1 A A Presentation Presentation on on ARR & Tariff Proposal of ARR & Tariff Proposal of CESU for FY 2007-08 CESU for FY 2007-08 Broad Broad Suggestions/Objections Suggestions/Objections Feburary 8, 2007 Feburary 8, 2007 ether, let us light up our lives. ORISSA ELECTRICITY REGULATORY COMMISSION ORISSA ELECTRICITY REGULATORY COMMISSION

Transcript of 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad...

Page 1: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

1

A A Presentation Presentation

on on ARR & Tariff Proposal of ARR & Tariff Proposal of

CESU for FY 2007-08CESU for FY 2007-08

BroadBroad Suggestions/ObjectionsSuggestions/Objections

Feburary 8, 2007Feburary 8, 2007

Together, let us light up our lives.

ORISSA ELECTRICITY REGULATORY COMMISSIONORISSA ELECTRICITY REGULATORY COMMISSION

Page 2: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

2

TARIFF FILING BEFORE THE COMMISSION FY 2007-08

ITEMS CESURev. Req. (Rs.Cr.) ( Including Reasonable Return & excluding Previous Losses) 1123.52

Power Purchase (MU) 5233.11

Anticipated Sale (MU) 3189.70

LT 1836.70

HT 743.16

EHT 609.84

Distribution Loss (%) 39.05%

OVER ALL SYSTEM LOSS (%) 42.10%

Collection Efficiency (%) 92.00%

AT&C LOSS (%) 43.92%

Exp. Rev.at Exist. Tariff (Net) (Rs.Cr.) 909.07

(Exp. Rev+Misc.Rev.) at Exist. Tariff (Net) (Rs.Cr.) 919.94

Revenue Gap ( +/- ) (Rs. Cr. ) -203.5781

Previous Losses (Rs. Cr. ) -907.90Revenue Gap ( +/- ) (Rs. Cr. ) including past losses at Existing Tariff -1111.48

Exp. Rev.at prop. Tariff (Net) (Rs.Cr.) 1057.67

(Exp. Rev+Misc.Rev.) at Prop. Tariff (Net) (Rs.Cr.) 1068.54

Addl. Rev. (Rs. Cr.) with prop. Tariff 148.60

Exist.Overall Average Tariff (Net) (p/u) 285.00

Prop. Overall Average Tariff (Net) (p/u) 331.59

Overall rise (%) 16.35%

Exist.LT Average Tariff (Net) (p/u) 271.00

Prop. LT Average Tariff (Net) (p/u) 331.59

Avr.Rise in LT Tariff (%) 22.36%

Exist.HT Average Tariff (Net) (p/u) 290.90

Prop. HT Average Tariff (Net) (p/u) 321.18

Avr.Rise in HT Tariff (%) 10.41%

Exist.EHT Average Tariff (Net) (p/u) 319.43

Prop. EHT Average Tariff (Net) (p/u) 344.28

Avr.Rise in EHT Tariff (%) 7.78%

Page 3: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

3

Growth(%) in Sale(MU) as proposed by CESU

Category FY 2005-06

FY 2006-07(April-

Sept)

FY 2006-07(Prop)

Growth (%)FY 2007-

08(Prop)

Growth (%) Remarks(Basis)

LT 1504 781.53 1551.84 3 1836.7 18  

Domestic 1038 547 1092 5 1312.02 20Impact of electrification under RE

programme

Irrigation 32.06 12.23 21.38 -33 21.38 - Metering of Irrigation consumers

HT 508.79 320.62 641.52 26 743.16 16Trend of FY 05-06& growth from

existing and new consumers

Large Ind. 253.32 158.95 313.91 24 389 24Growth from existing and 13

new1MVA consumers

Power Int. - - - - - - Addition of 1 new consumer

&enhancement of load

Mini Steel 36.32 35.42 80.048 120 90.72 13 Addition of 1 new consumer

EHT 379.28 230.9 512.99 35 609.84 19Trend of FY 05-06& growth from

existing and new consumers

Large Ind. 156.22 103.77 261.712 68 345.08 32 Increase in contract demand

Heavy Ind. 158.19 80.02 159.359 1 161.28 1 Adddition of 2 new consumers

Power Int. 11.64 0.65 1.595 -86 1.92 20  

Spl. Tar. - - - - - -  

Total Sale (MU) 2392 1333 2706.34 13 3189.7 18  

Power Purchase (MU)

4184.499 - 4778.83 14.203 5233.11 9.506

Energy input has been estimated based on the estimated

consumption of 4140 MU and distribution loss of 31%.

