS

WALL BEYOND

PAINTED WOOD W/ FINISHED EDGE, ALIGN WITH ACT

METAL STUD

4"

1'-0"

5/8" GWB

+/- 2" THICK X 68 LONG X 15WIDE EPOXY RESIN BENCH TOP

TO MATCH LABS, PROVIDESHOP DRAWINGS

2" THICK FREE FLOATINGGWB PANEL AND

ASSEMBLY

1/4" REVEAL

METAL STUD

LIGHT FIXTURE - HOLDTIGHT TO FRONT FACE OF

RECESS AS SHOWN

1'-0"

1'-6"

1"

6"

GWB WITH LEVEL 5 FINISH

COVE BASE

RECESS

1'-2"

COVE BASE

METAL STUD W/ 5/8" GWB

ACOUSTICAL TILE CEILING OR GWB.REFER TO RCP PLANS.

PLASTIC LAMINATE LOCKERS(2 HIGH)

METAL STUD W/ 5/8" GWB

6'-0"

1'-0"

1'-7 1/2"

GWB

TAPE AND JOINT COMPOUND

VERTICAL STUD

HORIZONTAL STUD RIPPED TO WIDTH

GWB

3/4" WOOD

ALUMINUM "L" TRIM, FRYREGLET #DRML-625 ORAPPROVED EQUAL

1/4" FORBO TACK BOARD

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

ENLA

RG

ED P

LAN

S AN

D D

ETAI

LS

A15

SCALE: 1/2" = 1'-0"A15

1 ENLARGED BATHROOM PLANS

SCALE: 1/2" = 1'-0"A15

2 WOMEN'S EAST ELEV.SCALE: 1/2" = 1'-0"A15

3 WOMEN'S SOUTH ELEV.SCALE: 1/2" = 1'-0"A15

4 WOMEN'S WEST ELEV.SCALE: 1/2" = 1'-0"A15

5 WOMEN'S NORTH ELEV.

SCALE: 1/2" = 1'-0"A15

6 MEN'S EAST ELEV.SCALE: 1/2" = 1'-0"A15

7 MEN'S SOUTH ELEV.SCALE: 1/2" = 1'-0"A15

8 MEN'S WEST ELEV.SCALE: 1/2" = 1'-0"A15

9 MEN'S NORTH ELEV.

SCALE: 6" = 1'-0"A15

12

RESILIENT SHEET FLOOR TO RESILIENTSHEET FLOOR TRANSITION

SCALE: 6" = 1'-0"A15

13 RESILIENT INTEGRAL BASESCALE: 6" = 1'-0"A15

10 CORNERGUARD DETAIL

SCALE: 1" = 1'-0"A15

14

TYPICAL COLUMN AND WINDOWFURRING

N

SCALE: 3" = 1'-0"A15

15 WALL DETAIL AT LOCKERSCALE: 1/2" = 1'-0"A15

16 WALL SECTION AT HALL TERMINUSSCALE: 1/2" = 1'-0"A15

17 WALL SECTION AT BENCHSCALE: 1/2" = 1'-0"A15

18 WALL SECTION AT LOCKERS

SCALE: 6" = 1'-0"A15

11 DETAIL AT TACKBOARD

Page 21: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

1

UNDERSIDE OF FLOOR SLAB

DEFLECTION TRACK

BATT INSULATION

5/8" MOLD RESISTANTGWB

3 5/8" METAL STUD

METAL CHANNEL RUNNER

TYPICAL INTERIOR PARTITIONUL No. U419

2 43

UNDERSIDE OF FLOOR SLAB

DEFLECTION TRACKBATT INSULATION

5/8" GWB

3 5/8" METAL STUD

METAL CHANNEL RUNNER

5/8" WATER AND MOLDRESISTANT GWB

MORTAR

CERAMIC TILE

UNDERSIDE OF FLOOR SLAB

DEFLECTION TRACK

BATT INSULATION

3 5/8" METAL STUD

METAL CHANNEL RUNNER

5/8" CONCRETEBACKERBOARD

MORTAR

CERAMIC TILE

TOILET ROOM PARTITIONUL No. U407

TOILET ROOM CHASE PARTITION

5

UNDERSIDE OF FLOOR SLAB

DEFLECTION TRACK

BATT INSULATION

3 5/8" METAL STUD

METAL CHANNEL RUNNER

5/8" MOLD RESISTANTGWB

CHASE PARTITION

6

UNDERSIDE OFFLOOR SLAB

1 1/2" METALFURRING STRIP

5/8" MOLDRESISTANT GWB

FURRING PARTITION

7

