Professor Gerry Land

CPA, CDFM-ADefense Acquisition University

Capital & Northeast Region

Fort Belvoir, VA

(703) 805-3755; DSN 655-3755

E-mail: [email protected]

2010 PDI – June 2010

Programming and Budgeting Policies

for Acquisition Programs

Page 3: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

3

Funding Policies Workshop Topics

• Budgeting Building Blocks • Funding Policies

- Annual Funding

- Incremental Funding

- Full Funding

- Advance Procurement

- Multiyear Procurement (economic order quantity)

• Exceptions to Full Funding

- Communications and Information Systems

- LRIP Articles

- Product Improvements

• Funding Policies for Unique Items

Page 4: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

4

SAC SASC SBC HAC HASC HBC

BudgetExecution

Congressional Enactment

Operational Capability Force StructureModernizationReadinessSustainability

BudgetResolution

Authorization &

Appropriation Laws

OperationalCapability

Need

EstimateCostAnalysis

Life CycleCost

ICE

FiscalEnvironmentPOE

CCE

A o A

CAIV

AnnualFunding

IncrementalFunding

Funding Policies Full

Funding (Exceptions)

Planning, Programming, Budgeting and Execution Process

President’sBudget

Budget Authority Obligation ReprogrammingFeedbackCommitment Expenditure Outlay

MBIs

FYDP GDF POM FOL CP MFP JPG BES PDM PBD

Capability Docs

Acquisition Program Baseline

Resource Management Flow from Identification of Capability Need to Achieving Operational Capability

Capabilities-Based

Assessment

Page 5: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

5

What is Needed to Build a Program Budget?

A statement of what the program manager is expected to do – the Acquisition Program Baseline (APB)

A translation of the program direction into a statement of the tasks required to achieve the program objectives

Program Direction:

Work Breakdown Structure (WBS):

Schedule:The sequence of tasks in the WBS –

• Showing when each task begins and ends

• How tasks are related to each other

• How workload/cost for each task is distributed within the time period

Page 6: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

6

Appropriation Categoriesvs. Appropriation Accounts

• Appropriation Categories

• Definition: Broad, generic terms pertaining to general “types” of Federal Government funds.

• Examples of interest to Acquisition Community:

• Research, Development, Test and Evaluation (RDT&E)

• Procurement

• Military Construction (MILCON)

• Appropriation Accounts

• Definition: Specific designation of Federal Government funds as contained in an Appropriations Act passed by Congress and

signed into law by President. Each account has a unique four digit code preceded by a two digit prefix.

• Examples of interest to Acquisition Community:

• Research, Development, Test and Evaluation (RDT&E), Army (2040)

• Aircraft Procurement, Navy (1506)

• Operations & Maintenance (O&M), Air Force (3400)

Page 7: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

7

DoD Appropriation Account Codes

Appropriation Account

RDT&E

Procurement

Aircraft

Missiles

Weapons

W&TCV

Ammunition

SCN

Other

USMC

MILPERS

O&M

MILCON

Army

21 -

2040

2031

2032

2033

2034

2035

2010

2020

2050

DoD Wide

97 -

0400

0300

N/A

0100

0500

Air Force

57 -

3600

3010

3020

3011

3080

3500

3400

3300

USMC

17 -

1109

1105

1106

Navy

17 -

1319

1506

1507

1508

1611

1810

1453

1804

1205

Page 8: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

8

Underlying Assumptions in Budgeting

• Funding is requested (i.e., budgeted) for the fiscal year when the organization honestly “requires” the funds in accordance with proper funding policy

• Correct level of funding requested (i.e., budgeted) for a fiscal year is based on required level of work effort plus application of proper funding policy for that Appropriation

• “Color of money” (i.e., Appropriation) requested in the budget is based on type of work to be performed

• Application of proper funding policy implies that funds will be obligated during the first year of availability

• Normally, funding is requested for a 12 month fiscal year (1 October – 30 September of following year)

Page 9: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

9

“Notional” Example of Preparing Input for

FY10 FY11 FY12 FY13 FY14 TOTAL

Price Today (Base Yr $ ) Outlay Rate ( % ) Cumulative Inflation ( % )

