1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to...

22
1 2009-2012 VBMP Orthophotography Status

Transcript of 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to...

Page 1: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

1

2009-2012 VBMP Orthophotography Status

Page 2: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

2

2009-2012 Orthophotography Contract

• Contract Awarded to Sanborn on December 23rd

• Planned Maximum Budget: $6.0 Million (2006/07 Budget)

• Statewide 1 Foot Resolution Orthophotography– Eastern Half of State Will Be Captured during 2009 and

Western Half Will Be Captured during 2011• Digital Capture • Faster Delivery

– Intermediate County Mosaics within 60 days– Final Ortho Delivery within 6 Months of Acquisition

• Delivery Will Include Color Infrared Band (4 band color)

Page 3: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

3

2009/2011 Flight Areas

Page 4: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

4

Pricing for Core Products

Product 2009 Price Per Tile

2007 Price Per Tile

1 Foot Orthophotos

$60.00 $115.43

6 Inch Orthophotos

$64.50 $76.90

4 Foot Contours $27.20 $36.00

2 Foot Contours $13.60 $23.11

Page 5: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

5

2009 Contract Value• 1 Foot Base Orthophotography

– $1,484,280• Orthophotography Resolution Upgrades

– $372,780• 4 Foot Contours

– $27,690• 2 Foot Contours

– $6,718Total Value = $1,891,468

Page 6: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

6

Imagery Acquisition

• Acquisition began on February 1st, 2009• Acquisition completed on March 31st, 2009

– 87% of photos were captured by February 25th

• 33,628 Images Acquired– 26 Terabytes of raw imagery!

Page 7: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:
Page 8: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

2009 Upgrades

Page 9: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

9

Additional Upgrades

• 4 Foot Contours– Halifax County

• 2 Foot Contours– Blacksburg– Charlottesville– Fredericksburg– Hopewell

• Impervious Surface– James City County

Page 10: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

10

Raw Image SamplesPrince George (6 Inch) – February 20th, 2009

Page 11: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

11

Raw Image SamplesPrince George (6 Inch) – February 20th, 2009

Page 12: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

12

Raw Image SamplesMonticello (6 Inch) – February 21st, 2009

Page 13: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

13

Raw Image SamplesMonticello (6 Inch) – February 21st, 2009

Page 14: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

14

Image ComparisonsMonticello (6 Inch) – True Color

Page 15: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

15

Image ComparisonsMonticello (6 Inch) – Color Infrared

Page 16: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

16

Raw Image SamplesYork County (6 Inch) – February 21st, 2009

Page 17: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

17

Raw Image SamplesYork County (6 Inch) – February 21st, 2009

Page 18: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

18

Image ComparisonsIsle of Wight (1 Foot), 2002

JamesRiverBridge

Page 19: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

19

Image ComparisonsIsle of Wight (6 Inch), 2007

JamesRiverBridge

Page 20: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

20

Image ComparisonsIsle of Wight (1 Foot), 2009

JamesRiverBridge

Page 21: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

21

Data Delivery• Delivery of preliminary mosaics will begin

on May 1st

– 1 foot resolution for entire 2009 flight area– No QA/QC performed on products– Orthorectified using 2006/2007 terrain models– VGIN plans to offer mapservice as primary

delivery method

• Final products delivered by September 30– 4 Band GeoTiff and JPG2000 tiles– Digital Terrain Models

Page 22: 1 2009-2012 VBMP Orthophotography Status. 2 2009-2012 Orthophotography Contract Contract Awarded to Sanborn on December 23 rd Planned Maximum Budget:

22

File Sizes of Final Deliverables• Uncompressed GeoTiff

– 100 MB per tile– 2.89 TB for 2009 flight area

• Lossless JPG2000* (5:1 compression)– 20 MB per tile– 592 GB for 2009 flight area

* MrSID format does not support more than 3 bands so JPG2000 has been chosen as the delivery format