UNDERSIDE OF FLOOR SLAB

DEFLECTION TRACK

BATT INSULATION

5/8" MOLD RESISTANTGWB

5 5/8" METAL STUD

METAL CHANNEL RUNNER

THICKENED INTERIOR PARTITIONUL No. U419

5" * 5 3/8" 4 3/4" 4 3/8" * 2 1/4" * 7" *

SEALANT SEALANTSEALANT SEALANT SEALANTSEALANT

5/8" CONCRETEBACKERBOARD BEHIND TILE

8

UNDERSIDE OF FLOOR SLAB

DEFLECTION TRACK

BATT INSULATION

5/8" MOLD RESISTANTGWB

9 5/8" METAL STUD

METAL CHANNEL RUNNER

THICKENED INTERIOR PARTITIONUL No. U419

10 7/8"

SEALANT

LEAD LINING ASSPECIFIED ON SHEET A3.

SEE NOTE 9, 10 & 11.ALSO REFER TO 9/A16.

* WIDTH OF WALL WILL INCREASE BY WIDTH OFLEAD LINING WHERE SPECIFIED ON SHEET A3

LEAD LINING ASSPECIFIED ON SHEET A3.

SEE NOTE 9, 10 & 11.ALSO REFER TO 9/A16.

LEAD LINING ASSPECIFIED ON SHEET A3.

SEE NOTE 9, 10 & 11.ALSO REFER TO 9/A16.

LEAD LINING ASSPECIFIED ON SHEET A3.

SEE NOTE 9, 10 & 11.ALSO REFER TO 9/A16.

9

DEFLECTION TRACK

BATT INSULATION

METAL STUD

METAL CHANNEL RUNNER

3 LAYERS 5/8" MOLDRESISTANT GWB

2 HR RATED CHASE PARTITIONUL U408

SEALANT

1. INTERIOR STEEL STUDS: NOT LESS THAN 20 GAUGE AND NOT MORE THAN 1' -4" ON CENTER.2. PROVIDE DOUBLE STUDS AT EACH SIDE OF OPENINGS. EXTEND STUDS FROM FLOOR TOUNDERSIDE OF STRUCTURE.3. PROVIDE BACKING/BLOCKING IN PARTITIONS FOR WALL HUNG ITEMS. SEE DETAIL 3/A16,UNLESS OTHERWISE INDICATED.4. EXTEND PARTITIONS FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE PER DETAILS.5. MAINTAIN CONTINUITY OF RATED PARTITIONS AT INTERSECTIONS WITH NON-RATED ORLESSER RATED PARTITIONS.6. FOR FRAME PROFILE, DOOR TYPES & FRAME TYPES, SEE A18.7. FOR DUCT PENETRATIONS THRU RATED PARTITIONS SEE 4/A16.

NOTES:

MAXIMUM ALLOWABLE LOAD-IN POUNDSQUANTITY OF SCREWSSCREW

SIZE 2 3 4 5#6 - S12#8 - 18#10 - 16#12 - 14

224236272288

336354438438

448472484576

560590700700

LOADS BASED ON PUBLISHEDDATA FOR MILCOR TITELOCKSCREWS WITH 20 GA GALV STEELBACKING AND LIMITING CRITERIABEING PULLOUT STRENGTH

MET STUD BRACE@ 4'-0" OC MAX

ACT CLG.

5

5

GWB CLG.SEE RCP7'

-2"

UN

O

SCH

ED. C

LG. H

T

4"

NOTE:STUD PROJECTING BELOWKICKER SHOULD NOTEXCEED 2'-0"

8A16

SECTION DETAIL - GYB. SOFFIT1 1/2" = 1'-0"

7A16

DRYWALL CONTROL JOINTNTS

4A16

FIRE RATED PARITION - DUCT PENETRATION1 1/2" = 1'-0"

FIRE STOPPINGWHERE FIRE RATEDPARTITIONS OCCUR

ACOUSTICALSEALANT

STEEL STUDS

GWBDRYWALLCONTROL JOINT 3/8"

1/2" MIN

DRYWALL CONTROL JOINT NOTES:

1. PROVIDE CONTROL JOINTS IN UNINTERRUPTED LONGEXPANSES OF PARTITION @ 30'-0" OC MAX2. LOCATE JOINTS AT EACH CORNER OF NON-FULLHEIGHT DOOR OR BORROWED LIGHT FRAMES.3. JOINTS SHALL OCCUR ON BOTH SIDES OF PARTITIONWHERE GYPSUM BOARD OCCURS.