Dist. Loss (%) 43 - 43 - 39 -  

Page 4: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

4

Tariff StructureTariff Structure

• CESU has proposed – – Higher average tariff increase for subsidized categories than

the average tariff increase for subsidized categories – Allow a voltage wise loss stipulation for computing revenue

requirement– Allow the category wise tariff to bridge revenue gap– Allow the past losses as regulatory assets to be set off in

future years through tariff along with interest to be decided by the Commission

– A service may be levied on consumer for dishonoured cheques (Rs.200 for LT and Rs.1000 for HT/EHT)

Page 5: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

5

Tariff Structure…Contd..Tariff Structure…Contd..

– To give single point supply to all apartments to have better control and management

– Demand charge for maximum demand recorded during a month in addition to energy charge at the same rate as applicable to industries for emergency power supply to CPPs/generating stations

– DPS for LT consumers @1.25% per month for all categories of consumers

– In case increases in tariffs are not sufficient to bridge the entire revenue gap shall be bridged by reduction in BST and/or Govt. subsidy

– Considered actual AT&C loss in FY 2006-07 as base level for setting future loss reduction

Page 6: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

6

Tariff Structure…Contd..Tariff Structure…Contd..

– Increase in reconnection charge as under:

Connection Type Charges

Single Phase Domestic Consumer Rs. 250.00

Single Phase Other Consumer Rs. 500.00

3 Phase LT Consumer Rs. 2500.00

HT & EHT Consumer Rs. 5000.00

Page 7: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

7

BROAD TARIFF RELATED BROAD TARIFF RELATED ISSUES RAISED BY ISSUES RAISED BY

OBJECTORS OBJECTORS (To be addressed by the (To be addressed by the

Licensees)Licensees)

Page 8: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

8

Legal Issues• The ARR application filed by the licensee is not tenable under

law due to the following defects:– The licensees account has not been audited for FY 2004-05

and 2005-06. – The licensee has filed the application to confuse the

consumer public without disclosing the purpose for such filing.

– The interested persons are being kept in dark and not able to file effective objection and as such the purpose of such exercise has been frustrated and contrary to law and principle of natural justice.

– The procedure/method so adopted by the Commission be made simple and inexpensive.

– The licensee has failed to provide details as required under regulations to the Commission for consideration of his application as such the application may be rejected.

Page 9: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

9

Issues raised by Objectors

• Military Engineering Services

– There should be discriminatory Tariff between consumers of general category and of the defence.

• Distribution Loss:

– The licensee has miserably failed to arrest high Distribution loss on account of unauthorized use of power.

– Distribution loss should be calculated by taking ratio of units lost in distribution system excluding EHT sale.

– Since, a large chunk of consumers are still unmetered and having defective meters, the declared loss by the licensee is unrealistic.

• Collection Efficiency:

– The consumers are not to be burdened for in-efficiency of licensees to collect their energy dues from consumers every year.

Page 10: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

10

Issues raised by Objectors.. Contd..

• AT&C Loss

– AT&C concept should not be implemented as it hides the inefficiency of the Licensee.

• Power Factor Incentive/ Power Factor Penalty

– Power Factor incentive has to be calculated upto two decimal fraction

– Power factor penalty is levied for power factor less than 90% & power factor incentive should be given for power factors above 90% at the same rate.

– Power factor penalty for the small and medium industry consumer may be introduced.

