1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics &...
-
Upload
priscilla-lewis -
Category
Documents
-
view
217 -
download
0
Transcript of 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics &...
![Page 1: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/1.jpg)
1 BROOKHAVEN SCIENCE ASSOCIATES
LBT Diagnostics Installation Update
Dan PadrazoDiagnostics & Instrumentation Group
Feb 1, 2012
![Page 2: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/2.jpg)
2 BROOKHAVEN SCIENCE ASSOCIATES
Acknowledgements
Om Singh Timur ShaftanIgor Pinayev Kurt VetterBernie Kosciuk Yong HuRay Fliller Sergei SeletskiyDick Hseuh Tony CaracappaMike Johanson
![Page 3: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/3.jpg)
3 BROOKHAVEN SCIENCE ASSOCIATES
Overview
Diagnostics Technical Support for Installation Diagnostics for Linac To Booster Transport Line Integration Model of LBT. Illustration of LBT Diagnostics Part 1 & 2. Illustration of LINAC BPM / PUE. Installation of LBT Diagnostics Part 1 Integration of LBT Diagnostics Part 1 Electronics, Racks, Controls Interface Injector Diagnostics Installation Schedule Summary / Status
![Page 4: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/4.jpg)
4 BROOKHAVEN SCIENCE ASSOCIATES
Diagnostics Technical Support for LBT Installation
Group Leader – Om Singh
Project Engineer – Dan Padrazo
Project Engineer- Bernie Kosciuk
Engineer – Bel Bacha
Engineer – Tony Caracappa
AP – Igor Pinayev
AP - Sergei Seletskiy
Technical Supervisor- Wayne Rambo
Technical Support – Jack Tallent, Chris Danneil,
Marshall Maggipinto, Artie Munoz, Al Borelli,
Dennis Poshka,George Stenby(MOU),
Dave Tupper(JS), Bill Brannigan(JS)
![Page 5: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/5.jpg)
5 BROOKHAVEN SCIENCE ASSOCIATES
Diagnostics Supported for (LBT / LINAC) Monitor Type Total
QTYPart-1QTY
Part-2 QTY
Resolution Measured Beam Parameter
FCT 2 1 1 .6pC/bunch Fill Pattern, Bunch Charge
ICT 2 1 1 .6pC/train Injected Bunch Charge, Efficiency
BPM-(LA) 1 1 30µ Beam Position
BPM-(SA) 5 2 3 30µ Beam Position
Energy Slit 1 1 Beam Energy Spread
Flag- LA-(40mm x 90mm) 2 2 OTR-50µYAG- 30µ
Energy Spread, Beam Size, Position
Flag-SA-(40mm) 7 5 2 OTR-50µYAG- 30µ
Beam Size, Position
Faraday Cup 2 2 .05-22nC Gross Charge per Train(0-150 Bunches)
BPM – (LINAC) 5 Beam Position
![Page 6: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/6.jpg)
6 BROOKHAVEN SCIENCE ASSOCIATES
Integration Model LBT Part 1 & 2
LBTL-Part 1
LBTL-Part 2
![Page 7: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/7.jpg)
7 BROOKHAVEN SCIENCE ASSOCIATES
2 Part 1 DiagnosticsMonitor Type Part 1 Qty IdentificationBPM-(SA) 2 LB-P1, LB-P3BPM-(LA) 1 LB-P2,Flag-SA 5 LB-VF1, LB-VF1BD1, LB-VF2BD1, LB-VF3BD1, LB-VF3Flag-LA 2 LB-VF2, LB-VF1BD2FCT 1 LB-FT1ICT 1 LB-IT1Energy Slit 1 LB-SL1Faraday Cup 2 LB-FC1BD1, LB-FC2BD2
Illustration LBT Diagnostics-Part 1
![Page 8: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/8.jpg)
8 BROOKHAVEN SCIENCE ASSOCIATES
Illustration LBT Diagnostics-Part 2
2 Part 2 DiagnosticsMonitor Type Part 2 Qty IdentificationBPM-(SA) 3 LB-P4, LB-P5, LB-P6Flag-SA 3 LB-VF3, LB-VF4, LB-VF5FCT 1 LB-FT2ICT 1 LB-IT2
![Page 9: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/9.jpg)
9 BROOKHAVEN SCIENCE ASSOCIATES
BPM Supported in LINAC
LIN-P1
LIN-P2
LIN-P3
LIN-P4
LIN-P5
LINAC BPM
![Page 10: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/10.jpg)
10 BROOKHAVEN SCIENCE ASSOCIATES
LA BPM Assembly 11-12-11
SA BPM Assembly 11-12-11
LA BPM Chamber- populated w/Button Feed-thru Assembly (11-12-11)
TL Button/Feed-thru assembly 11-15-11
Pre-Installation Work (LBT-BPM Chamber/PUE)
Fixture using single wire test
40mm x 90mmElliptical
![Page 11: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/11.jpg)
11 BROOKHAVEN SCIENCE ASSOCIATES
Pre-Installation Work (Testing Energy Slit/ Flags)
Test Rack used for Diagnostics Electronics and Controls. Test Stand using SP-1005 Girder top for SA Flag testing (11-23-11)