DUCT

FIRE TRACK

FIXED GWB. FIRETREATED GWB-11

GWB PARTITION(SEE PLAN)

TABLE 1

1. SEE TABLE 1 FOR QUANTITY AND SIZE OF SCREWFOR CONNECTION OF WALL HUNG ITEMS, IF NOTALREADY PROVIDED BY MFR OF WALL HUNG ITEM.

PARTITION NOTES:

STL. STUD

16 GAUGE 6" WIDEKITCHEN METAL

OR

STUDTRACK

4" OR 6"

4 #10 SHTMET SCREWS

ISOMETRIC

NOTES:1. THESE ANCHORING DETAILS ARE SHOWN AS TYPICAL ANDARE NOT INTENDED TO BE ALL INCLUSIVE. PROVIDE STEELBACKING IN PARTITIONS FOR WALL HUNG ITEMS, SUCH ASWALL CABINETS, BLDG ACCESS, BATHROOM ACCESS,SHELVING, DOOR HOLD-OPENS, & STOPS, ETC, INCLUDINGNIC, BO, BOF, & RE ITEMS.

2. USE THE FOLLOWING ASSUMED LOADS TO DETERMINEBLKG & FASTENER REQUIREMENTS UNLESS GREATERLOADS ARE KNOWN.

a. S DISP, PTC, TPH, MIRRORS, COAT HOOKS, BPG,TOWEL BAR & RING, MOP HOLDER, ASH URN, ETC -USE 100 lbsb. GRAB BARS 0 USE 250 LB CONCENTRATED LOADc. WALL CABINETS - USE WEIGHT OF CABINET PLUS100 LB PER FOOT OF SHELF.d. COUNTERTOPS - USE WEIGHT OF COUNTER TOPPLUS 55 LB PER FOOT OF COUNTER.e. 12" ADJ SHELVES - USE 40 LB PER BRKTf. 18" ADJ SHELVES - USE 55 LB PER BRKTg. 24" ADJ SHELVES - USE 83 LB PER BRKT

BOTTOM OF STRUCTURE

BROKEN LINE INDICATESMETAL FRAME

DOUBLE STL STUDSEACH SIDE TO BOTTOMOF STRUCTURE

RUNNER TRACK

FLOOR LINE

PAR

TITI

ON

S FL

OO

R T

O S

TRU

CTU

RE

ABO

VE

1'-4" 1'-4"EQEQEQ

FULL

HEI

GH

T PA

RTI

TIO

NS

CRIPPLE STUD ATCONTROL JOINT, DO NOTANCHOR TO JAMB STUDS- TYP BOTH SIDESBOTTOM OF STRUCTURE

BROKEN LINE INDICATESPARTITION EXTENDINGTO STRUCTURE ABOVEBROKEN LINE INDICATESBORROWED LITE FRAME

DOUBLE 20 GA. STLSTUDS EACH SIDE

RUNNER TRACKFLOOR LINE

VERIFY B.L.T. SIZESTUDS 16" OC MAX

NOTE: FOR BRACING OFPATRIAL HEIGHT PARTITIONSSEE GYB PARTITION NOTE 5.

5A16

DOOR FRAMING ELEVATIONN.T.S.

6A16

WINDOW FRAMING ELEVATIONN.T.S.

3A16

TYPICAL WALL BLOCKING/BLOCKING SUPPORTN.T.S.

2A16

TYPICAL PARTITION NOTESN.T.S.

AS REQ'D

6X5

5/8" LEAD LINED GWB MIN. 20 GAUGE STEELSTUDS @ 16" O.C.

5/8" LEAD LINED GWB 5/8" GWB

CORNER INTERSECTION DETAILPLAN VIEW WALL DETAIL INSIDE CORNER OUTSIDE CORNER

MIN. 20 GAUGE STEEL STUDS @ 16" O.C.

2" WIDE STRIPES AT GWBJOINTS. SAME THICKNESS AS

LEAD LINING.

5/8" LEAD LINED GWB

SHIMS NEEDED ATINTERMEDIATE STUDS

3/8" DIAM. LEAD DISCS

5/8" LEAD LINED GWB

4" WIDE LEAD STRIPAT CORNERS

2" WIDE STRIPS - SAMETHICKNESS AS LEAD LINING

MIN. 20 GAUGE STEELSTUDS @ 16" O.C.