• Cross Subsidy

– Bench Marks for gradual reduction of cross subsidy may be fixed from this year to achieve Zero level by 2009-10.

Page 11: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

11

Issues raised by Objectors.. Contd..

• Quality of Services:

– The industries are put to financial burden for being unable to

achieve 80% Load Factor due to the inability of the licensee to

supply proper quality power.

– Due to slow up gradation of the system and sub-station, the new

industries are finding difficult to get power connection.

– Voltage/frequency fluctuation –The accountability should be fixed

with the License in terms of financial compensation for the

fluctuation beyond standard norms.

Page 12: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

12

Issues raised by Objectors.. Contd..

• Consumer Classification

– Electricity tariff for poultry may be at par with agriculture.

• The State Government has decided to classify poultry as agriculture

– Reliance Telecom Ltd. and Reliance Infocomm Ltd. - Electricity energy may be charged at Industrial Rates instead of General Purpose rates to the IT & ITES Industries operating in the State

– BSNL Orissa Circle, Bhubaneswar• BSNL may be treated as an industrial undertaking as power is substantially

utilized as motive force for Industrial purpose and without supply of power it is not possible to run the Telecom services.

• The BSNL is coming under the purview of industry as per the verdict of the Hon’ble Supreme Court in several cases.

• So also as per the finance Act, 2002 w.e.f. 01.4.03, the business of providing Telecommunication Services has been declared as industrial undertaking.

Page 13: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

13

Issues raised by Objectors.. Contd..

• Financial Issues

– In absence of the audited balance sheet and report of the auditors it

is not possible for the objector to make proper observation on

financial matters.

– Employees cost – it is suggested that an increase of about 6% over

last year’s provision as was being given earlier, may be allowed

while fixing the employees cost for the FY 2007-08.

• Interests attributable to bonds

– The interest attributed to bonds against arrear of power purchases

cost and capital value of bonds are not payable by consumers.

Page 14: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

14

Issues raised by Objectors.. Contd..• Interests towards securitization

– The interest towards securitization as well as capital of securitization should not be passed on to the revenue requirement for tariff proposes.

– Infusing additional funds - The licensee may be directed to infuse additional funds as may be required to turn around the sector.

– Regulatory assets - Any losses that the distribution licensee likes to incur after complying with the orders of the Commission, can only be considered for the purpose of computing the Regulatory Assets.

– Employees cost - It is suggested that an increase of about 6% over last year’s provision may be allowed while fixing the employees cost for the FY 2007-08.

– Past Losses - Past losses should be paid through tariff by consumers only if these losses have been incurred due to reasons beyond the control of licensee and in spite of licensee having performed as per bench marks fixed by OERC.

Page 15: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

15

Issues raised by Objectors.. Contd..• Computation of Load Factor

– Load factor or consumption ratio to be determined on the basis of Maximum Demand recorded in the meter in accordance with Regulation 2(y) of the OERC Distribution (Conditions of Supply) Code, 2004.

– It will be just and proper to calculate the load factor on the basis of Maximum Demand or 80% of the Contract Demand whichever is higher.

– A lower load factor upto 50% may be prescribed for the period of annual maintenance, which will be jointly decided by the licensee and the consumer.

– The guaranteed load factor of 80% should be determined on an annual basis.

– Load factor may be computed separately for peak and off peak hours and the overall load factor be computed by integrating the above data.

– The LF be calculated based on the actual period of availability of unrestricted power supply during the month.

– The MD during the off peak hours should not be considered for computing the LF.

Page 16: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

16

Issues raised by Objectors.. Contd..

• Tariff Issues

– The gap of electricity charges between high consumption and low

consumption should be reduced to minimum level, which will

discourage theft of energy.

• Contract Demand

– Time frame for reducing the contract demand may not be imposed.

• Provision for Rebate

– Seven clear days may be given from the receipt of the bill to get the

rebate on prompt payment.

Page 17: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

17

Issues raised by Objectors.. Contd..

• Emergency Supply to CPPs

– The proposal of demand charges for emergency drawal to CPPs should be rejected.