Dollar “Value” ( $ ) When Outlaid

“Required Budget” Estimate (Current/Then Yr $ )

Budget Estimate = “Price Today in Base Yr $” plus inflation plus economic effects of outlays occurring in future years

$$

Year Budget Prepared

FY 2012 Budget - Applying Escalation

To go from “Price Today” to “Required Budget”, multiple “ Price Today” by proper Weighted (Composite) Index of Appropriation Account

Target Fiscal Year

$$$

Page 10: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

10

Major Appropriation Categories

Scope / Type of Work Effort

2 Years Program Element

Incremental

Full

Full

Annual

Annual

1 Year

1 Year

3 Years

5 Years

Line Item

Sub-Activity Group

Budget Activity

Project

Period Available

for Obligation

R&D Activities and Expenses

Useable End Items >= $250K system unit cost; Centrally managed items; Initial Spares; Labor for certain production-related functions (e.g., item assembly, quality assurance)

Military Personnel Expenses

Major Construction Projects >$750K

Replenishment Spares; Fuel; Civilian Pay; Travel; Construction Projects <$750K; Non-Centrally managed end items <$250K system unit cost

Control Level (Budgeting)

Funding Policy

Appropriation CategoryRDT&E

Procurement

O&M

MILPER

MILCON

(SCN) (5 Years)

Page 11: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

11

Annual FundingPolicy

• Appropriations:• Operations and Maintenance• Military Personnel

• Budgeting Policy:• Annual budget request will be

limited to obligation authority necessary to cover all expenses during a 12 month budget period (usually the fiscal year).

Page 12: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

12

Service ContractException to

Annual Funding Policy

• Exception to budgeting for “Fiscal Year” period

• U.S. Code, Title 10, Section 2410a provides authority for DoD to budget for and obligate funds for severable service contracts for periods crossing fiscal years --provided the contract period does not exceed 12 months

Page 13: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

13

Supplies

TDY

$ 510 K $ 520 K$ 500 K

$ 30 K

$ 50 K$ 40 K

FY 1 FY 2 FY 3 FY 4Expense

Expenses by Fiscal Year

Budget Request

Service Contract

Annual Funding Policy

Period when expenses are being incurred

$ 645 K $ 585 K $ 600 K

Simple Application – O&M Appropriation

Civ Pay $ 525 K

$ 35 K$ 25 K $ 30 K $ 35 K

12 Month

$ 40 K $ 35 K $ 40 K

$ 585 K

Page 14: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

14

Incremental Funding Policy

• Appropriation:

Research, Development, Test & Evaluation (RDT&E)

• Budgeting Policy:

• Annual budget request will be limited to budget authority necessary to cover all costs expected to be incurred during that fiscal year

• Incremental Funding Policy provides flexibility to the government in the uncertain environment of RDT&E

Page 15: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

15

Purposes of theIncremental Funding Policy

• Allows Congress to review progress of every R&D project – each year – and decide if the project should continue and, if so, at what dollar amount

• Does not require one Congress to “tie the hands” of a future Congress

• Provides DoD flexibility to fund R&D projects on a year-by-year basis

Page 16: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

16

18 Month Exception toIncremental Funding

Policy

• For requirements with no logical way to divide the work to limit contract to a shorter period, or

• If the planned technical effort is such that no responsible contractor will accept a contract for less than completion of the total requirement

• For these types of efforts that take longer than 12 months, but less than 18 months, the Service or Defense Agency Comptroller may approve financing the total requirement in one fiscal year

Page 17: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

17

How does a Program Office Prepareits Budget under Incremental Funding ?