3/8" DIAM. LEAD DISCS

5/8" LEAD LINED GWB

4" WIDE LEAD STRIPAT CORNERS

2" WIDE STRIPS - SAMETHICKNESS AS LEAD LINING

MIN. 20 GAUGE STEELSTUDS @ 16" O.C.

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

PAR

TITI

ON

SC

HED

ULE

S AN

DD

ETAI

LS

A16

SCALE: 1" = 1'-0"A16

1 PARTITION TYPES

SCALE: 1 1/2" = 1'-0"A16

9 LEAD LINED WALL DETAILS

Page 22: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

5'-0"

P2 P2 P2

P2 P2 P1

P2

P2

P2

P2

P2

P1

GT1GT2

GT1 GT2

P2

P2

P2

P2ALL SIDES (TYP)

A

1 2 3 4 5 6

B

C

D

E

F

C.9

D.7

E.8

3 5/8"

P1 P1 P1

P1 P1 P2

P1

P1

P1

P1

P1

P2

P1

GT2GT1

GT2 GT1

P1

P1

P1

P1ALL SIDES (TYP)

LEGEND

CARPET

VINYL TILE - COLOR 1

VINYL TILE - COLOR 2

VINYL TILE - COLOR 3

SHEET VINYL

CERAMIC TILE

GENERAL NOTES

1. ALL WALLS TO BE COLOR P3 U.N.O.

GLASS TILE 1

GLASS TILE 2

GT1

GT2

ABBREVIATIONS

PAINT 1

PAINT 2

P1

P2

PAINT 3P3

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

NORTH

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AM

August 8, 2011

642-10-160

FIN

ISH

PLA

NS

A17

SCALE: 1/8" = 1'-0"A17

1 SECOND FLOOR FINISH PLANSCALE: 1/8" = 1'-0"A17

2 FIFTH FLOOR FINISH PLAN

Page 23: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

D1

FRAME TYPE

DOOR TYPES

2" SEE SCHEDULE 2"

SEE S

CHEDUL

E2"

SEE SCHEDULE

SEE S

CHEDUL

E

SEE SCHEDULE

SEE S

CHEDUL

E

SEE SCHEDULE

SEE S

CHEDUL

E

D2 D3

F1

LOUVER

12" x DOOR WIDTH"S.S. KICK PLATE

SEE SCHEDULE

SEE S

CHEDUL

E

D4

2" SEE SCHEDULE

2"

2'-0" 2"

SEE S

CHEDUL

E2"

F2I1/4" LAMINATED GLASS WITHINTERLAYER COLOR AND OPACITYTO BE SELECTED BY ARCHITECTFROM STANDARD COLOR PALLET.

DRYWALL, THICKNESSSINGLE OR DOUBLE

AS REQ'D

DOUBLE STUDS,BACK TO BACK

JAMB ANCHORS

STANDARD FRAMEFOR DRYWALL

CAULK ALL AROUNDBOTH SIDES

CERAMIC TILE FINISHWHERE REQ'D

STUD WIDTH

FRAMES IN METALSTUD PARTITIONS

2" VARIES VARIES

3"

HM-1

1 1/8"STUD5/8"

1/2" 1/2"

VARIES1/8"VARIES2"

3"3/

8"