– Emergency power requirement for CPP/Generating stations are very low and for short duration only, it is not at all justified to propose demand charges for emergency power to CPP’s.

• Rail-ways:

– Adoption of single part tariff for Railway traction.

– Proper adoption of simultaneous maximum demand for Railway traction supply.

– Railway may be exempted from payment of Security deposit.

– Stipulation of penalty on power factor if it goes below 0.85 as against 0.90.

– Stipulation of incentive for improvement in power factor above 0.85.

Page 18: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

18

Issues raised by Objectors.. Contd..

– Grant of relief to railways for power supply interruption as well as poor quality of supply.

– The tariff applicable to Railway Traction should reflect the cost of supply without any cross subsidy.

– As far as supply to Railway Traction Sub-station is concerned, the distribution companies are not entitled to any wheeling charges as non of their own asset is involved in the supply process.

– Ignoring of maximum demand of TSS’s during feed extensions as Railways are constrained to extend feed from adjacent TSS to the failed TSS zone.

– The tariff clause for industrial colony consumption should be applicable to Railway colony.

Page 19: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

19

Issues raised by Objectors.. Contd..

• General Issues

– The additional costs actual or estimated on account of the inefficiency/inability of licensee should not be passed on to the consumers through the tariff, either as a direct cost or a so called Regulatory Asset.

– Any cost due to additional power purchase, beyond the allowable distribution loss should not be included in the ARR of the licensee.

– Increase in the reconnection charge – no justification.

• The charges to the consumers should reflect the cost to the licensee.

– DPS for LT consumers – no justification.

• A LT consumer loses the rebate of 10 p/kwh in a month. Additional levy of DPS is thus unnecessary and un reasonable.

Page 20: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

20

Issues raised by Objectors.. Contd..

– The demand charges may be calculated prorate if the total of period of interruption (causing loss of production due to interruptions) and the pre-arranged shut downs availed on intimation, or statutory power cuts, exceeds 60 hours in a moth.

– The street light burning hours should be on actual time i.e. for 10 hours a day.

– The ceiling limit of 10% of total consumption for the colony consumption should be waived

– Electricity charges for the colony consumption should be at per with domestic rate because the electricity used in the colony is never used for any industrial purpose.

– Special tariff for running of FOUNDRY –A special tariff structure @50% of the existing tariff, may be introduced for running of the furnaces.

Page 21: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

21

Issues raised by Objectors.. Contd..

– Demand charges –

• The demand charges may be calculated on prorate basis for the actual period of power availability.

• The demand charges may be exempted if there is power interruption for more than 50 hours in a month.

– To have a uniform tariff for all consumers based on commercial principle of cost plus benefit basis.

– Separate Tariff may be introduced for Specified Public Purpose consumers under private sector especially for Educational Institutions.

Page 22: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

22

Issues raised by Objectors.. Contd..

– Service Connection charges - It is suggested that a realistic

amount in place of Rs500/- may be fixed so that the

Licensee can procure quality materials in time.

– Uniform rate may be introduced for LT (domestic) without

any slab system.

– Tariff Revision - The proposed tariff revision is not at all

desirable as there is no improvement in services.

Page 23: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

23

Issues raised by Objectors.. Contd..

• OERC Regulations

– During the initial period of supply, which is prescribed for five years, an Exit Clause should be provided since the consumer has right to choose it’s supplier.

– Customer’s Security Deposit – Consumers may be permitted to furnish bank guarantee or to open revolving letter of credit in favour of licensee in lieu of security deposit as it becomes extremely difficult for small and medium scale industry to invest such huge sum for purchase of power in cash.

– Period of agreement – The validity of power agreement is presently 5 years, should be reduced to 1 year in view of the changing market scenario and fluctuating market demands.