• Create a good estimate of expected future costs to be incurred (even though system design may be unstable and contractor may not be chosen)

• Use 9-months or less of effort for first year increment of a “new start” program (due to nature/timing of budget approval)

• For second and succeeding yearly increments, budget for entire year, taking into account any changes (slippages) that may have occurred from previous budget submissionNote: Service or Agency comptroller may approve up to 15 months of costs

for second and succeeding fiscal years (i.e., 3 months beyond end of fiscal year)

Page 18: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

18

TASK 1$ 300 K

TASK 2$ 150 K

$ 100 K $ 100 K$ 50 K

$ 100 K$ 25 K $ 25 K

$ 10 K $ 50 K $ 40 K

FY 1 FY 2 FY 3 FY 4Task Cost

Cost Incurred by Contractor by Fiscal Year

Budget Request

TASK 3$ 100 K

Incremental Funding Policy

Planned Period of Performance (i.e, planning for costs to be incurred)

$ 50 K $135 K $250 K $ 115 K

Simple Application – RDT&E Appropriation

36 month effort

18 month effort

24 month effort

$ 50 K

Page 19: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

19

Full Funding Policy

• Applies to Procurement and Military Construction Appropriations

• Annual budget request must cover the total cost to deliver a given quantity of complete, militarily usable end items in a 12 month funded delivery period

• Governing Concepts• Usable End Items - Piecemeal procurement of systems

is not permitted • Funded Delivery Period - 12 month period starting with

projected delivery of first item

• Exceptions to Policy• Advanced Procurement (For Long Lead Items)

• Economic Order Quantity (With Multiyear Procurement)

Page 20: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

20

Purposes of Full Funding Policy

• Allows Congress to understand the full cost of a complete weapon system through budget process

• Does not require one Congress to “tie the hands” of a future Congress

• Avoids purchase of a large number of partially completed systems, followed by the need for more money to complete these systems

• Achieves better program stability - but on a year by year basis

Page 21: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

21

Concept of “Usable End Items”Which Program is Correct Under Full Funding?

Program A Program BYear 1 Year 1

Year 2 Year 2

Page 22: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

22

LOT 1 ($400K)

Start Up Costs:

2 2 3 3

FY 1 FY 2 FY 3 FY 4

Contract Award Date

Production Lead Time

How We Expect the Contractor to Incur Cost by FY

Budget Request:

10 Items

Recurring Production Costs:

$ 40 K

$ 30 K

$ 0 K

$140 K

$ 0 K

$140 K

$ 0 K

$ 50 K

$140 K $ 50 K$140 K$ 70 K

Full Funding Policy Conceptual - Procurement Category

($400K)

Page 23: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

23

FY 1 FY 2 FY 3 FY 4

LOT 1

10 ITEMS

LOT 2

20 ITEMS

LOT 3

40 ITEMS

Budget Request

Lot Cost

$ 400 K

$ 600 K

$ 900 K

2 2 3 3 = 10

5 5 5 5 = 20

8 10

Full Funding Policy Simple Application - Procurement Appropriation

= 18

+ 22

$ 400 K $ 900 K$ 600 K - 0 -

Page 24: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

24

Application of Funded Delivery Period Policy

FY 1 FY 2 FY 3 FY 4 FY 5

2 2 3 3 5 5 5 5 8 10

Production Lead Time

Production Lead Time

Funded DeliveryPeriod

Production Lead Time

12 Months of Deliveries

12 MonthsOf Deliveries

X X X X X X

Defer to Later Fiscal Years

LOT 1

QTY 10

LOT 2

QTY 20

LOT 3

QTY 18

“Requirement” is for 48 Tanks Delivered by End FY 5

Contract Award

Proposed Deliveries

Contract Action

Contract Action

5 5 5 5

8 10

Deliveries

Page 25: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

25

Advance ProcurementLong Lead-time Items

• Exception to Full Funding Policy– Explanation why an exception: the PMO is

not buying usable end items

– Shown in Acquisition Strategy

– Approved in Milestone Decision • Circumstances that justify use:

– When necessary to maintain (protect) planned production schedule

– Lead-time of component greater than life of the appropriation

– Lead-time of component significantly longer than remainder of end item

• Budgetary Implications:– Minimum amount budgeted = termination liability of total cost of long

lead-time items being procured

– Budgeted amount generally requested one fiscal year in advance of related end item contract

– Budgeted amount is shown as a separate line entry on various budget exhibits (e.g., P-1, P-5, P-40)

Page 26: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

26

Advance Procurement Application with Procurement Appropriation

LOT 3 ($400M) 20 Items

LOT 4 ($700M)

38 Items

ADVANCEPROCUREMENT

* BA ADV PROC BA SYS

BA TOTAL (FY)