LEAD LINED GWB

GWB EXTENDED AS REQ'DTO NEAREST INSIDE CORNER

2 1/2"x2"x3/8"ANGLES,FASTEN BOTH ENDS

FRAME MUSE BE AT LEAST2 PIECE TO INSTALL OVER ANGLE

WHEN LEAD OCCURS ON THISPARTITION FACE, EXTEND LEAD

SHIEDLING COMPLETELY AROUNDINSIDE FACE OF BUCK

GROUT FRAME

LEAD LINED JAMB/HEADER

HM-2

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JD

AHK

August 8, 2011

642-10-160

SCH

EDU

LES

AND

DO

OR

DET

AILS

A18

ROOM FINISH SCHEDULE

Room # NAME

FINISHES

SPECIAL NOTES AND COMMENTSFLOOR BASEWALLS

CEILINGN E S W

Not PlacedA211 Work Room VCT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA501 HAC CT CT 4' CT WC 4' CT WC 4' CT WC 4' CT WC GWB - PTSECOND FLOORA201 HAC CT CT 4' CT WC 4' CT WC 4' CT WC 4' CT WC GWB - PTA202 Radioactive Prep Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT AT keyed; GWP - PT @ closet ceilingA203 Animal Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA203A Imaging Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA203B Animal Recovery Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA205 Equipment Room No. 2 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA206 Instrument Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA207 Tissue Culture Anteroom Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA207A Tissue Culture Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA207B Tissue Culture Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA208 Equipment Room No. 1 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA209 Cold Storage Room -- -- -- -- -- -- -- Packaged roomA210 Swing Lab No. 1 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA212 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA213 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA214 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA215 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA216 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA217 Post Doc Workstations CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA218 Open Lab Sheet Flooring RB GWB - PT GWB - PT GWB - PT GWB - PT ATA219 Women's Toilet CT CT 4' CT WC 4' CT WC 4' CT WC 4' CT WC ATA220 Men's Toilet CT CT 4' CT WC 4' CT WC 4' CT WC 4' CT WC ATA221 Data None None PT PT PT PT PT seal floorA222 Open Lab Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA223 Elec None None PT PT PT PT PT seal floorC2-1 Lobby VCT RB GWB - PT GWB - PT GWB - PT GWB - PT AT with patternC2-2 Corridor VCT RB GWB - PT GWB - PT GWB - PT GWB - PT AT with patternC2-3 Corridor VCT RB GWB - PT GWB - PT GWB - PT GWB - PT AT with patternST 7-2 Stair 7 ETR ETR ETR ETR ETR ETR ETRFIFTH FLOORA502 Conference Room CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA503 Swing Lab No. 2 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA503A Equipment Room No. 3 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA504 Glassware Wash Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA505 Equipment Room No. 2 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA506 Instrument Room Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA507 Tissue Culture Anteroom Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA507A Tissue Culture Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA507B Tissue Culture Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT GWB - PTA508 Equipment Room No. 1 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA509 Cold Lab -- -- -- -- -- -- -- Packaged roomA510 Swing Lab No. 1 Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA511 Work Room VCT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA512 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA513 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA514 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA515 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA516 PI Office CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA517 Post Doc Workstations CPT RB GWB - PT GWB - PT GWB - PT GWB - PT ATA518 Open Lab Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA519 Women's Toilet CT CT 4' CT WC 4' CT WC 4' CT WC 4' CT WC ATA520 Men's Toilet CT CT 4' CT WC 4' CT WC 4' CT WC 4' CT WC ATA521 Data None None PT PT PT PT PT seal floorA522 Open Lab Sheet Flooring IB GWB - PT GWB - PT GWB - PT GWB - PT ATA523 Elec. None None PT PT PT PT PT seal floorC5-1 Lobby VCT RB GWB - PT GWB - PT GWB - PT GWB - PT AT with patternC5-2 Corridor VCT RB GWB - PT GWB - PT GWB - PT GWB - PT AT with patternC5-3 Corridor VCT RB GWB - PT GWB - PT GWB - PT GWB - PT AT with patternST 7-5 Stair 7 ETR ETR ETR ETR ETR ETR ETR

DOOR SCHEDULE

NUMBER ROOM #SIZE DOOR FRAME HARDWARE

GROUP COMMENTSWIDTH HEIGHT MATERIAL TYPE MATERIAL TYPE

SECOND FLOOR1 201 2' - 6" 7' - 0" Wood D3 HM-1 F1 381 202 3' - 6" 7' - 0" Wood D1 HM-2 F1 67 keyed access to door, lead lined door and lead wrapped door

frame2 202 5' - 8" 7' - 0" Wood D1 HM-2 F1 433 202 5' - 8" 7' - 0" Wood D1 HM-2 F1 431 203 3' - 6" 7' - 0" Wood D1 HM-2 F1 69 Integrated card swipe and electric strike1 203A 3' - 6" 7' - 0" Wood D1 HM-2 F1 691 203B 3' - 6" 7' - 0" Wood D1 HM-2 F1 691 205 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 206 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike2 206 3' - 6" 7' - 0" Wood D2 HM-1 F1 671 207 3' - 6" 7' - 0" Wood D2 HM-1 F1 7 Integrated card swipe and electric strike1 207A 3' - 6" 7' - 0" Wood D2 HM-1 F1 71 207B 3' - 6" 7' - 0" Wood D2 HM-1 F1 71 208 3' - 6" 7' - 0" Wood D2 HM-1 F1 43 Integrated card swipe and electric strike2 208 3' - 6" 7' - 0" Wood D2 HM-1 F1 431 210 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 211 3' - 0" 7' - 0" Wood D1 HM-1 F1 381 212 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 213 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 214 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 215 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 216 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 217 3' - 0" 7' - 0" Wood D2 HM-1 F1 231 218 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike2 218 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 219 3' - 0" 7' - 0" Wood D1 HM-1 F1 11 220 3' - 0" 7' - 0" Wood D1 HM-1 F1 11 221 4' - 0" 7' - 0"1 222 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike2 222 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 223 3' - 0" 7' - 0" Wood D3 HM-1 F1 432 223 2' - 6" 7' - 0" -- -- -- -- -- paint frame, remove existing door leaf1 C2-1 3' - 6" 7' - 0" Wood D2 HM-1 F1 82 Integrated card swipe and electric strike1 C2-3 5' - 8" 7' - 0" ETR ETR ETR ETR -- add automatic opener and ADA push button1 ST 7-2 3' - 8" 7' - 0" ETR -- -- -- -- paint door and frame