Page 24: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

24

BROAD TARIFF BROAD TARIFF RELATED ISSUESRELATED ISSUES

Page 25: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

25

The following areas have not been adequately addressed

• D.T. wise Energy Audit & Consumer Indexing for loss reduction

• Spot Billing & Collection for improvement of Collection Efficiency

• Repair & Maintenance

• Arrear Collection & Liquidation of power purchase dues

• Man power deployment ( Both Executive & Non Executive ) for

reducing AT & C Loss

• Non Investment in system improvement for Quality Supply

Page 26: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

26

Note: (i) CESU is required to submit the schedule of the provisional account for FY 2005-06 such as employees cost, R&M, A&G, Bad debt and other misc. expenses and revenue details, etc. which has not been submitted in their filing.

2005-06 2006-07 2007-08A. Expenditure Provisional Approved Proposed

Cost of Power Purchase 521.99 501.56 753.57Cost of Transmission 91.61Employee costs NA 113.10 168.36Repair & Maintenance NA 41.31 54.95

Administrative and General Expenses NA 13.11 16.46

Provision for Bad & Doubtful Debts NA 20.70 10.91Other expenses 0.14Depreciation 62.25 28.84 49.62

Interest Chargeable to Revenue including INT on SD 34.46 38.22 58.01Carrying cost 7.04Sub-Total 855.49 1111.88Less: Expenses capitalised 0Total expenses 791.09 855.49 1111.88

B. Special appropriation

Amortisation of Regulatory AssetPast Losses 0 907.90Contingency reserveTotal 0.00 907.90

C Return on equity 11.64 11.63TOTAL(A+B+C) 867.13 2031.41

D. Less Miscellaneous Receipt 9.86 31.22 10.87E. Total Revenue Requirement 781.23 835.91 2020.54F. Expected Revenue(Full year ) 697.16 828.15 909.07G. GAP(+/-) -84.07 -7.76 -1111.47

REVENUE REQUIREMENT OF CESU FOR 2007-08 (Rs in Crore)

Page 27: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

27

Revenue Requirement of CESU .. Contd..

• The tax audit report submitted for the year ended 31st March 2006 does not contained the profit and loss and balance sheet for FY 2005-06. The same may be submitted.

• CESU for the FY 2007-08 has not bifurcated the amount to be expended towards cost of power purchase and cost of transmission. The same may be submitted.

• Actual expenditure against the above heads of expenditure for first six months of FY 2006-07 has not been provided by the licensee. The same may be submitted.

• The reason for proposing higher amount of employee cost of Rs.168.36 crore for 2007-08 as against the approved figure of Rs.113.10 crore for FY 2006-07 needs to be explained.

• The reason for proposing higher amount of R&M expenses of Rs.54.95 crore for 2007-08 as against the approved amount of Rs.41.31 crore for the FY 2006-07 needs to be explained.

• Similarly, the quantum proposed for interest amounting Rs.58.01 crore for FY 2007-08 is nearly Rs.20 crore more than the approved amount of Rs.38.22 crore for FY 2006-07. This needs to be explained.

• It may be justified as to why the past losses of Rs.907.90 crore proposed for the FY 2007-08 may be allowed and if so how far it is reasonable.

Page 28: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

28

Year Approved ActualFY 1999-00 19.05 24.01FY 2000-01 19.57 19.91FY 2001-02 23.43 15.6FY 2002-03 22.11 25.04FY 2003-04 24.12 21.21

FY 2004-05 31.9538.86

(Provisional)

FY 2005-06 33.6747.79

(Provisional)

FY 2006-07 41.3149.78

(Estimate)FY 2007-08 54.95 (Prop)

R&M Expenses of CESU (Rs. Cr.)

Page 29: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

29

Provision for Bad & Doubtful Debt

  Approved (Rs. Cr.) Actual (Rs. Cr.)

1999-00 12.81 19.49

2000-01 15.59 22.35

2001-02 18.62 27.17

2002-03 21.04 19.70

2003-04 19.13 14.79

2004-05 16.82 17.27 (Prov.)

2005-06 17.17 11.50 (Prov)

2006-07 20.70 14.07 (Est.)

2007-08 10.91 (Prop.)