Energy Slit & LA Flag mounted on Production Version SP-1006 Girder, captured in portable clean room (11-4-11)
![Page 12: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/12.jpg)
12 BROOKHAVEN SCIENCE ASSOCIATES
Pre-Installation Work (FCT/ICT)
In-Flange Bergoz FCT- Cleaned and prepared for install.FCT-CF6”3/4-96.0-UHV-20:1-H
FCT-Test Fixture for Pre test prior to install
In-Flange Bergoz ICT – Cleaned and prepared for install.ICT-CF6”-60.4-UHV-070-20:1-H
Beam Charge Monitor ChassisBCM-IHR Module
![Page 13: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/13.jpg)
13 BROOKHAVEN SCIENCE ASSOCIATES
Tunnel Installation Work (LBT Part 1 & 2)
LBT Girder Install Part 1(11-7-11)
LBT Component Install Part 1(1-4-12)
LBT Part 2 Diagnostics Cables Pulled (12-6-11)
LBT Part 2 (11-30-11)
![Page 14: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/14.jpg)
14 BROOKHAVEN SCIENCE ASSOCIATES
Cable Description / Specification
LMR-240FR – Low Loss Coax Cable (RF BPM / ICT) Attenuation (db/ft) .057db @500Mhz Jacket Diameter .240” Custom trim to relative timing specification of +/-25pS, with a delta phase specification of 4.5 degrees @
500Mhz.
LMR-400FR – Low Loss Coax Cable (RF BPM / FC) Attenuation (db/ft) .028db @500Mhz Jacket Diameter .400”
LMR-900FR – Low Loss Coax Cable (FCT) Attenuation (db/ft) .014db @500Mhz Jacket Diameter .900”
SIO2 – Silicon Dioxide Low Loss Coax Cable (RF BPM) Attenuation (db/ft) .06db @500Mhz Jacket Diameter .141” Semi-Rigged, fired glass hermetically sealed assembly Commercially fabricated as a straight length and a relative timing specification of +/- 25ps, with a delta
phase specification of 4.5 degrees @ 500Mhz
![Page 15: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/15.jpg)
15 BROOKHAVEN SCIENCE ASSOCIATES
BPM Cable Work
LMR-240FR Cable install (11-8-11)
Pneumatic Crimp tool
Mobile Cart for Cable Time / Terminate (1-10-12)
SIO2 Cable Assembly (1Meter)
![Page 16: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/16.jpg)
16 BROOKHAVEN SCIENCE ASSOCIATES
BPM / PUE / PTC Module Installation
LINAC PTC Module Install (11-8-11)
Patch Panel Interface to PTC for LINAC
LBT-P1 BPM SA Chamber Assembly at SP-1002 Girder w/SIO2 Cables Installed 1-20-12
LIN-P5 BPM PUE Assembly w/LMR-240FR Cables (1-15-12)
![Page 17: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/17.jpg)
17 BROOKHAVEN SCIENCE ASSOCIATES
LBT Flags Installation
SA Flag Assembly at SP-1005 Girder
LA Flag Assembly at SP-1006 Girder
Tunnel patch panels for flag Pneumatics / PLC / Controls
Tunnel patch for Energy Slit / Flag at SP-1006
![Page 18: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/18.jpg)
18 BROOKHAVEN SCIENCE ASSOCIATES
LBT Beam Dump / Faraday Cup Install
Dump 1 at SP-3000 Girder (1-20-12)
Dump 2 at SP-4000 Girder (1-20-12)
![Page 19: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/19.jpg)
19 BROOKHAVEN SCIENCE ASSOCIATES
LBT Electronics Rack Layout
cPCI CPU board
cPCI Acqiris digitizer
![Page 20: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/20.jpg)
20 BROOKHAVEN SCIENCE ASSOCIATES
PLC Controls for Flags (Rear View)
Cable Route into Rack Penetrations (Top View)
BPM receiver LINAC (Front View)
Diagnostics Electronics / Cable Management (RG-Q)
Custom patch Panel /SR for LMR Cables (Top View)
![Page 21: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/21.jpg)
21 BROOKHAVEN SCIENCE ASSOCIATES
Injector Diagnostics Installation Schedule
![Page 22: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062518/56649e265503460f94b15522/html5/thumbnails/22.jpg)
22 BROOKHAVEN SCIENCE ASSOCIATES
Implemented Resources loaded Work Plan Diagnostics Component Tunnel Installation - Complete Diagnostics Cable pull, Time, Termination - Complete Diagnostics Electronics Install in Rack RG-Q1,2,3,4 - Complete Post installation Diagnostics Sub-System Functional testing - Complete System testing in progress, expected to be complete 2-13-2012
Summary / Status