FIFTH FLOOR1 501 2' - 6" 7' - 0" Wood D3 HM-1 F1 381 502 3' - 0" 7' - 0" Wood D4 HM-1 F2 401 503 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 503A 3' - 6" 7' - 0" Wood D2 HM-1 F1 431 504 3' - 6" 7' - 0" Wood D1 HM-1 F1 691 505 3' - 6" 7' - 0" Wood D2 HM-1 F1 431 506 3' - 6" 7' - 0" Wood D2 HM-1 F1 43 Integrated card swipe and electric strike2 506 3' - 6" 7' - 0" Wood D2 HM-1 F1 431 507 3' - 6" 7' - 0" Wood D2 HM-1 F1 7 Integrated card swipe and electric strike1 507A 3' - 6" 7' - 0" Wood D2 HM-1 F1 71 507B 3' - 6" 7' - 0" Wood D2 HM-1 F1 71 508 3' - 6" 7' - 0" Wood D2 HM-1 F1 43 Integrated card swipe and electric strike2 508 3' - 6" 7' - 0" Wood D2 HM-1 F1 431 510 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 511 3' - 0" 7' - 0" Wood D2 HM-1 F1 381 512 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 513 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 514 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 515 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 516 3' - 0" 7' - 0" Wood D1 HM-1 F1 231 517 3' - 0" 7' - 0" Wood D2 HM-1 F1 231 518 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike2 518 3' - 6" 7' - 0" Wood D2 HM-1 F1 671 519 3' - 0" 7' - 0" Wood D1 HM-1 F1 11 520 3' - 0" 7' - 0" Wood D1 HM-1 F1 11 521 4' - 0" 7' - 0"1 522 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike2 522 3' - 6" 7' - 0" Wood D2 HM-1 F1 67 Integrated card swipe and electric strike1 523 3' - 0" 7' - 0" Wood D3 HM-1 432 523 2' - 6" 7' - 0" -- -- -- -- -- paint frame, remove existing door leaf1 C5-1 3' - 6" 7' - 0" Wood D2 HM-1 F1 82 Integrated card swipe and electric strike1 C5-3 5' - 8" 7' - 0" ETR -- -- -- -- paint1 ST 7-5 3' - 8" 7' - 0" ETR -- -- -- -- paint

Page 24: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

EQU

IPM

ENT

SCH

EDU

LE

A19

EQUIPMENT SCHEDULE

Program Space Name

ProgramSpace

Number Mark Type Description Type Comments Voltage Flammable AcidCupsink FH

LeftCold

WaterHot

Water DI Drain Air Vacuum Gas Exhaust Furnished Installed LP Notes

Radioactive Prep Room A202 EQ1.01.101 4FH 4LF Fumehood (1) 120V duplex outlet each side 120V Yes Yes No No No No Yes Yes Yes Contractor ContractorRadioactive Prep Room A202 EQ3.02.103 Refrigerator Refrigerator 115V, 60 Hz No No No No No No Owner OwnerRadioactive Prep Room A202 EQ3.04.101 L Table L Table No No No No No No Owner OwnerRadioactive Prep Room A202 EQ3.05.101 Gamma Gamma No No No No No No Owner OwnerRadioactive Prep Room A202 EQ3.06.101 Scintill Counter Scintillation Counter Mobile No No No No No No Owner OwnerRadioactive Prep Room A202 EQ3.07.101 Safe Safe No No No No No No Owner OwnerRadioactive Prep Room A202 EQ3.07.102 Safe Safe No No No No No No Owner OwnerTissue Culture Anteroom A207 EQ3.02.101 equipment equipmentTissue Culture Anteroom A207 EQ3.03.101 equipment equipmentTissue Culture A207A EQ1.02.103 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A207A EQ1.02.104 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A207A EQ1.06.103 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A207A EQ1.06.104 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A207A EQ3.01.103 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6