* Separate Budget Line Line Item one fiscal year in advance of associated production contract

$ 700M

$ 400M

- $ 10M

+ $ 10M

- $ 15M

+ $ 15M

$ 10M

$ 390M

$ 405M $ 685M

$ 685M

$ - 0 -

FY 1 FY 2 FY 3 FY 4

Page 27: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

27

Associated with Multiyear Procurement (MYP)

• Exception to Full Funding Policy – Explanation why an exception: Contracted deliveries

will exceed the 12 month funded delivery period

• Definition of MYP – A generic term that describes the process, planning and

ultimate contract by which the government may contract for the purchase of supplies or services that satisfy requirements for more than one but normally not more than five years.

Source: DoD 7000.14-R, Vol 2A, Chap 1, Section 010203

Economic Order Quantity (EOQ)

Page 28: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

28

• Commitment to buy a specific quantity of useable end items of a weapon system over a specified number of years (normally, maximum of five years)

• Annual Appropriation by Congress for same specified number of years

• Purpose:

- To reduce program cost growth

- To counteract adverse effects of the annual budget and procurement process

- To bring stability to acquisition process

Multiyear Procurement (MYP)Continued

Page 29: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

29

• Benefits: – Provides assurance to contractor of future years

procurement– Encourages contractor investment– Facilitates economic order quantities – Increases contractor productivity

• Potential problems:– Government liable for a penalty (in a decreasing amount)

for early cancellation of contract – Can not budget for that cancellation/termination liability – Controversial concept (both in Congress & OSD)

Multiyear Procurement (MYP)Continued

Page 30: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

30

FundedUnits

1 4 5 6 9 9 9 9 9 9 9 9 9 9 9 9 9 9 8

1 2 3 4 5 FY 1 FY 2 FY 3 FY 4 FY 5 FY 6 FY 7

End Items$M

EOQ Items$M

$ $ $ $

Multiyear Procurement (MYP) Contract(Example of Budget Preparation for a MYP Contract)

Budget in same method as Full

Funding

Except for items budgeted under

“EOQ” rules

16 36 36 36 26

$ 60

$250 $ 514 $ 523 $ 508 $ 356

$

Deliveries of Production ItemsProduction Lead Time

Notification to Contractor and Obligation of Funds

Assumes a 92% Learning Curve and composite indices appropriate to given fiscal years

Contract Award

Page 31: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

31

• Program: F/A-18 Super Hornet and E/A-18 Growler • Proposed quantity of aircraft: 124 total • Time period: FY 2010 through FY 2013• Contractor: Boeing • Projected contract award: NLT 30 Sep 2010• Potential savings compared to annual contract

actions: $590 Million (approximately 10% of basic contract with annual options)

• Congress provided conditional authority in FY 2010 NDAA and FY 2010 Defense Appropriations Act

• On 14 May 2010 OSD notified Congressional leaders of intent to award the MYP contract for aircraft

Recent ExampleMultiyear Procurement (MYP)

Page 32: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

32

Funding Rules for Communications and Information Systems

• RDT&E- Development, test and evaluation costs- Development of major upgrades- Hardware/Software for RDT&E facilities

• Procurement - Investment- New equipment / SW > $250K- Upgrades / replacement equipment > $250K

• O&M - Expenses

- New equipment / SW < $250K- Upgrades / replacement equipment < $250K - Routine maintenance- Equipment leases

Page 33: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

33

Low Rate Initial Production

PURPOSE APPROPRIATIONProcurement

Procurement

RDT&E

Procurement

Primary Purpose and Proper Appropriation

To permit an orderly increase in production ramp-up

To establish an initial production base

To provide production configured representative articles for operational test -

* Articles planned to be destroyed during testing – or planned to not go into operational inventory

* Articles scheduled to go into operational inventory

RDT&E is default, but use . . . . .

Page 34: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

34

Funding for Product Improvements

MOD INCREASES

PERFORMANCE?NO

Fund MOD Kits for End Items and

the installation of Kits with . . . PROCUREMENT

YESSYSTEM IN

PRODUCTION?

NOYESFund Development and

Testing with . . .

(including MOD Kits used

for Testing)

RDT & E PROCUREMENT O & M

INDEPENDENT DT OR

IOT&E REQUIRED?