Page 30: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

30

Fixed Assets addition during the Financial Years in Rs. Cr. – CESU

Approved Actual

FY 2001-02 52.78 67.25

FY 2002-03 73.47 127.01

FY 2003-04 85.36 88.42

FY 2004-05 31.92 40.80

FY 2005-06 66.2845.51 (Provisional)

FY 2006-07 (Proposed)

39.55 36.97 (RE)

FY 2007-08 (Proposed)

95.67 

Page 31: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

31

Business Plan Vrs. ARR

• A comparison of figures in Business Plan and ARR from FY

2004-05 to 2007-08 with regard to Distribution Loss,

Collection Efficiency and AT&C Loss, present two different

sets of figures with wide margins as follows:

Page 32: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

32

CESU’s ARR Filing Vrs. Business Plan

 Dist. Loss

(%)Col. Efficiency

(%)AT&C Loss

(%)

FY 2004-05 (ARR) 41 82 49

FY 2004-05 (B.Plan) 39 83 49.37

FY 2005-06(Prop) 40 86 48

FY 2005-06(B.Plan) 36 86 44.96

FY 2006-07(Prop) 36 89 43

FY 2006-07(B.Plan) 33 89 40.37

FY 2007-08(Prop) 39 92 44

FY 2007-08(B.Plan) 30 92 35.60

Page 33: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

33

Finance related issues

• Position of Accounts need to be explained.

• Investment details have not been specified.

• Capital Works In Progress - capability of huge investment

proposal has not been justified.

• Action plan for settlement and collection of arrears outstanding

with the consumers have not been spelt out.

• No Action Plan for establishment of Special Police Station & Special

Court has been given.

Page 34: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

34

Issue of Regulatory Assets • National Tariff Policy on Regulatory Assets stipulates

– Pass through of past losses or profits should be allowed to the extent caused by uncontrollable factors.

– The facility of a regulatory asset should be done only as exception, and subject to the following guidelines.

– should only include natural causes or force majeure conditions

– Carrying cost of Regulatory Asset should be allowed to the utilities

– Recovery of Regulatory Asset should be time-bound and within a period not exceeding three years at the most and preferably within control period.

– The use of the facility of Regulatory asset should not be repetitive.

• Does the claim of Licensee conform to the National Tariff Policy?

Page 35: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

35

Average Revenue Billed (P/U) Vrs Actual as filed by CESU in ARR filings

Voltage Category

2002-03 2003-04 2004-05

2005-06 (April’05

- Jan.’06)- Actual

2005-06 (April’05-March’06) (Actual)

2006-07 (April -

Sept'06) –(Actual)

2007-08 (Licensee’s Estt. at Prop. rate)

LT 253 266 271 262.7 263 261 331.59

HT 379 391 385 373.3 372 362 321.18

EHT 464 306 359 338.6 338 335 344.28

Overall 305 295 307 297.7 298 298 331.59

Note: What is the cause for reduction of HT average between (April'05-March'06) & (April'05-Jan'06) ? Financial Impact on account of reduced unit rate at HT works out to Rs. 0.66Cr. . This needs to be clarified by the Licensee.

Page 36: 1 APresentationon ARR & Tariff Proposal of CESU for FY 2007-08 BroadSuggestions/Objections Broad Suggestions/Objections Feburary 8, 2007 Together, let.

36

Power Purchase Cost and Revenue billed in Rs.cr

 FY 2002-03

FY 2003-04

Difference w.r.t previous FY

FY 2004-05

Difference w.r.t previous FY

FY 2005-06

Difference w.r.t previous FY

Cumulative Difference

BST bill (Rs cr.) 530.59 518.85 -11.74 516.42 -2.43 528.41 11.99 -2.18

EHT/HT billing 295.46 299.22 3.76 293.74 -5.48 317.68 23.94 22.22

LT billing 371.46 392.4 20.94 397.25 4.85 395.38 -1.87 23.92

NOTE : The above table indicates that the billing in HT/EHT is higher through the years than the rise in BST bill, but there is high Distribution loss and poor collection efficiency at LT.