FLANo No No No No No Owner Owner

Tissue Culture A207A EQ3.01.104 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6FLA

No No No No No No Owner Owner

Tissue Culture A207A EQ3.01.105 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6FLA

No No No No No No Owner Owner

Tissue Culture A207A EQ3.01.106 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6FLA

No No No No No No Owner Owner

Tissue Culture A207B EQ1.02.101 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A207B EQ1.02.102 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A207B EQ1.06.101 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A207B EQ1.06.102 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A207B EQ3.01.101 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6

FLANo No No No No No Owner Owner

Tissue Culture A207B EQ3.01.102 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6FLA

No No No No No No Owner Owner

Cold Storage Room A209 EQ1.02.101 Cold Room Cold Room 208-230V, 60Hz, SinglePhase

Contractor Contractor Cold Storage Room

Open Lab A218 EQ1.01.104 6FH ADA 6LF ADA Fumehood 72"W x 39"D, (1) 120V duplex outlet each side 120V No Yes Yes Yes No Yes Yes Yes Yes Contractor ContractorOpen Lab A218 EQ1.02.107 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes 100% Vented Contractor Contractor Class II, Type B2Open Lab A222 EQ1.01.102 6FH ADA 6LF ADA Fumehood 72"W x 39"D, (1) 120V duplex outlet each side 120V No Yes Yes Yes No Yes Yes Yes Yes Contractor ContractorOpen Lab A222 EQ1.01.103 5FH 5LF Fumehood (1) 120V duplex outlet each side 120V Yes Yes Yes Yes No Yes Yes Yes Yes Contractor ContractorOpen Lab A222 EQ1.02.105 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes 100% Vented Contractor Contractor Class II, Type B2Open Lab A222 EQ1.02.106 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes 100% Vented Contractor Contractor Class II, Type B2Glassware Wash Room A504 EQ1.03.101 Autoclave Autoclave 110V, 10A, Single

PhaseYes No No Yes Yes No No Contractor Contractor

Glassware Wash Room A504 EQ1.05.101 Glass wash/dry Glass washer/Dryer 208V, 60Hz, 3-Phase,2kW, 10 Amps

Yes Yes Yes Yes Contractor Contractor

Glassware Wash Room A504 EQ3.08.101 equipment equipmentTissue Culture Anteroom A507 EQ3.02.102 equipment equipmentTissue Culture Anteroom A507 EQ3.03.102 equipment equipmentTissue Culture A507A EQ1.02.110 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A507A EQ1.02.111 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A507A EQ1.06.107 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A507A EQ1.06.108 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A507A EQ3.01.107 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6

FLANo No No No No No Owner Owner

Tissue Culture A507A EQ3.01.108 Stacked Incubator Stacked Incubator 115V, 50/60 Hz, 3.6FLA

No No No No No No Owner Owner

Tissue Culture A507B EQ1.02.108 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A507B EQ1.02.109 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes Recirculating Contractor Contractor Class II, Type A2Tissue Culture A507B EQ1.06.105 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorTissue Culture A507B EQ1.06.106 Single Cylinder Restraint Cylinder Restraint 3"-10" cylinders Contractor ContractorCold Lab A509 EQ1.04.102 Cold Room Cold Room 208-230V, 60Hz, Single

PhaseContractor Contractor Cold Lab

Open Lab A518 EQ1.01.107 6FH ADA 6LF ADA Fumehood 72"W x 39"D, (1) 120V duplex outlet each side 120V No Yes Yes Yes No Yes Yes Yes Yes Contractor ContractorOpen Lab A518 EQ1.02.114 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes 100% Vented Contractor Contractor Class II, Type B2Open Lab A522 EQ1.01.105 6FH ADA 6LF ADA Fumehood 72"W x 39"D, (1) 120V duplex outlet each side 120V No Yes Yes Yes No Yes Yes Yes Yes Contractor ContractorOpen Lab A522 EQ1.01.106 5FH 5LF Fumehood (1) 120V duplex outlet each side 120V Yes Yes Yes Yes No Yes Yes Yes Yes Contractor ContractorOpen Lab A522 EQ1.02.112 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes 100% Vented Contractor Contractor Class II, Type B2Open Lab A522 EQ1.02.113 BSC 783236 6LF Biosafety Cabinet (1) 120V duplex outlet each side 115V, 60Hz, 20A No Yes Yes Yes 100% Vented Contractor Contractor Class II, Type B2