YESNO

IF . . . .

THEN . . . .

AND . . . .

Decision Tree

Page 35: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

35

MOD INCREASES

PERFORMANCE?

PROCUREMENT

YES

RDT & E

IF . . . .

AND . . . .

Fund MOD Kits for End Items and

the installation of Kits with . . .

THEN . . . .Fund Development and

Testing with . . .

(including MOD Kits used

for Testing)

Funding for Product ImprovementsDecision Tree

Page 36: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

36

MOD INCREASES

PERFORMANCE?NO

PROCUREMENT

INDEPENDENT DT OR

IOT&E REQUIRED?

YES

IF . . . .

Funding for Product ImprovementsDecision Tree

AND . . . .Fund MOD Kits for End Items and

the installation of Kits with . . .

RDT & E

THEN . . . .

Fund Development and

Testing with . . .

(including MOD Kits used

for Testing)

Page 37: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

37

MOD INCREASES

PERFORMANCE?NO

PROCUREMENT

SYSTEM IN

PRODUCTION?

YES

PROCUREMENT

INDEPENDENT DT OR

IOT&E REQUIRED?

NO

IF . . . .

THEN . . . .

AND . . . .

Funding for Product ImprovementsDecision Tree

Fund MOD Kits for End Items and

the installation of Kits with . . .

Fund Development and

Testing with . . .

(including MOD Kits used

for Testing)

Page 38: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

38

MOD INCREASES

PERFORMANCE?NO

PROCUREMENT

SYSTEM IN

PRODUCTION?

O & M

INDEPENDENT DT OR

IOT&E REQUIRED?

NO

NO

IF . . . .

THEN . . . .

AND . . . .

Funding for Product ImprovementsDecision Tree

Fund MOD Kits for End Items and

the installation of Kits with . . .

Fund Development and

Testing with . . .

(including MOD Kits used

for Testing)

Page 39: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

39

Funding for Product Improvements

MOD INCREASES

PERFORMANCE?NO

PROCUREMENT

YESSYSTEM IN

PRODUCTION?

NOYES

RDT & E PROCUREMENT O & M

INDEPENDENT DT OR

IOT&E REQUIRED?

YESNO

IF . . . .

THEN . . . .

AND . . . .

Decision Tree

Fund MOD Kits for End Items and

the installation of Kits with . . .

Fund Development and

Testing with . . .

(including MOD Kits used

for Testing)

Page 40: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

40

• Each appropriation category has a specific set of policies pertaining to budget formulation.

• Budgeting policies are based on agreements between Congress and OSD.

• Budget requests in the Budget Estimate Submission (BES) and the President’s Budget (PB) should be prepared in accordance with applicable policies.

Summary

Page 41: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

41

Questions?

Now for the DAU optional “commercial”

Page 42: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

Briefing for DAU Students

Learn. Perform.

Succeed.

Jan 2010’05 ’06 ’07

#1

’02 ’06 ’04 ’06 ’07 ’09 ’03 ’04

Page 43: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

Provide a global learning environment to support a mission-ready Defense Acquisition Workforce that develops, delivers, and sustains effective and affordable warfighting capabilities.

DAU Mission

Impact acquisition excellence through:Acquisition certification and

leadership trainingMission assistance to

acquisition organizationsOnline knowledge sharing

resourcesContinuous learning assetsStrategic workforce planning

Page 44: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

AT&L Performance Learning Model

Knowledge SharingDAP - Online portal to Big A & HCI knowledgeACC - DoD's online collaborative communitiesVirtual Library - Online connection to DAU research collection

Training CoursesClassroom & online DAWIA, Core Plus, & Executive

Mission AssistanceConsulting - Helping organizations solve complex acquisition problemsTargeted Training - Tailored organizational trainingRapid Deployment Training - On-site & online training on the latest AT&L policies

Continuous LearningCL Modules - Online, self-paced learning modulesConferences - PEO / SYSCOM, Business Managers, DAU Acquisition Community Symposium

Formal & informal learning at the point

of need

Page 45: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

Located with our Customers

We are part of the community, not just a place to take classes.

