Page 1: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

1

Page 2: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

2

First BIMSTEC Energy Ministers’ Conference: October 4, 2005.

Declaration regarding Hydro Power• Reiterate that all hydro POWER projects ,irrespective of their

size, are clean and renewable sources of energy and developing the hydro potential of the BIMSTEC region would facilitate economic development of the concerned area in particular and the region in general.

• Resolve to develop the full hydro-power potential of the region ensuring that concerns of rehabilitation and environment are addressed adequately.

• Agree to share and strengthen our capabilities in the field of planning ,design and construction ,operation & maintenance and renovation of hydro power stations.

Page 3: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

3

• Appreciate the ongoing cooperation among the member countries for development of various hydro projects and call upon all the member countries to further enhance cooperation.

Plan of Action: India to host a workshop on “Sharing of experiences in

developing hydro projects” – Hence, this workshop.

Page 4: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

4

INTER-COUNTRY COOPERATION IN HYDRO SECTOR

At present, India has cooperation in the field of hydro power with:

• BHUTAN• NEPAL• MYANMAR

Page 5: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

5

BHUTAN

Page 6: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

6

H.E. POTENTIAL IN BHUTAN

• Total Potential - 30,000 MW

• Feasibile Potential - 23,760 MW

• Present Hydro Installed Capacity

- about 470 MW (pre-Tala HEP)

- about 1490 MW (post Tala HEP)

Page 7: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

7

MAJOR RIVER SYSTEMS IN BHUTAN

• Torsa

• Wangchu (Raidak)

• Sankosh

• Manas

Page 8: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

8

AGREEMENTS /MOUs WITH BHUTAN

• Umbrella Agreement concerning cooperation in the field of Hydroelectric Power- July,2006

• MOU regarding the preparation of DPRs for Punatsangchhu (Stage-II) and Mangdechhu H.E. Projects- Jan,2005

• MOU regarding preparation of DPR for Punatsangchhu Stage-I project- Sept’2003.

• Agreement regarding the execution of Tala Hydro-electric Project- March, 1996.

Page 9: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

9

AGREEMENTS /MOUs WITH BHUTAN

• Agreement on Trade and Commerce between India and Bhutan- Feb,1995

• Agreement regarding the execution of Kurichu Hydro-electric Project- Feb,1994

• Agreement regarding the execution of Chukha Hydro-electric Project- March, 1974.

Page 10: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

10

INDO-BHUTAN COOPERATION PROJECTS CONSTRUCTED /BEING

CONSTRUCTED WITH INDIAN ASSISTANCE

• Projects in Operation1. Chukha( 336 MW) – Commissioned: 1986-

882. Kurichu(60 MW) – Commissioned: 2001-

03• Projects under Construction1. Tala(1020 MW)- Partially Commissioned (6

Units of 170 MW each commissioned)

Page 11: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

11

INDO-BHUTAN COOPERATION PROJECTS

DPR prepared1. Punatsangchu-I( 1095 MW)2. Wangchu( 900 MW)3. Bunakha( 180 MW)4. Sankosh(4060 MW)- MultipurposeDPR under prepartion1. Punatsangchu-II( 1000 MW)2. Mangdechu( 360/600 MW)Pre-feasibility Report Prepared1. Manas(2800 MW)- Multipurpose

Page 12: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

12

UMBRELLA AGREMENT BETWEEN INDIA AND

BHUTNA• Signed in July 2006• Both Governments have agreed to facilitate,

encourage and promote development and construction of hydropower projects and associated transmission systems as well as trade in electricity.

• Projects to be developed both through public and private sector participation and would be governed by separate project implementation and power purchase agreements.

• For projects to be implemented jointly, suitably

Page 13: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

13

empowered joint group would be set up to facilitate identification of projects, preparation of DPRs and selection of agencies for speedy implementation of projects.

• For construction and operation of hydro projects in Bhutan by public sector and government owned agencies, India shall facilitate availing of facilities including financing from Financial Institutions in India and deployment of human resources.

• Government of India has agreed to a minimum import of 5000 MW of electricity from Bhutan by the year 2020.

Page 14: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

14

NEPAL

Page 15: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

15

H.E. POTENTIAL IN NEPAL

• Total Potential - 83,000 MW

• Exploitable Potential - 43,000 MW

• Present Hydro Installed Capacity

- about 565 MW

Page 16: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

16

MAJOR RIVER SYSTEMS IN NEPAL

• Kosi• Gandak• Karnali• Mahakali• Southern Rivers

Page 17: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

17

AGREEMENTS /JOINT COMMITTEES WITH NEPAL

• Treaty signed in 1996 concerning the Integrated Development of the Mahakali river including Sarada Barrage, Tanakpur Barrage and Pancheshwar Project.

• Joint Group of Experts(JGE) for Pancheshwar Project.• Joint Team of Experts(JTE) for other Hydro Projects in

Nepal.• India-Nepal Joint Committee on Water Resources (JCWR).• Umbrella agreement on power exchange between India and

Nepal.• Setting up of Joint Project Offices.