Page 25: 1 BUILDING 21 LABORATORY RENOVATION - Pride Enterprises, Inc. drawings part 1.pdf · h19 hvac lab control sequences and details ... p8 plumbing details p9 plumbing details plumbing

04

816

04

80

40

40

26"

02

6"0

16"

6"on

e eig

hth

inch

= on

e foo

ton

e qua

rter i

nch

= one

foot

thre

e eig

hths

inch

= on

e foo

ton

e half

inch

= on

e foo

tth

ree q

uarte

rs in

ch =

one f

oot

one i

nch

= one

foot

one a

nd o

ne h

alf in

ch =

one f

oot

thre

e inc

hes =

one

foot

1

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8

A

B

C

D

E

F

A

B

C

D

E

F

Draw

ing

Title

Proj

ect T

itle

Loca

tion

Date

Revis

ions

:Da

te

Build

ing

Num

ber

FULL

Y SP

RIN

KLER

ED

BID

DO

CU

MEN

TS

Chec

ked

Draw

n

Drawing Number

Project Number

101 W

. STA

TION

SQUA

RE D

RIVE

, FOU

RTH

FLOO

RPI

TTSB

URGH

, PEN

NSYL

VANI

A 15

219

PH: 4

12.28

7.733

3 FAX

: 412

.287.7

334

www.

ae-w

orks

.com

A E

wo

rks

Lab

Cons

ulta

nt:

Envir

onm

enta

l Con

sulta

nt:

21 Phila

delp

hia,

PA

VA P

hila

delp

hia

2nd

and

5th

Floo

r Ren

ovat

ions JS

NT

August 8, 2011

642-10-160

SIN

K AN

D F

IXTU

RE

SCH

EDU

LES

A20

SINK SCHEDULE

Program Space NameProgram Space

Number Description Type Mark W H D DrainMixingFaucet Cold Water Hot Water

EyewashDrenchhose

Radioactive Prep Room A202 Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesAnimal Room A203 Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesTissue Culture A207A Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesTissue Culture A207B Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesOpen Lab A218 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A218 Sink undermount TYPE 3 10" 6" 1' - 2" Yes Yes Yes Yes YesOpen Lab A222 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A222 Sink undermount TYPE 3 10" 6" 1' - 2" Yes Yes Yes Yes YesOpen Lab A222 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A222 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A222 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesSwing Lab No. 2 A503 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesTissue Culture A507A Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesTissue Culture A507B Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesCold Lab A509 Sink undermount TYPE 2 1' - 6" 10 1/2" 1' - 2" Yes Yes Yes Yes YesOpen Lab A518 Sink undermount TYPE 3 10" 6" 1' - 2" Yes Yes Yes Yes YesOpen Lab A518 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A522 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A522 Sink undermount TYPE 3 10" 6" 1' - 2" Yes Yes Yes Yes YesOpen Lab A522 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A522 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes YesOpen Lab A522 Sink undermount TYPE 1 2' - 1" 1' - 4" 1' - 6" Yes Yes Yes Yes Yes

FIXTURE SCHEDULE

Program Space NameProgram Space

Number Description Type Mark Comments

Open Lab A218 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A218 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A218 Counter mounted single gas cock GC1 LV Single outlet.Open Lab A218 Counter mounted single gas cock GC1 LA Single outlet.Open Lab A218 Counter mounted single gas cock GC1 G Single outlet.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A222 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A222 Counter mounted single gas cock GC1 LV Single outlet.Open Lab A222 Counter mounted single gas cock GC1 LA Single outlet.Open Lab A222 Counter mounted single gas cock GC1 G Single outlet.Swing Lab No. 2 A503 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Swing Lab No. 2 A503 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Swing Lab No. 2 A503 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A518 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A518 Counter mounted single gas cock GC1 LV Single outlet.Open Lab A518 Counter mounted single gas cock GC1 LA Single outlet.Open Lab A518 Counter mounted single gas cock GC1 G Single outlet.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LA Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 G Double outlet at 180 degrees.Open Lab A522 Counter mounted double gas cock GC2 LV Double outlet at 180 degrees.Open Lab A522 Counter mounted single gas cock GC1 LV Single outlet.Open Lab A522 Counter mounted single gas cock GC1 LA Single outlet.Open Lab A522 Counter mounted single gas cock GC1 G Single outlet.