Region Location Workforce

Capital/Northeast Fort Belvoir, VA 31,566

Mid-Atlantic California, MD 23,110

Midwest Kettering, OH 18,604

South Huntsville, AL 28,360

West San Diego, CA 25,465

Page 46: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

Learning assets at www.dau.mil

Acquisition Community Connection

https://acc.dau.mil/

http://www.dau.mil/images/Pages/mission_assistance.aspx

Mission Assistance

https://dap.dau.mil

http://icatalog.dau.mil/

Defense Acquisition Portal

DAU Training & CL Courses

DAU Acker Library

http://www.dau.mil/Library/

Acquisition BestPractices Clearinghouse

https://bpch.dau.mil/

Page 47: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

DAU’s iCatalog

• Most current resource for information regarding DAU courses and the Certification & Core Plus Development Guides

• Accessible from the DAU home page (http://dau.mil) or directly at http://icatalog.dau.mil/

Page 48: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

FY10 Training - Financial Management

BCF 301Advanced

Financial Management

CLM 031Improve Statement

of Work

CLM 013Work Breakdown

Structure

Level III Certification

ACQ 101Fundamentals of Systems Acquisition Management

BCF 106 Fundamentals of

Cost Analysis

BCF 103Fundamentals of Business

Financial Management

BCF 102Fundamentals of Earned

Value Management

Level I Certification Level II Certification

BCF 211Intermediate Business

Acquisition Management

BCF 203Intermediate Earned Value Management

BCF 205Contractor Business

Strategies

CLM 017Risk Management

CLM 024Contracting Overview

Level I “Core Plus”Courses & CL Module

(See DAU iCatalog)

Level III “Core Plus”Courses & CL Module

(See DAU iCatalog)

Level II “Core Plus”Courses & CL Module

(See DAU iCatalog)

Case Based Case BasedKnowledge Based

Vers 10

25 hrs, online

26 hrs, online

15 hrs, online

40 hrs, online

9 days classroom 4 days classroom

5 days classroom

9 days classroom

ACQ 201BIntermediate Systems

Acquisition , Part B

5 days classroom

ACQ 201AIntermediate Systems

Acquisition, Part A

37 hrs, online

Page 49: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

FY10 Training - Cost Estimating

Level II Certification Level III CertificationLevel I Certification

ACQ 101Fundamentals of Systems Acquisition Management

ACQ 201BIntermediate Systems

Acquisition, Part B

BCF 211Acquisition Business

Management

BCF 106 Fundamentals of Cost

Analysis

BCF 103Fundamentals of

Business Financial Management

BCF 102Fundamentals of

Earned Value Management

BCF 107Applied Cost

Analysis

BCF 302Advanced Concepts in Cost

Analysis

CLB 030Cost Data Sources

CLB 023Software Cost Estimating

BCF 206Cost Risk Analysis

BCF 204Intermediate Cost Analysis

BCF 215Operating and Support

Cost Analysis

CLB 029Rates

CLB 026Forecasting Techniques

Level I “Core Plus”Courses & CL Module

(See DAU iCatalog)

Level III “Core Plus”Courses & CL Module

(See DAU iCatalog)

Level II “Core Plus”Courses & CL Module

(See DAU iCatalog)

Case Based Case BasedKnowledge Based

Vers 10

25 hrs, online

26 hours, online15 hrs, online

5 days classroom40 hrs, online 5 days classroom

10 days classroom 4 days classroom

5 days classroom

5 days classroom

5 days classroom

ACQ 201AIntermediate Systems

Acquisition, Part A

37 hrs, online

Page 50: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

DAU’s Commitment to the Defense Acquisition Workforce

Shaping a culture of engagement and career-long learning

•Training - 24 / 7 learning assets: in the classroom and in the workplace

•Continuous Learning - Helping you learn in the workplace: what you need to know , when you need to know it

•Mission Assistance - Supporting your organization

•Knowledge Sharing - Connecting you – the Engaged Learner - with the experts, resources and materials you need to do your job

Page 51: 1. 2 Professor Gerry Land CPA, CDFM-A Defense Acquisition University Capital & Northeast Region Fort Belvoir, VA (703) 805-3755; DSN 655-3755 E-mail:

51