24 January 2007 1

SIS Report to CESG/CMC

24 January 2007R. Durst, D. Stanton

Page 2: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 2

SIS AREA REPORT

CONTENTS

A. CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA

B. SUMMARY DOCUMENT STATUS

C. SUMMARY TECHNICAL STATUS OF EACH WG & BOF

D. CROSS-AREA TECHNICAL ISSUES

Page 3: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 3

1. Space Packet Protocol WG – Presented as part of SLS-SLP report

2. CFDP Interoperability Testing WG

3. Cislunar Space Internetworking WG

4. Asynchronous Messaging Service WG

5. IP-over-CCSDS WG

6. Mars Communications Profile BOF

A. LIST OF CURRENT WGs AND BOFs WITHIN AREA

SIS AREA REPORT

Page 4: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 4

B. SIS Document Summary Status

WG Document Number Status

Space Packet Protocol Reported within SLS

Space Packet Protocol 130.3-G-0.4 Agency Review concluded; In WG Review

CFDP Interop Test

CCSDS File Delivery Protocol (CFDP)-Notebook of Common Inter-AgencyTests for Core Procedures (newdocument)

CCSDS File Delivery Protocol (CFDP)-Notebook of Common Inter-Agency Tests for Extended Procedures (new document)

CCSDS File Delivery Protocol (CFDP)-Notebook of Common Inter-Agency Tests for Store and Forward Overlay (SFO) (new document)

CCSDS File Delivery Protocol (CFDP)-Part 1: Introduction and Overview (update to issue 2)

CCSDS File Delivery Protocol (CFDP)-Part 2: Implementers Guide (update to issue 2)

CCSDS File Delivery Protocol (CFDP)-Part 3: Interoperability Testing Final Report

720.4-Y-1

720.5-Y-1

720.6-Y-1

720.1-G-3

720.2-G-3

720.3-G-0.9

Pre-CESG Review/ Prep for CESG/CMC Appr.

Pre-CESG Review/ Prep for CESG/CMC Appr.

Pre-CESG Review/ Prep for CESG/CMC Appr.

In CESG Review, Ends 12 Feb 07(Unacked CFDP Extensions – Unchartered Carper legacy)In CESG Review, Ends 12 Feb 07(Unacked CFDP Extensions – Unchartered Carper legacy)Pre-CESG Review/ Prep for CESG/CMC Appr.

Page 5: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 5

SIS Document Summary Status (Continued)

WG Document Number StatusCislunar Space InternetSpace Communications Protocol

Specification (SCPS)—Network Protocol (SCPS-NP)

Cislunar Space Internetworking—Architecture

CSI Profile 1 (Magenta Book)

713.0-P-1.1

730.1-G-0

In WG Review – WG Concludes no update required

In CESG Review, Ends 12 Feb 2007

In development within WG

Asynchronous Message ServiceCCSDS Asynchronous Message

ServiceAMS Green Book

735.1-R-0.1 In Agency Review, Ends 31 Jan 2007

Not yet started, requires charter update

IP Over CCSDSIP over CCSDS Space Links 702.1-R-1 (M) Agency Review ended 22 Dec 2006, WG RID

resolution completed

Page 6: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 6

C. SUMMARY TECHNICAL STATUS1. SPACE PACKET PROTOCOL WG

This work reported in the SLS-SLP WG of the SLS area

SIS AREA REPORT

Page 7: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 7

2. CFDP INTEROPERABILITY TESTING WG

Goal: Complete CFDP SFO and Extended Procedures interoperability testing

Working Group Summary Situation:

Working Group Summary progress:• 12 RIDs received during Agency Review (10 INPE, 2 JAXA).

• 1 Approved, 1 Approved with Modification, 3 Rejected, 7 Out of Scope• 7 Out of Scope RIDs were on the base CFDP blue book, not the Pink

Sheets• Agency RID Review Dispositioning complete,

• No need for second round of Agency Review• Document approved for publication as 727-B-04 per Secretariat

• The need for a corrigendum to 727-B-04 has been identified to clarify an issue raised in the Pink Sheet review

status: OK CAUTION PROBLEM

comment: Agency Review RIDs dispositioned.

SIS AREA REPORT

Page 8: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 8

SIS AREA REPORT

2. CFDP INTEROPERABILITY TESTING WG

Document Summary:• CFDP Green Books (720.1-G-3, 720.2-G-3) updates in CESG review• Forthcoming Books (in Secretariat’s editing queue)

• Three interoperability testing notebooks (common interoperability tests for core, extended, SFO – 720.4-Y-1, 720,5-Y-1, 720.6-Y-1)

• Interoperability Testing Final Report (720.3-G-1)• Working group will be dissolved when Green books are updated and

approved for publication

CFDP Segment Metadata BOF• Meeting of working group endorsed formation of CFDP Segment Metadata

BOF• Optional capability to attach metadata to each CFDP file segment• Purpose is to clarify and enhance processing of record-structured files

Page 9: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 9

3. CISLUNAR SPACE INTERNETWORKING WG (CSIWG)

Goal: Design a communications architecture for cislunar and possible Mars in-situ environments; update existing CCSDS standards to reflect recent advances in telecommunications.