Page 18: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

18

PROJECTS IMPLEMENTED WITH INDIAN ASSISTANCE

Name of the Project

Installed Capacity (MW)

Year of Commissionin

g POKHRA 1 1968

TRISULI 21 1969

WESTERN GANDAK

15 1979

DEVI GHAT 14.1 1983

Page 19: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

19

PROJECTS UNDER DISCUSSION AT VARIOUS LEVELS

Multipurpose Schemes

• Karnali Multipurpose Project (10800 MW)• Sapta Kosi High Dam Multipurpose Project (3300

MW) & Sun Kosi Storage-cum-Diversion Diversion Scheme

• Pancheshwar Multipurpose (5600 MW)

Other Hydro Projects under consideration

• Burhi Gandaki (600 MW)• Upper Karnali (300 MW)

Page 20: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

20

MYANMAR

Page 21: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

21

H.E. POTENTIAL IN MYANMAR

• Total Potential – 39,720 MW

• Present Hydro Installed Capacity - about 747 MW

• Capacity Under Development - about 10,400 MW

Page 22: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

22

MAJOR RIVER SYSTEMS IN MYANMAR

• Ayeyawady

• Thanlwin

• Sittaung

• Chindwin

Page 23: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

23

INDO-MYANMAR COOPERATION IN DEVELOPMENT OF H.E.

PROJECTS• Design & Engineering of Sedawyagi HE

Project was carried out by CEA.• A no. of G&D Stations have also been set up

by Govt. of India in connection with Tamanthi project.

• A Technical Team comprising officers from CEA, CWC, GSI and WAPCOS visited Myanmar in Mar., 2001 in connection with the development of Yeywa project (700 MW).

Page 24: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

24

INDO-MYANMAR COOPERATION PROJECTS

• Pre-Feasibility Report has been prepared by NHPC for Tamanthi HE Project (1200 MW) and submitted in April, 2005.

• A Team comprising officers from MEA, CEA and NHPC visited Myanmar in May, 2006 in connection with exploring further cooperation in Tamanthi HE Project.

Page 25: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

25

TAMANTI HE PROJECT• PFR prepared by NHPC in April 2005.• Multipurpose storage project on river Chindwin• Mutual Benefit Project:- Benefits of power,

irrigation, navigation and flood moderation to Myanmar and benefit of import of power to India.

• After DPR is prepared, discussions can be held regarding implementation of the project

• Further scope for development of Stage-II (about 400 MW) and Stage-III (about 700 MW) projects on the downstream of the Stage-I project.

Page 26: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

26

SCOPE FOR INTER-COUNTRY COOPPERATION

Page 27: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

27

Issues involved in exploiting hydro power potential in

BIMSTEC Region• Himalayan Territory – Difficult terrain and inaccessible sites.

• Geological difficulties and uncertainties.• Engineering challenges in construction of

projects especially the tunnels.• Complexities involved in construction of Storage

Projects – land acquisition, resettlement & rehabilitation issues, dam safety concerns and apportionment of costs between various components like power, irrigation, drinking water, flood moderation, navigation etc.

Page 28: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

28

• Countries like Bhutan, Nepal and Myanmar possess significant potential but have comparatively low domestic demand.

• India is a major market for power – demand in India is rising steadily.

• Construction of Trans-national grids for export/ import of power – technical, planning and operational standards of the national grids to be harmonised for removing barriers to grid interconnections.

• Arranging financing for hydroelectric projects.• Requirement of competent and skilled manpower

for construction and operation of projects.

Page 29: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

29

SERVICES THAT CAN BE OFFERED BY INDIA FOR DEVELOPMENT OF HYDEL

RESOURCES

• Systematic assessment of hydro power potential & Identification of projects• Preparation of Pre-feasibility Reports (PFRs) • Carrying out of detailed Survey & Investigation • Hydro Power Planning and carrying out of Power Potential Studies• Preparation of Detailed Project Reports

Page 30: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

30

• Detailed Design and Engineering.• Construction/ Monitoring of large/medium

Hydel Projects.• Renovation & Modernisation and uprating of

existing plants.• Facilitate availing of finances from FIs in India.• Deployment of skilled technical and

managerial manpower.• Organising training of manpower to impart

requisite skills.

Page 31: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

31

CONCLUSIONTremendous scope of inter-country cooperation for exploiting hydel potential in BIMSTEC countries for mutual benefits.India can render assistance in developing hydro potential of BIMSTEC countries from Concept to Commissioning.MoU/Agreement(s) could be reached amongst BIMSTEC countries to enhance cooperation in the field of hydro power.

Page 32: 1. 2 First BIMSTEC Energy Ministers Conference: October 4, 2005. Declaration regarding Hydro Power Reiterate that all hydro POWER projects,irrespective.

32