Working Group Status: Active _X_ Idle ____

Working Group Summary Situation:

Working Group Summary progress:• Green Book in CESG Review, closes 12 February 2007.

• WG agreed that long-outstanding RID concerning SCPS-NP’s inability to carry IPSec AH information did not warrant document change. WG concludes that IPSec AH is largely deprecated in favor of IPSec ESP with a null encryption algorithm, which SCPS-NP can carry.

• The WG is currently developing first draft Magenta Book, Part 1.

Problems and Issues:• The working group is running 6-9 months behind its charter due to WG personnel

responsibilities to Constellation project. WG has split its current Magenta book into multiple parts. Depending on the rate of progress before the next CCSDS meeting, this may need to be addressed by a charter modification.

• Need close coordination between CSI WG and the proposed Mars WG to ensure appropriate evolution toward Mars In-Situ protocol selection and routing approaches.

status: OK CAUTION PROBLEM

comment: Schedule

SIS AREA REPORT

Page 10: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 10

4. ASYNCHROUS MESSAGING SERVICE WG

Goal: Resolve relationship between AMS and MOIMS SM&C, SOIS App. Supt. Svces

Working Group Status: Active

Working Group Summary Situation:

Working Group Summary progress:• RIDs from CESG review resolved – Service classes seen as the appropriate way of dealing

with issues raised

• 2nd Implementation:

• NASA/GSFC will develop prototype in FY07. Options:

• Java implementation of entire AMS protocol suite

• C implementation, possibly phased through multiple service classes

• CNES may develop prototype in Java for high-altitude balloon operations.

• NASA/MSFC may develop prototype in C# for Windows.

Problems and Issues:

• None

status: OK CAUTION PROBLEM

comment:

SIS AREA REPORT

Page 11: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 11

4. ASYNCHROUS MESSAGING SERVICE WG (Continued)

Future Plan:

• Complete agency review of initial AMS Red Book, resolve RIDs (nominally complete by end of July 2007)

• GSFC Java implementation progresses during RID resolution, both JPL and GSFC implementations modified as necessary to reflect RID resolution

• Interoperability testing begins September 2007, interim report in Darmstadt, completion by end of 2007

• Jan-Feb 2008: Draft Interoperability Testing report and revise Red Book if necessary to reflect issues identified by interoperability testing

• Estimate CESG/Agency Review in February-April 2008

• Green Book preparation in February-April (during Red book review)

• RID Resolution, Final Blue Book Text Preparation May-June, 2008

• Submit to CMC for Blue Book publication, July 2008, Green Book review

• Green Book publication end of September 2008

• Dissolution after Fall 2008 meetings

Charter update in progress to reflect revised schedule/resources

SIS AREA REPORT

Page 12: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 12

5. IP over CCSDS Links WG

Goals:

• Progress white book to Red book status.

• WG Status: Active X Idle ____

status: OK CAUTION PROBLEM

comment: Agency ReviewRID Resolution

SIS AREA REPORT

Working Group Summary progress:• Agency Review RID resolution against Red-1 Draft Magenta book

• RIDs editorial in nature, all accepted• WG discussion provided slight organizational changes to help

facilitate the user’s understanding of the summary information presented in the book

• These changes will be made by the author before submission to the CCSDS secretariat

Problems and Issues:As discussed in joint CESG/CMC meeting: inadequate agency review

performed. Action to secretariat to extend agency review until 1 March 2007.

Page 13: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 13

6. Mars Interoperability Birds of a Feather

Goals:

• Form a Mars Interoperability Working Group.

• WG Status: Active X Idle ____

status: OK CAUTION PROBLEM

comment: Draft Charter Complete

SIS AREA REPORT

BOF Summary progress:• Draft Charter complete and submitted for approval• Expected products: PICS proforma for Prox-1, Magenta Book specifying

near-term Mars Profile, Green Book describing evolution of Mars networking capabilities

Problems and Issues:• Coordination needed with SLS, Cislunar WG

Page 14: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 14

D. Cross Area Issues

• AMS/SOIS, AMS/SM&C – Cross-area meetings held to discuss issues, initial Service Class definitions created

• Mars WG is defining PICS Pro Forma and selecting options in Proximity 1 Protocol, needs to coordinate with SLS

• Cislunar/High-Rate Uplink coordination required on an ongoing basis. Have requested more specific HRU requirements from Cislunar chair.

• Intra-Area Issue: SIS Plenary was on Saturday, only NASA participation, not all WG Chairs present

Page 15: 1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.

24 January 2007 15

Attendance

WG Registrants:Shows

Day 1 Day 2 Day 3 Day 4 Day 5 Agencies

CFDP Interop. Testing

6:2 2 ESA,NASA

Cislunar 25:16 3 15 9 CSA,ESA,NASA

AMS 19:8 3 8 5 BNSC, CSA,ESA NASA,NRL*, UC- Boulder*

IP Over CCSDS

21:4 4 NASA

Mars NA:13 13 BNSC, ESA,NASA

Plenary 9:5 5 NASA

*Not CCSDS-affiliated